Two-machine flow shop scheduling with a common due date to maximize total early work

•Two-machine ow shop scheduling to maximize total early work is considered.•A dynamic programming approach running in O(n2d2) time is proposed.•A fully polynomial time approximation scheme (FPTAS) is developed.•The approximation results work for the weighted model - if a specific constraint is satis...

Full description

Saved in:
Bibliographic Details
Published in:European journal of operational research Vol. 300; no. 2; pp. 504 - 511
Main Authors: Chen, Xin, Miao, Qian, Lin, Bertrand M.T., Sterna, Malgorzata, Blazewicz, Jacek
Format: Journal Article
Language:English
Published: Elsevier B.V 16.07.2022
Subjects:
ISSN:0377-2217, 1872-6860
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract •Two-machine ow shop scheduling to maximize total early work is considered.•A dynamic programming approach running in O(n2d2) time is proposed.•A fully polynomial time approximation scheme (FPTAS) is developed.•The approximation results work for the weighted model - if a specific constraint is satisfied. This paper considers scheduling in a two-machine flow shop to maximize the total early work subject to a common due date. The early work of a job is a parameter defined as the total amount of the job that is processed before the specified due date. We mainly focus on the unweighted model in this paper, and propose a dynamic programming approach running in O(n2d2) time (compared with the previous result in O(n2d4) time for the weighted case discussed in the literature). Then we analyse the problem from an approximation point of view, in which we first show that Johnson’s algorithm, one of the most classical ones in flow shop scheduling, can only achieve the worst performance ratio for the considered problem (although it is an optimal one for makespan minimization). With the motivation of proposing better approximation algorithms, we further design a fully polynomial time approximation scheme (FPTAS). Finally, we point out that the approximation results also work for the weighted model - if a specific constraint is satisfied.
AbstractList •Two-machine ow shop scheduling to maximize total early work is considered.•A dynamic programming approach running in O(n2d2) time is proposed.•A fully polynomial time approximation scheme (FPTAS) is developed.•The approximation results work for the weighted model - if a specific constraint is satisfied. This paper considers scheduling in a two-machine flow shop to maximize the total early work subject to a common due date. The early work of a job is a parameter defined as the total amount of the job that is processed before the specified due date. We mainly focus on the unweighted model in this paper, and propose a dynamic programming approach running in O(n2d2) time (compared with the previous result in O(n2d4) time for the weighted case discussed in the literature). Then we analyse the problem from an approximation point of view, in which we first show that Johnson’s algorithm, one of the most classical ones in flow shop scheduling, can only achieve the worst performance ratio for the considered problem (although it is an optimal one for makespan minimization). With the motivation of proposing better approximation algorithms, we further design a fully polynomial time approximation scheme (FPTAS). Finally, we point out that the approximation results also work for the weighted model - if a specific constraint is satisfied.
Author Chen, Xin
Lin, Bertrand M.T.
Blazewicz, Jacek
Sterna, Malgorzata
Miao, Qian
Author_xml – sequence: 1
  givenname: Xin
  surname: Chen
  fullname: Chen, Xin
  organization: Liaoning University of Technology, School of Electronics and Information Engineering, Shiying 169, Jinzhou 121001, China
– sequence: 2
  givenname: Qian
  surname: Miao
  fullname: Miao, Qian
  organization: Dalian University of Technology, School of Software, Tuqiang 321, Dalian 116023, China
– sequence: 3
  givenname: Bertrand M.T.
  orcidid: 0000-0003-0456-296X
  surname: Lin
  fullname: Lin, Bertrand M.T.
  email: bmtlin@mail.nctu.edu.tw
  organization: National Yang Ming Chiao Tung University, Institute of Information Management, Shinchu 300, Taiwan
– sequence: 4
  givenname: Malgorzata
  orcidid: 0000-0002-3845-8194
  surname: Sterna
  fullname: Sterna, Malgorzata
  organization: Poznan University of Technology, Institute of Computing Science, Piotrowo 2, Poznan 60-965, Poland
– sequence: 5
  givenname: Jacek
  surname: Blazewicz
  fullname: Blazewicz, Jacek
  organization: Poznan University of Technology, Institute of Computing Science, Piotrowo 2, Poznan 60-965, Poland
BookMark eNp90M9LwzAUwPEgE9ym_4Cn_AOtSbomGXiR4S8YeJnnkCWvNrVtRpI5519vyzx52CmPwOfB-87QpPc9IHRLSU4J5XdNDo0POSOM5kTkpCwv0JRKwTIuOZmgKSmEyBij4grNYmwIIbSk5RRtNgefddrUrgdctf6AY-13OJoa7L51_Qc-uFRjjY3vOt9juwdsdQKcPO70t-vczzgn3WLQoT3igw-f1-iy0m2Em793jt6fHjerl2z99vy6elhnpuBlyjRlCwNcm2q7gFJzaQ0vt2RJGcACDJeaySWxRkhZFWT4NIIvBdjKFpoPppgjdtprgo8xQKV2wXU6HBUlauyiGjV2UWMXRYQaugxI_kPGJZ2c71PQrj1P708UhqO-HAQVjYPegHUBTFLWu3P8FyH2gqg
CitedBy_id crossref_primary_10_1287_ijoc_2023_0038
crossref_primary_10_1016_j_jmsy_2023_12_006
crossref_primary_10_1016_j_asoc_2024_111842
crossref_primary_10_1002_nav_22076
crossref_primary_10_46399_muhendismakina_1504239
crossref_primary_10_1080_0305215X_2024_2372633
crossref_primary_10_3390_math11194060
crossref_primary_10_1016_j_cie_2024_109915
Cites_doi 10.1016/j.omega.2010.06.006
10.1007/s10951-015-0464-7
10.1016/j.dam.2020.05.023
10.1080/00207543.2018.1456693
10.1080/0305215X.2018.1519073
10.1016/j.cie.2009.05.011
10.1016/j.cie.2005.09.001
10.1080/03052150500420439
10.1002/nav.21813
10.1016/j.cie.2020.106449
10.1016/S0166-218X(03)00339-1
10.1080/0305215X.2018.1554066
10.1007/s11590-011-0334-y
10.1007/978-3-540-30176-9_9
10.1016/S0167-5060(08)70356-X
10.1016/j.ejor.2020.03.032
10.1016/j.ejor.2019.12.003
10.1016/0167-6377(92)90001-J
10.1287/opre.40.3.586
10.1002/nav.21863
10.1002/nav.3800010110
10.1007/s10951-012-0303-z
10.1016/j.cor.2006.03.021
10.1016/j.omega.2021.102453
10.1016/j.ejor.2004.04.011
10.1002/nav.21936
10.1287/moor.19.1.86
10.1007/s10957-017-1147-7
10.1016/j.cie.2017.07.016
10.1002/nav.21684
ContentType Journal Article
Copyright 2021 Elsevier B.V.
Copyright_xml – notice: 2021 Elsevier B.V.
DBID AAYXX
CITATION
DOI 10.1016/j.ejor.2021.07.055
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Computer Science
Business
EISSN 1872-6860
EndPage 511
ExternalDocumentID 10_1016_j_ejor_2021_07_055
S0377221721006652
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
4.4
457
4G.
5GY
5VS
6OB
7-5
71M
8P~
9JN
9JO
AAAKF
AABNK
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AARIN
AAXUO
AAYFN
ABAOU
ABBOA
ABFNM
ABFRF
ABJNI
ABMAC
ABUCO
ABYKQ
ACAZW
ACDAQ
ACGFO
ACGFS
ACIWK
ACNCT
ACRLP
ACZNC
ADBBV
ADEZE
ADGUI
AEBSH
AEFWE
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHZHX
AIALX
AIEXJ
AIGVJ
AIKHN
AITUG
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOUOD
APLSM
ARUGR
AXJTR
BKOJK
BKOMP
BLXMC
CS3
DU5
EBS
EFJIC
EFLBG
EO8
EO9
EP2
EP3
F5P
FDB
FIRID
FNPLU
FYGXN
G-Q
GBLVA
GBOLZ
HAMUX
IHE
J1W
KOM
LY1
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
ROL
RPZ
RXW
SCC
SDF
SDG
SDP
SDS
SES
SPC
SPCBC
SSB
SSD
SSV
SSW
SSZ
T5K
TAE
TN5
U5U
XPP
ZMT
~02
~G-
1OL
29G
41~
9DU
AAAKG
AAQXK
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ABXDB
ACLOT
ACNNM
ACRPL
ACVFH
ADCNI
ADIYS
ADJOM
ADMUD
ADNMO
ADXHL
AEIPS
AEUPX
AFFNX
AFJKZ
AFPUW
AGQPQ
AI.
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
ASPBG
AVWKF
AZFZN
CITATION
EFKBS
EJD
FEDTE
FGOYB
HVGLF
HZ~
R2-
SEW
VH1
WUQ
~HD
ID FETCH-LOGICAL-c365t-a124ce6acfb4e5a68dc65b0912ee4ec68a2890dc788f302eec7697edfd3a6fb43
ISICitedReferencesCount 10
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000819872700009&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0377-2217
IngestDate Tue Nov 18 20:47:29 EST 2025
Sat Nov 29 07:20:29 EST 2025
Fri Feb 23 02:41:10 EST 2024
IsPeerReviewed true
IsScholarly true
Issue 2
Keywords Early and late work
Dynamic programming
Combinatorial optimization
FPTAS
Flow shop scheduling
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c365t-a124ce6acfb4e5a68dc65b0912ee4ec68a2890dc788f302eec7697edfd3a6fb43
ORCID 0000-0003-0456-296X
0000-0002-3845-8194
PageCount 8
ParticipantIDs crossref_primary_10_1016_j_ejor_2021_07_055
crossref_citationtrail_10_1016_j_ejor_2021_07_055
elsevier_sciencedirect_doi_10_1016_j_ejor_2021_07_055
PublicationCentury 2000
PublicationDate 2022-07-16
PublicationDateYYYYMMDD 2022-07-16
PublicationDate_xml – month: 07
  year: 2022
  text: 2022-07-16
  day: 16
PublicationDecade 2020
PublicationTitle European journal of operational research
PublicationYear 2022
Publisher Elsevier B.V
Publisher_xml – name: Elsevier B.V
References Wang, Yu, Qiu, Yin, Cheng (bib0032) 2020; 67
Błażewicz (bib0001) 1984; 3
Chen, Chau, Xie, Sterna, Błażewicz (bib0011) 2017; 111
Chen, Sterna, Han, Błażewicz (bib0015) 2016; 19
Kovalyov, Potts, Van Wassenhove (bib0022) 1994; 19
Yin, Yang, Wang, Cheng, Wu (bib0036) 2018; 65
Györgyi, Kis (bib0020) 2020; 286
Sterna, M. (2021). Late and early work scheduling: A survey. Omega, 104, 102453.
Sterna, Czerniachowska (bib0031) 2017; 174
Chen, Kovalev, Liu, Sterna, Chalamon, Błażewicz (bib0012) 2021; 290
Lin, Lin, Lee (bib0024) 2006; 38
Błażewicz, Pesch, Sterna, Werner (bib0006) 2004; 134
Błażewicz, Pesch, Sterna, Werner (bib0008) 2005; 3698
Potts, Van Wassenhove (bib0026) 1992; 11
Potts, Van Wassenhove (bib0027) 1992; 40
Błażewicz, Ecker, Pesch, Sterna, Schmidt, Weglarz (bib0003) 2019
Wang, Ji, Cheng, Wang (bib0033) 2012; 6
Shabtay, Gaspar, Kaspi (bib0028) 2013; 16
Chen, Wang, Pesch, Sterna, Błażewicz (bib0017) 2019; 51
Chen, Kovalev, Sterna, Błażewicz (bib0013) 2020
Chen, Wang, Xie, Zhang, Sterna, Błażewicz (bib0016) 2020; 144
Błażewicz, Pesch, Sterna, Werner (bib0007) 2005; 49
Błażewicz, Chen, Lee, Lin, Lin, Pesch (bib0002) 2019; 51
Yin, Xu, Cheng, Wu, Wang (bib0035) 2016; 63
Johnson (bib0021) 1954; 1
Pesch, Sterna (bib0025) 2009; 57
Gerstl, Mor, Mosheiov (bib0018) 2019; 57
Chen, Liang, Sterna, Wang, Błażewicz (bib0014) 2020; 284
Leung (bib0023) 2004
Błażewicz, Pesch, Sterna, Werner (bib0005) 2004; 3285
Błażewicz, Pesch, Sterna, Werner (bib0004) 2000
Błażewicz, Pesch, Sterna, Werner (bib0010) 2008; 35
Sterna (bib0029) 2011; 39
Graham, Lawler, Lenstra, Kan (bib0019) 1979; 5
Xiong, Zhou, Yin, Cheng, Li (bib0034) 2019; 66
Błażewicz, Pesch, Sterna, Werner (bib0009) 2005; 165
Błażewicz (10.1016/j.ejor.2021.07.055_bib0004) 2000
10.1016/j.ejor.2021.07.055_bib0030
Pesch (10.1016/j.ejor.2021.07.055_bib0025) 2009; 57
Błażewicz (10.1016/j.ejor.2021.07.055_bib0002) 2019; 51
Kovalyov (10.1016/j.ejor.2021.07.055_bib0022) 1994; 19
Yin (10.1016/j.ejor.2021.07.055_bib0036) 2018; 65
Yin (10.1016/j.ejor.2021.07.055_bib0035) 2016; 63
Chen (10.1016/j.ejor.2021.07.055_bib0012) 2021; 290
Chen (10.1016/j.ejor.2021.07.055_bib0011) 2017; 111
Błażewicz (10.1016/j.ejor.2021.07.055_bib0007) 2005; 49
Chen (10.1016/j.ejor.2021.07.055_bib0017) 2019; 51
Leung (10.1016/j.ejor.2021.07.055_bib0023) 2004
Sterna (10.1016/j.ejor.2021.07.055_bib0031) 2017; 174
Chen (10.1016/j.ejor.2021.07.055_bib0016) 2020; 144
Wang (10.1016/j.ejor.2021.07.055_bib0033) 2012; 6
Sterna (10.1016/j.ejor.2021.07.055_bib0029) 2011; 39
Błażewicz (10.1016/j.ejor.2021.07.055_bib0001) 1984; 3
Györgyi (10.1016/j.ejor.2021.07.055_bib0020) 2020; 286
Lin (10.1016/j.ejor.2021.07.055_bib0024) 2006; 38
Błażewicz (10.1016/j.ejor.2021.07.055_bib0006) 2004; 134
Błażewicz (10.1016/j.ejor.2021.07.055_bib0008) 2005; 3698
Graham (10.1016/j.ejor.2021.07.055_bib0019) 1979; 5
Błażewicz (10.1016/j.ejor.2021.07.055_bib0005) 2004; 3285
Xiong (10.1016/j.ejor.2021.07.055_bib0034) 2019; 66
Wang (10.1016/j.ejor.2021.07.055_bib0032) 2020; 67
Błażewicz (10.1016/j.ejor.2021.07.055_bib0009) 2005; 165
Potts (10.1016/j.ejor.2021.07.055_bib0026) 1992; 11
Potts (10.1016/j.ejor.2021.07.055_bib0027) 1992; 40
Błażewicz (10.1016/j.ejor.2021.07.055_bib0003) 2019
Gerstl (10.1016/j.ejor.2021.07.055_bib0018) 2019; 57
Chen (10.1016/j.ejor.2021.07.055_bib0015) 2016; 19
Johnson (10.1016/j.ejor.2021.07.055_bib0021) 1954; 1
Shabtay (10.1016/j.ejor.2021.07.055_bib0028) 2013; 16
Chen (10.1016/j.ejor.2021.07.055_bib0013) 2020
Chen (10.1016/j.ejor.2021.07.055_bib0014) 2020; 284
Błażewicz (10.1016/j.ejor.2021.07.055_bib0010) 2008; 35
References_xml – volume: 57
  start-page: 531
  year: 2019
  end-page: 543
  ident: bib0018
  article-title: Scheduling on a proportionate flowshop to minimise total late work
  publication-title: International Journal of Production Research
– volume: 57
  start-page: 1202
  year: 2009
  end-page: 1209
  ident: bib0025
  article-title: Late work minimization in flow shops by a genetic algorithm
  publication-title: Computers & Industrial Engineering
– volume: 3
  start-page: 415
  year: 1984
  end-page: 420
  ident: bib0001
  article-title: Scheduling preemptible tasks on parallel processors with information loss
  publication-title: Technique et Science Informatiques
– volume: 39
  start-page: 120
  year: 2011
  end-page: 129
  ident: bib0029
  article-title: A survey of scheduling problems with late work criteria
  publication-title: Omega
– volume: 5
  start-page: 287
  year: 1979
  end-page: 326
  ident: bib0019
  article-title: Optimization and approximation in deterministic sequencing and scheduling: A survey
  publication-title: Annals of Discrete Mathematics
– volume: 19
  start-page: 729
  year: 2016
  end-page: 736
  ident: bib0015
  article-title: Scheduling on parallel identical machines with late work criterion: Offline and online cases
  publication-title: Journal of Scheduling
– volume: 174
  start-page: 927
  year: 2017
  end-page: 944
  ident: bib0031
  article-title: Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work
  publication-title: Journal of Optimization Theory and Applications
– year: 2019
  ident: bib0003
  article-title: Handbook on scheduling. From theory to practice
– volume: 63
  start-page: 172
  year: 2016
  end-page: 183
  ident: bib0035
  article-title: Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work
  publication-title: Naval Research Logistics
– volume: 111
  start-page: 176
  year: 2017
  end-page: 182
  ident: bib0011
  article-title: Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect
  publication-title: Computers & Industrial Engineering
– volume: 3698
  start-page: 222
  year: 2005
  end-page: 234
  ident: bib0008
  article-title: Metaheuristics for late work minimization in two-machine flow shop with common due date
  publication-title: Lecture Notes in Artificial Intelligence
– start-page: 354
  year: 2000
  end-page: 359
  ident: bib0004
  article-title: Total late work criteria for shop scheduling problems
  publication-title: Operations research proceedings
– volume: 49
  start-page: 611
  year: 2005
  end-page: 624
  ident: bib0007
  article-title: A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
  publication-title: Computers & Industrial Engineering
– volume: 144
  start-page: 106449
  year: 2020
  ident: bib0016
  article-title: Exact and heuristic algorithms for scheduling on two identical machines with early work maximization
  publication-title: Computers & Industrial Engineering
– year: 2020
  ident: bib0013
  article-title: Mirror scheduling problems with early work and late work criteria
  publication-title: Journal of Scheduling
– volume: 290
  start-page: 71
  year: 2021
  end-page: 78
  ident: bib0012
  article-title: Semi-online scheduling on two identical machines with a common due date to maximize total early work
  publication-title: Discrete Applied Mathematics
– volume: 165
  start-page: 408
  year: 2005
  end-page: 415
  ident: bib0009
  article-title: The two-machine flow-shop problem with weighted late work criterion and common due date
  publication-title: European Journal of Operational Research
– volume: 51
  start-page: 1279
  year: 2019
  end-page: 1280
  ident: bib0002
  article-title: Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
  publication-title: Engineering Optimization
– volume: 66
  start-page: 502
  year: 2019
  end-page: 516
  ident: bib0034
  article-title: An exact branch-and-price algorithm for multitasking scheduling on unrelated parallel machines
  publication-title: Naval Research Logistics
– volume: 286
  start-page: 129
  year: 2020
  end-page: 137
  ident: bib0020
  article-title: A common approximation framework for early work, late work, and resource leveling problems
  publication-title: European Journal of Operational Research
– volume: 67
  start-page: 573
  year: 2020
  end-page: 591
  ident: bib0032
  article-title: Two-agent scheduling with linear resource-dependent processing times
  publication-title: Naval Research Logistics
– volume: 3285
  start-page: 68
  year: 2004
  end-page: 75
  ident: bib0005
  article-title: Flow shop scheduling with late work criterion choosing the best solution strategy
  publication-title: Lecture Notes in Computer Science
– volume: 51
  start-page: 1268
  year: 2019
  end-page: 1278
  ident: bib0017
  article-title: Two-machine flow-shop scheduling to minimize total late work: Revisited
  publication-title: Engineering Optimization
– reference: Sterna, M. (2021). Late and early work scheduling: A survey. Omega, 104, 102453.
– volume: 65
  start-page: 393
  year: 2018
  end-page: 409
  ident: bib0036
  article-title: Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
  publication-title: Naval Research Logistics
– year: 2004
  ident: bib0023
  article-title: Minimizing total weighted error for imprecise computation tasks and related problems
  publication-title: Handbook of scheduling: Algorithms, models, and performance analysis
– volume: 40
  start-page: 586
  year: 1992
  end-page: 595
  ident: bib0027
  article-title: Single machine scheduling to minimize total late work
  publication-title: Operations Research
– volume: 284
  start-page: 67
  year: 2020
  end-page: 74
  ident: bib0014
  article-title: Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
  publication-title: European Journal of Operational Research
– volume: 19
  start-page: 86
  year: 1994
  end-page: 93
  ident: bib0022
  article-title: A fully polynomial approximation scheme for scheduling a single machine to minimize total weighted late work
  publication-title: Mathematics of Operations Research
– volume: 11
  start-page: 261
  year: 1992
  end-page: 266
  ident: bib0026
  article-title: Approximation algorithms for scheduling a single machine to minimize total late work
  publication-title: Operations Research Letters
– volume: 6
  start-page: 1393
  year: 2012
  end-page: 1409
  ident: bib0033
  article-title: Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
  publication-title: Optimization Letters
– volume: 35
  start-page: 574
  year: 2008
  end-page: 599
  ident: bib0010
  article-title: Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
  publication-title: Computers & Operations Research
– volume: 38
  start-page: 501
  year: 2006
  end-page: 509
  ident: bib0024
  article-title: Two-machine flow-shop scheduling to minimize total late work
  publication-title: Engineering Optimization
– volume: 16
  start-page: 3
  year: 2013
  end-page: 28
  ident: bib0028
  article-title: A survey on offline scheduling with rejection
  publication-title: Journal of Scheduling
– volume: 134
  start-page: 1
  year: 2004
  end-page: 24
  ident: bib0006
  article-title: Open shop scheduling problems with late work criteria
  publication-title: Discrete Applied Mathematics
– volume: 1
  start-page: 61
  year: 1954
  end-page: 68
  ident: bib0021
  article-title: Optimal two and three stage production schedules with setup times included
  publication-title: Naval Research Logistics Quarterly
– start-page: 354
  year: 2000
  ident: 10.1016/j.ejor.2021.07.055_bib0004
  article-title: Total late work criteria for shop scheduling problems
– volume: 39
  start-page: 120
  issue: 2
  year: 2011
  ident: 10.1016/j.ejor.2021.07.055_bib0029
  article-title: A survey of scheduling problems with late work criteria
  publication-title: Omega
  doi: 10.1016/j.omega.2010.06.006
– volume: 19
  start-page: 729
  issue: 6
  year: 2016
  ident: 10.1016/j.ejor.2021.07.055_bib0015
  article-title: Scheduling on parallel identical machines with late work criterion: Offline and online cases
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-015-0464-7
– volume: 290
  start-page: 71
  year: 2021
  ident: 10.1016/j.ejor.2021.07.055_bib0012
  article-title: Semi-online scheduling on two identical machines with a common due date to maximize total early work
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/j.dam.2020.05.023
– volume: 57
  start-page: 531
  issue: 2
  year: 2019
  ident: 10.1016/j.ejor.2021.07.055_bib0018
  article-title: Scheduling on a proportionate flowshop to minimise total late work
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2018.1456693
– volume: 3
  start-page: 415
  issue: 6
  year: 1984
  ident: 10.1016/j.ejor.2021.07.055_bib0001
  article-title: Scheduling preemptible tasks on parallel processors with information loss
  publication-title: Technique et Science Informatiques
– volume: 51
  start-page: 1268
  issue: 7
  year: 2019
  ident: 10.1016/j.ejor.2021.07.055_bib0017
  article-title: Two-machine flow-shop scheduling to minimize total late work: Revisited
  publication-title: Engineering Optimization
  doi: 10.1080/0305215X.2018.1519073
– volume: 57
  start-page: 1202
  issue: 4
  year: 2009
  ident: 10.1016/j.ejor.2021.07.055_bib0025
  article-title: Late work minimization in flow shops by a genetic algorithm
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2009.05.011
– volume: 49
  start-page: 611
  issue: 4
  year: 2005
  ident: 10.1016/j.ejor.2021.07.055_bib0007
  article-title: A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2005.09.001
– volume: 38
  start-page: 501
  issue: 04
  year: 2006
  ident: 10.1016/j.ejor.2021.07.055_bib0024
  article-title: Two-machine flow-shop scheduling to minimize total late work
  publication-title: Engineering Optimization
  doi: 10.1080/03052150500420439
– volume: 65
  start-page: 393
  year: 2018
  ident: 10.1016/j.ejor.2021.07.055_bib0036
  article-title: Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
  publication-title: Naval Research Logistics
  doi: 10.1002/nav.21813
– volume: 144
  start-page: 106449
  year: 2020
  ident: 10.1016/j.ejor.2021.07.055_bib0016
  article-title: Exact and heuristic algorithms for scheduling on two identical machines with early work maximization
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2020.106449
– volume: 134
  start-page: 1
  issue: 1
  year: 2004
  ident: 10.1016/j.ejor.2021.07.055_bib0006
  article-title: Open shop scheduling problems with late work criteria
  publication-title: Discrete Applied Mathematics
  doi: 10.1016/S0166-218X(03)00339-1
– volume: 51
  start-page: 1279
  issue: 7
  year: 2019
  ident: 10.1016/j.ejor.2021.07.055_bib0002
  article-title: Clarification of lower bounds of two-machine flow-shop scheduling to minimize total late work
  publication-title: Engineering Optimization
  doi: 10.1080/0305215X.2018.1554066
– year: 2019
  ident: 10.1016/j.ejor.2021.07.055_bib0003
– volume: 6
  start-page: 1393
  issue: 7
  year: 2012
  ident: 10.1016/j.ejor.2021.07.055_bib0033
  article-title: Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
  publication-title: Optimization Letters
  doi: 10.1007/s11590-011-0334-y
– volume: 3285
  start-page: 68
  year: 2004
  ident: 10.1016/j.ejor.2021.07.055_bib0005
  article-title: Flow shop scheduling with late work criterion choosing the best solution strategy
  publication-title: Lecture Notes in Computer Science
  doi: 10.1007/978-3-540-30176-9_9
– year: 2020
  ident: 10.1016/j.ejor.2021.07.055_bib0013
  article-title: Mirror scheduling problems with early work and late work criteria
  publication-title: Journal of Scheduling
– volume: 5
  start-page: 287
  year: 1979
  ident: 10.1016/j.ejor.2021.07.055_bib0019
  article-title: Optimization and approximation in deterministic sequencing and scheduling: A survey
  publication-title: Annals of Discrete Mathematics
  doi: 10.1016/S0167-5060(08)70356-X
– volume: 286
  start-page: 129
  issue: 1
  year: 2020
  ident: 10.1016/j.ejor.2021.07.055_bib0020
  article-title: A common approximation framework for early work, late work, and resource leveling problems
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2020.03.032
– volume: 284
  start-page: 67
  issue: 1
  year: 2020
  ident: 10.1016/j.ejor.2021.07.055_bib0014
  article-title: Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2019.12.003
– volume: 11
  start-page: 261
  issue: 5
  year: 1992
  ident: 10.1016/j.ejor.2021.07.055_bib0026
  article-title: Approximation algorithms for scheduling a single machine to minimize total late work
  publication-title: Operations Research Letters
  doi: 10.1016/0167-6377(92)90001-J
– volume: 40
  start-page: 586
  issue: 3
  year: 1992
  ident: 10.1016/j.ejor.2021.07.055_bib0027
  article-title: Single machine scheduling to minimize total late work
  publication-title: Operations Research
  doi: 10.1287/opre.40.3.586
– volume: 66
  start-page: 502
  year: 2019
  ident: 10.1016/j.ejor.2021.07.055_bib0034
  article-title: An exact branch-and-price algorithm for multitasking scheduling on unrelated parallel machines
  publication-title: Naval Research Logistics
  doi: 10.1002/nav.21863
– volume: 1
  start-page: 61
  issue: 1
  year: 1954
  ident: 10.1016/j.ejor.2021.07.055_bib0021
  article-title: Optimal two and three stage production schedules with setup times included
  publication-title: Naval Research Logistics Quarterly
  doi: 10.1002/nav.3800010110
– volume: 16
  start-page: 3
  issue: 1
  year: 2013
  ident: 10.1016/j.ejor.2021.07.055_bib0028
  article-title: A survey on offline scheduling with rejection
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-012-0303-z
– volume: 35
  start-page: 574
  issue: 2
  year: 2008
  ident: 10.1016/j.ejor.2021.07.055_bib0010
  article-title: Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2006.03.021
– ident: 10.1016/j.ejor.2021.07.055_bib0030
  doi: 10.1016/j.omega.2021.102453
– volume: 165
  start-page: 408
  issue: 2
  year: 2005
  ident: 10.1016/j.ejor.2021.07.055_bib0009
  article-title: The two-machine flow-shop problem with weighted late work criterion and common due date
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2004.04.011
– year: 2004
  ident: 10.1016/j.ejor.2021.07.055_bib0023
  article-title: Minimizing total weighted error for imprecise computation tasks and related problems
– volume: 67
  start-page: 573
  year: 2020
  ident: 10.1016/j.ejor.2021.07.055_bib0032
  article-title: Two-agent scheduling with linear resource-dependent processing times
  publication-title: Naval Research Logistics
  doi: 10.1002/nav.21936
– volume: 3698
  start-page: 222
  year: 2005
  ident: 10.1016/j.ejor.2021.07.055_bib0008
  article-title: Metaheuristics for late work minimization in two-machine flow shop with common due date
  publication-title: Lecture Notes in Artificial Intelligence
– volume: 19
  start-page: 86
  issue: 1
  year: 1994
  ident: 10.1016/j.ejor.2021.07.055_bib0022
  article-title: A fully polynomial approximation scheme for scheduling a single machine to minimize total weighted late work
  publication-title: Mathematics of Operations Research
  doi: 10.1287/moor.19.1.86
– volume: 174
  start-page: 927
  issue: 3
  year: 2017
  ident: 10.1016/j.ejor.2021.07.055_bib0031
  article-title: Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work
  publication-title: Journal of Optimization Theory and Applications
  doi: 10.1007/s10957-017-1147-7
– volume: 111
  start-page: 176
  year: 2017
  ident: 10.1016/j.ejor.2021.07.055_bib0011
  article-title: Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2017.07.016
– volume: 63
  start-page: 172
  issue: 2
  year: 2016
  ident: 10.1016/j.ejor.2021.07.055_bib0035
  article-title: Approximation schemes for single-machine scheduling with a fixed maintenance activity to minimize the total amount of late work
  publication-title: Naval Research Logistics
  doi: 10.1002/nav.21684
SSID ssj0001515
Score 2.447923
Snippet •Two-machine ow shop scheduling to maximize total early work is considered.•A dynamic programming approach running in O(n2d2) time is proposed.•A fully...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 504
SubjectTerms Combinatorial optimization
Dynamic programming
Early and late work
Flow shop scheduling
FPTAS
Title Two-machine flow shop scheduling with a common due date to maximize total early work
URI https://dx.doi.org/10.1016/j.ejor.2021.07.055
Volume 300
WOSCitedRecordID wos000819872700009&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: ScienceDirect Freedom Collection - Elsevier
  customDbUrl:
  eissn: 1872-6860
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0001515
  issn: 0377-2217
  databaseCode: AIEXJ
  dateStart: 19950105
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3db9MwELfKhhA88FFAjC_5gbcoVePEcfw4TUOAYAKpSH2LHMeBVGlSZdlW7U_hr-Uc22k02MQeeIkiq3aT3q935_P97hB6x1hOCBfcV6D5_IgWmS-oCPyikAVheUKCOOubTbCTk2S55F8nk1-OC3NesbpOtlu--a-ihjEQtqbO3kLcw6IwAPcgdLiC2OH6b4K_aPx1nyKpvKJqLrzTn83Gg00sGJVqCL0KnUwOz-TlZ8rTu37thK7FtlyXl_pecyRVX_xYZ25dG7-3viwMtC6qaMsHDWHmI8v_WJYDDr-Uoo_Qfhth87NtHK_aru2TP2aL2RD-6aOWhlpU_WjaS0OoG8IVpE9tNWxKR9NizCfEEDadCg7n8xHWyEihUtOc2NpmahTzH2rfRCBWM7VqdI1XEpiCrHRn5NzB_hXbN2QkumS3VarXSPUa6ZylsMYdtE8Y5aAx9w8_Hi8_DXZeu4L9GZV9IUvJMtmDV5_k727PyJVZPEYP7R4EHxrsPEETVU_RPUeBmKJHrtUHtpp_ih6M6lY-RYsRxrDGGNYYwzuMYY0xLLDBGAaMYS0q3DXYYQz3GMM9xrDG2DP0_f3x4uiDb9tz-DKMaecLcA2lioUsskhRESe5jGkG_idRKlIyToQ-xM4lS5IinMOgZDFnKi_yUMQwJ3yO9uqmVi8QhulBmMRcRkJEUR7xDBRLxBSPFeciIwcocL9eKm3tet1CpUqvl9sB8oY5G1O55cZPUyeU1PqexqdMAWM3zHt5q295he7v_hOv0V7Xnqk36K4878rT9q0F2G9h7KjO
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Two-machine+flow+shop+scheduling+with+a+common+due+date+to+maximize+total+early+work&rft.jtitle=European+journal+of+operational+research&rft.au=Chen%2C+Xin&rft.au=Miao%2C+Qian&rft.au=Lin%2C+Bertrand+M.T.&rft.au=Sterna%2C+Malgorzata&rft.date=2022-07-16&rft.issn=0377-2217&rft.volume=300&rft.issue=2&rft.spage=504&rft.epage=511&rft_id=info:doi/10.1016%2Fj.ejor.2021.07.055&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_ejor_2021_07_055
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0377-2217&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0377-2217&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0377-2217&client=summon