A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning
This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this...