Gong, J., Li, Y., & Suo, C. (2019). Full-infinite interval two-stage credibility constrained programming for electric power system management by considering carbon emission trading. International journal of electrical power & energy systems, 105, 440-453. https://doi.org/10.1016/j.ijepes.2018.08.028
Citace podle Chicago (17th ed.)Gong, J.W, Y.P Li, a C. Suo. "Full-infinite Interval Two-stage Credibility Constrained Programming for Electric Power System Management by Considering Carbon Emission Trading." International Journal of Electrical Power & Energy Systems 105 (2019): 440-453. https://doi.org/10.1016/j.ijepes.2018.08.028.
Citace podle MLA (9th ed.)Gong, J.W, et al. "Full-infinite Interval Two-stage Credibility Constrained Programming for Electric Power System Management by Considering Carbon Emission Trading." International Journal of Electrical Power & Energy Systems, vol. 105, 2019, pp. 440-453, https://doi.org/10.1016/j.ijepes.2018.08.028.