Okamura, L. Y., Borges, C. L., & Chicco, G. (2025). Trade-off between computation time and solution quality for integrated generation and transmission expansion planning with N-1 security criterion. International journal of electrical power & energy systems, 164, 110444. https://doi.org/10.1016/j.ijepes.2024.110444
Citácia podle Chicago (17th ed.)Okamura, Lucas Y., Carmen L.T Borges, a Gianfranco Chicco. "Trade-off Between Computation Time and Solution Quality for Integrated Generation and Transmission Expansion Planning with N-1 Security Criterion." International Journal of Electrical Power & Energy Systems 164 (2025): 110444. https://doi.org/10.1016/j.ijepes.2024.110444.
Citácia podľa MLA (8th ed.)Okamura, Lucas Y., et al. "Trade-off Between Computation Time and Solution Quality for Integrated Generation and Transmission Expansion Planning with N-1 Security Criterion." International Journal of Electrical Power & Energy Systems, vol. 164, 2025, p. 110444, https://doi.org/10.1016/j.ijepes.2024.110444.