Optimization of the pick-and-place sequence of a bimanual collaborative robot in an industrial production line

This paper focuses on optimising pick-and-place tasks performed by a dual-arm collaborative robot in a specific shoe manufacturing industry environment. The robot must identify the pieces of a shoe placed on a tray, pick them up, and place them in a shoe mold for further processing. The shoe pieces...

Full description

Saved in:
Bibliographic Details
Published in:International journal of advanced manufacturing technology Vol. 130; no. 9-10; pp. 4221 - 4234
Main Authors: Borrell, Jorge, Perez-Vidal, Carlos, Segura, Jose Vicente
Format: Journal Article
Language:English
Published: London Springer London 01.02.2024
Springer Nature B.V
Subjects:
ISSN:0268-3768, 1433-3015
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first