A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning
This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this...
Saved in:
| Published in: | International journal of production research Vol. 51; no. 3; pp. 847 - 868 |
|---|---|
| Main Authors: | , |
| Format: | Journal Article |
| Language: | English |
| Published: |
London
Taylor & Francis Group
01.02.2013
Taylor & Francis LLC |
| Subjects: | |
| ISSN: | 0020-7543, 1366-588X |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Summary: | This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this problem, we develop a branch and bound (B&B) algorithm (hereafter called the B&BA). Several lower bounds, dominance rules and upper bounds are developed to enhance the performance of the B&BA. Extensive computational experiments on randomly generated problems with different configurations are conducted and the results show that the proposed method can find optimal solutions for problems with up to 18 jobs in a reasonable amount of computation time. |
|---|---|
| Bibliography: | SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-2 content type line 23 |
| ISSN: | 0020-7543 1366-588X |
| DOI: | 10.1080/00207543.2012.676683 |