Chen, X., Miao, Q., Lin, B. M., Sterna, M., & Blazewicz, J. (2022). Two-machine flow shop scheduling with a common due date to maximize total early work. European journal of operational research, 300(2), 504-511. https://doi.org/10.1016/j.ejor.2021.07.055
Chicago Style (17th ed.) CitationChen, Xin, Qian Miao, Bertrand M.T Lin, Malgorzata Sterna, and Jacek Blazewicz. "Two-machine Flow Shop Scheduling with a Common Due Date to Maximize Total Early Work." European Journal of Operational Research 300, no. 2 (2022): 504-511. https://doi.org/10.1016/j.ejor.2021.07.055.
MLA (9th ed.) CitationChen, Xin, et al. "Two-machine Flow Shop Scheduling with a Common Due Date to Maximize Total Early Work." European Journal of Operational Research, vol. 300, no. 2, 2022, pp. 504-511, https://doi.org/10.1016/j.ejor.2021.07.055.