Citace podle APA (7th ed.)

Geng, Z., & Yuan, J. (2023). Single-machine scheduling of multiple projects with controllable processing times. European journal of operational research, 308(3), 1074-1090. https://doi.org/10.1016/j.ejor.2023.01.026

Citace podle Chicago (17th ed.)

Geng, Zhichao, a Jinjiang Yuan. "Single-machine Scheduling of Multiple Projects with Controllable Processing Times." European Journal of Operational Research 308, no. 3 (2023): 1074-1090. https://doi.org/10.1016/j.ejor.2023.01.026.

Citace podle MLA (9th ed.)

Geng, Zhichao, a Jinjiang Yuan. "Single-machine Scheduling of Multiple Projects with Controllable Processing Times." European Journal of Operational Research, vol. 308, no. 3, 2023, pp. 1074-1090, https://doi.org/10.1016/j.ejor.2023.01.026.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..