A New Peak-Shaving Model Based on Mixed Integer Linear Programming with Variable Peak-Shaving Order

Peak-shaving is a very efficient and practical strategy for a day-ahead hydropower scheduling in power systems, usually aiming to appropriately schedule hourly (or in less time interval) power generations of individual plants so as to smooth the load curve while enforcing the energy production targe...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Energies (Basel) Ročník 14; číslo 4; s. 887
Hlavní autori: Cheng, Xianliang, Feng, Suzhen, Huang, Yanxuan, Wang, Jinwen
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Basel MDPI AG 01.02.2021
Predmet:
ISSN:1996-1073, 1996-1073
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract Peak-shaving is a very efficient and practical strategy for a day-ahead hydropower scheduling in power systems, usually aiming to appropriately schedule hourly (or in less time interval) power generations of individual plants so as to smooth the load curve while enforcing the energy production target of each plant. Nowadays, the power marketization and booming development of renewable energy resources are complicating the constraints and diversifying the objectives, bringing challenges for the peak-shaving method to be more flexible and efficient. Without a pre-set or fixed peak-shaving order of plants, this paper formulates a new peak-shaving model based on the mixed integer linear programming (MILP) to solve the scheduling problem in an optimization way. Compared with the traditional peak-shaving methods that need to determine the order of plants to peak-shave the load curve one by one, the present model has better flexibility as it can handle the plant-based operating zones and prioritize the constraints and objectives more easily. With application to six cascaded hydropower reservoirs on the Lancang River in China, the model is tested efficient and practical in engineering perspective.
AbstractList Peak-shaving is a very efficient and practical strategy for a day-ahead hydropower scheduling in power systems, usually aiming to appropriately schedule hourly (or in less time interval) power generations of individual plants so as to smooth the load curve while enforcing the energy production target of each plant. Nowadays, the power marketization and booming development of renewable energy resources are complicating the constraints and diversifying the objectives, bringing challenges for the peak-shaving method to be more flexible and efficient. Without a pre-set or fixed peak-shaving order of plants, this paper formulates a new peak-shaving model based on the mixed integer linear programming (MILP) to solve the scheduling problem in an optimization way. Compared with the traditional peak-shaving methods that need to determine the order of plants to peak-shave the load curve one by one, the present model has better flexibility as it can handle the plant-based operating zones and prioritize the constraints and objectives more easily. With application to six cascaded hydropower reservoirs on the Lancang River in China, the model is tested efficient and practical in engineering perspective.
Author Cheng, Xianliang
Feng, Suzhen
Wang, Jinwen
Huang, Yanxuan
Author_xml – sequence: 1
  givenname: Xianliang
  surname: Cheng
  fullname: Cheng, Xianliang
– sequence: 2
  givenname: Suzhen
  surname: Feng
  fullname: Feng, Suzhen
– sequence: 3
  givenname: Yanxuan
  surname: Huang
  fullname: Huang, Yanxuan
– sequence: 4
  givenname: Jinwen
  surname: Wang
  fullname: Wang, Jinwen
BookMark eNptUV1P3DAQtBBIHB8v_QWW-lYp1M46if14IAonHeUkoK_WJt7c-ZqzqRMK_fcNvVYFxL7saDUzO9IcsN0QAzH2QYoTACM-U5BKKKF1tcMm0pgyk6KC3Rd4nx33_VqMAyABYMKaKf9Kj3xB-D27WeFPH5b8Kjrq-Cn25HgM_Mo_jWAWBlpS4nMfCBNfpLhMuNk88x_9sOLfMHmsO3ptdZ0cpSO212LX0_Hffcjuvpzfnl1m8-uL2dl0njVQyiEzhRJYmMbVTuZYG9c0WpSIRUFtXlEJ2AK1UleAoE0pHeWuQEdlXpctOYRDNtv6uohre5_8BtMvG9HbP4eYlhbT4JuOLNaqrvKykE5JBc4YTXVdQKtofA6oR6-PW6_7FH88UD_YdXxIYYxvc6W1BiFUPrLEltWk2PeJWtv4AQcfw5DQd1YK-9yM_d_MKPn0RvIv6Dvk3679j6Q
CitedBy_id crossref_primary_10_1016_j_jclepro_2022_135704
crossref_primary_10_3390_electronics11213610
crossref_primary_10_1016_j_renene_2021_10_079
crossref_primary_10_1016_j_energy_2022_123908
crossref_primary_10_1002_ente_202101055
crossref_primary_10_1016_j_est_2024_111657
crossref_primary_10_3390_sym16080949
crossref_primary_10_1016_j_apenergy_2022_118620
crossref_primary_10_3390_en15239074
crossref_primary_10_1186_s42162_024_00305_7
Cites_doi 10.1016/j.envsci.2013.09.008
10.1016/j.apenergy.2018.08.034
10.1061/(ASCE)WR.1943-5452.0000437
10.1016/j.ijepes.2014.12.004
10.1016/j.rser.2019.109617
10.1016/j.energy.2018.11.068
10.3390/w11061185
10.1016/j.enconman.2007.07.001
10.1016/j.energy.2020.117677
10.1016/j.energy.2019.03.117
10.1061/(ASCE)WR.1943-5452.0000142
10.1109/TPWRS.2013.2274286
10.1016/j.energy.2017.06.097
10.1061/(ASCE)WR.1943-5452.0000622
10.1109/59.32597
ContentType Journal Article
Copyright 2021. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Copyright_xml – notice: 2021. This work is licensed under http://creativecommons.org/licenses/by/3.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
DBID AAYXX
CITATION
ABUWG
AFKRA
AZQEC
BENPR
CCPQU
DWQXO
PHGZM
PHGZT
PIMPY
PKEHL
PQEST
PQQKQ
PQUKI
PRINS
DOA
DOI 10.3390/en14040887
DatabaseName CrossRef
ProQuest Central (Alumni)
ProQuest Central UK/Ireland
ProQuest Central Essentials
ProQuest Central
ProQuest One
ProQuest Central
ProQuest Central Premium
ProQuest One Academic (New)
Publicly Available Content Database
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Academic (retired)
ProQuest One Academic UKI Edition
ProQuest Central China
Directory of Open Access Journals
DatabaseTitle CrossRef
Publicly Available Content Database
ProQuest One Academic Middle East (New)
ProQuest Central Essentials
ProQuest One Academic Eastern Edition
ProQuest Central (Alumni Edition)
ProQuest One Community College
ProQuest Central China
ProQuest Central
ProQuest One Academic UKI Edition
ProQuest Central Korea
ProQuest Central (New)
ProQuest One Academic
ProQuest One Academic (New)
DatabaseTitleList Publicly Available Content Database
CrossRef

Database_xml – sequence: 1
  dbid: DOA
  name: DOAJ Directory of Open Access Journals
  url: https://www.doaj.org/
  sourceTypes: Open Website
– sequence: 2
  dbid: PIMPY
  name: Publicly Available Content Database
  url: http://search.proquest.com/publiccontent
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1996-1073
ExternalDocumentID oai_doaj_org_article_ab4b72651d4143d998ebb53f4ebd13a8
10_3390_en14040887
GroupedDBID 29G
2WC
2XV
5GY
5VS
7XC
8FE
8FG
8FH
AADQD
AAHBH
AAYXX
ABDBF
ACUHS
ADBBV
ADMLS
AENEX
AFFHD
AFKRA
AFZYC
ALMA_UNASSIGNED_HOLDINGS
BCNDV
BENPR
CCPQU
CITATION
CS3
DU5
EBS
ESX
FRP
GROUPED_DOAJ
GX1
I-F
IAO
ITC
KQ8
L6V
L8X
MODMG
M~E
OK1
OVT
P2P
PHGZM
PHGZT
PIMPY
PROAC
TR2
TUS
ABUWG
AZQEC
DWQXO
PKEHL
PQEST
PQQKQ
PQUKI
PRINS
ID FETCH-LOGICAL-c361t-9540a59cdbd12ab9dcc806aa55ef27e63af3ef1873a38961de2d5ade62b6feda3
IEDL.DBID BENPR
ISICitedReferencesCount 9
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000623477600001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1996-1073
IngestDate Mon Nov 10 04:33:38 EST 2025
Mon Jun 30 11:16:03 EDT 2025
Sat Nov 29 07:10:54 EST 2025
Tue Nov 18 20:58:03 EST 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 4
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c361t-9540a59cdbd12ab9dcc806aa55ef27e63af3ef1873a38961de2d5ade62b6feda3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
OpenAccessLink https://www.proquest.com/docview/2488830042?pq-origsite=%requestingapplication%
PQID 2488830042
PQPubID 2032402
ParticipantIDs doaj_primary_oai_doaj_org_article_ab4b72651d4143d998ebb53f4ebd13a8
proquest_journals_2488830042
crossref_citationtrail_10_3390_en14040887
crossref_primary_10_3390_en14040887
PublicationCentury 2000
PublicationDate 2021-02-01
PublicationDateYYYYMMDD 2021-02-01
PublicationDate_xml – month: 02
  year: 2021
  text: 2021-02-01
  day: 01
PublicationDecade 2020
PublicationPlace Basel
PublicationPlace_xml – name: Basel
PublicationTitle Energies (Basel)
PublicationYear 2021
Publisher MDPI AG
Publisher_xml – name: MDPI AG
References Feng (ref_1) 2017; 135
Shen (ref_7) 2020; 120
Liu (ref_18) 2020; 201
Wu (ref_13) 2015; 68
Graabak (ref_9) 2019; 168
Gaudard (ref_8) 2014; 37
Simopoulos (ref_10) 2007; 48
ref_17
Wang (ref_14) 2015; 141
ref_15
Feng (ref_5) 2019; 175
Xie (ref_6) 2016; 142
Wu (ref_11) 1989; 4
Wang (ref_3) 2018; 229
ref_4
Wang (ref_12) 2012; 138
Tong (ref_16) 2013; 28
Wu (ref_2) 2020; 6
References_xml – volume: 37
  start-page: 172
  year: 2014
  ident: ref_8
  article-title: The future of hydropower in Europe: Interconnecting climate, markets and policies
  publication-title: Environ. Sci. Policy
  doi: 10.1016/j.envsci.2013.09.008
– volume: 6
  start-page: 554
  year: 2020
  ident: ref_2
  article-title: Discussion on key factors for efficient consumption of renewable energy in provincial power grid at southern China
  publication-title: CSEE J. Power Energy Syst.
– volume: 229
  start-page: 945
  year: 2018
  ident: ref_3
  article-title: Short-term hydro-thermal-wind-photovoltaic complementary operation of interconnected power systems
  publication-title: Appl. Energy
  doi: 10.1016/j.apenergy.2018.08.034
– volume: 141
  start-page: 13
  year: 2015
  ident: ref_14
  article-title: Quarter-hourly operation of large-scale hydropower reservoir systems with prioritized constraints
  publication-title: J. Water Resour. Plan. Manag.
  doi: 10.1061/(ASCE)WR.1943-5452.0000437
– ident: ref_4
– volume: 68
  start-page: 278
  year: 2015
  ident: ref_13
  article-title: A multi-objective short term hydropower scheduling model for peak shaving
  publication-title: Int. J. Electr. Power Energy Syst.
  doi: 10.1016/j.ijepes.2014.12.004
– volume: 120
  start-page: 17
  year: 2020
  ident: ref_7
  article-title: Multiobjective optimal operations for an interprovincial hydropower system considering peak-shaving demands
  publication-title: Renew. Sustain. Energy Rev.
  doi: 10.1016/j.rser.2019.109617
– volume: 168
  start-page: 870
  year: 2019
  ident: ref_9
  article-title: Balancing future variable wind and solar power production in Central-West Europe with Norwegian hydropower
  publication-title: Energy
  doi: 10.1016/j.energy.2018.11.068
– ident: ref_17
  doi: 10.3390/w11061185
– volume: 48
  start-page: 3018
  year: 2007
  ident: ref_10
  article-title: An enhanced peak shaving method for short term hydrothermal scheduling
  publication-title: Energy Convers. Manag.
  doi: 10.1016/j.enconman.2007.07.001
– ident: ref_15
– volume: 201
  start-page: 117677
  year: 2020
  ident: ref_18
  article-title: Modeling the daily generation schedules in under-developed electricity markets with high-share renewables: A case study of Yunnan in China
  publication-title: Energy
  doi: 10.1016/j.energy.2020.117677
– volume: 175
  start-page: 618
  year: 2019
  ident: ref_5
  article-title: A mixed integer linear programming model for unit commitment of thermal plants with peak shaving operation aspect in regional power grid lack of flexible hydropower energy
  publication-title: Energy
  doi: 10.1016/j.energy.2019.03.117
– volume: 138
  start-page: 3
  year: 2012
  ident: ref_12
  article-title: Short-term optimal operation of hydropower reservoirs with unit commitment and navigation
  publication-title: J. Water Resour. Plan. Manag.
  doi: 10.1061/(ASCE)WR.1943-5452.0000142
– volume: 28
  start-page: 3588
  year: 2013
  ident: ref_16
  article-title: An MILP based formulation for short-term hydro generation scheduling with analysis of the linearization effects on solution feasibility
  publication-title: IEEE Trans. Power Syst.
  doi: 10.1109/TPWRS.2013.2274286
– volume: 135
  start-page: 210
  year: 2017
  ident: ref_1
  article-title: Peak shaving operation of hydro-thermal-nuclear plants serving multiple power grids by linear programming
  publication-title: Energy
  doi: 10.1016/j.energy.2017.06.097
– volume: 142
  start-page: 11
  year: 2016
  ident: ref_6
  article-title: Daily generation scheduling of cascade hydro plants considering peak shaving constraints
  publication-title: J. Water Resour. Plan. Manag.
  doi: 10.1061/(ASCE)WR.1943-5452.0000622
– volume: 4
  start-page: 1043
  year: 1989
  ident: ref_11
  article-title: An investigation of the accuracy and the characteristics of the peak-shaving method applied to production cost calculations
  publication-title: IEEE Trans. Power Syst.
  doi: 10.1109/59.32597
SSID ssj0000331333
Score 2.3014026
Snippet Peak-shaving is a very efficient and practical strategy for a day-ahead hydropower scheduling in power systems, usually aiming to appropriately schedule hourly...
SourceID doaj
proquest
crossref
SourceType Open Website
Aggregation Database
Enrichment Source
Index Database
StartPage 887
SubjectTerms Alternative energy sources
Electric power
Electricity distribution
Energy resources
Hydroelectric power
Lancang hydropower cascade
Linear programming
Load
Mathematical programming
mixed integer linear programming (MILP)
Optimization
peak-shaving
Power plants
Scheduling
short-term scheduling
SummonAdditionalLinks – databaseName: Directory of Open Access Journals
  dbid: DOA
  link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LS8NAEF6keNCD-MRqlQW9eAhNstnd5NiKxYu14IPewj5mS1FTaav4851N0lpR8OIthGETZnZn5ltmviHkXCkjQxOmgdWJDpLI4JECZgPmOFfSGBeKatiE7PfT4TAbrIz68jVhFT1wpbi2wjVkLHhkEwztFtEBaM2ZS0DbiKmyzTeU2QqYKn0wYwi-WMVHyhDXt6HwRDJhWTu3EoFKov4ffrgMLr1tslVnhbRT_c0OWYNil2yucAXuEdOh6JAourCn4M631hcj6geZPdMuBiJLJwW9GX_gg7_jG8GUIsrEXUwHVQHWi5f3l670EdGx75f6vtStp-DcJw-9q_vL66CekBAYJqJ5kGG-pXhmLOoiVjqzxqShUIpzcLEEwZRj4KJUMoWJiYgsxJYrCyLWwoFV7IA0ikkBh4SmYJ0C4YQyPJEadJIJx1QiJfBIpGmTXCy0lpuaPtxPsXjOEUZ4DedfGm6Ss6Xsa0Wa8atU1yt_KeGJrssXaP68Nn_-l_mbpLUwXV6fvlkeo1dKPZVYfPQf3zgmG7GvZClrtVukMZ--wQlZN-_z8Wx6Wm68T9Co3vA
  priority: 102
  providerName: Directory of Open Access Journals
Title A New Peak-Shaving Model Based on Mixed Integer Linear Programming with Variable Peak-Shaving Order
URI https://www.proquest.com/docview/2488830042
https://doaj.org/article/ab4b72651d4143d998ebb53f4ebd13a8
Volume 14
WOSCitedRecordID wos000623477600001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVAON
  databaseName: DOAJ Directory of Open Access Journals
  customDbUrl:
  eissn: 1996-1073
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000331333
  issn: 1996-1073
  databaseCode: DOA
  dateStart: 20080101
  isFulltext: true
  titleUrlDefault: https://www.doaj.org/
  providerName: Directory of Open Access Journals
– providerCode: PRVHPJ
  databaseName: ROAD: Directory of Open Access Scholarly Resources
  customDbUrl:
  eissn: 1996-1073
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000331333
  issn: 1996-1073
  databaseCode: M~E
  dateStart: 20080101
  isFulltext: true
  titleUrlDefault: https://road.issn.org
  providerName: ISSN International Centre
– providerCode: PRVPQU
  databaseName: ProQuest Central
  customDbUrl:
  eissn: 1996-1073
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000331333
  issn: 1996-1073
  databaseCode: BENPR
  dateStart: 20080301
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Publicly Available Content Database
  customDbUrl:
  eissn: 1996-1073
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0000331333
  issn: 1996-1073
  databaseCode: PIMPY
  dateStart: 20080301
  isFulltext: true
  titleUrlDefault: http://search.proquest.com/publiccontent
  providerName: ProQuest
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1Lb9QwELZgy4EeeCMKpbIEFw5REzu2kxPqoq3gsEvES-UU-TFeVZRsu7sgTvx2ZhLvtgjEhUsUOaPIzjw8Mxl_w9hza73JfV5lwZUuKwuPKgUyZDIqZY33MddDswkzm1UnJ3WTEm6rVFa5sYm9oQ4LTznyQ4GSVhE8lHh5fpFR1yj6u5paaFxnO4RUJkZsZzyZNe-2WZZcSgzC5IBLKjG-P4SOAGXyvobuyk7UA_b_YY_7Teb49v9O7w67ldxLfjTIw112Dbp7bPcK6OB95o84WjaOtvBL9p7O6HdzTh3RzvgYd7TAFx2fnv7AG0oWzmHJMVxFdeDNUMn1legpe8s_YZhNB69-f9VbwvJ8wD4eTz68ep2lVguZl7pYZzU6blbVPrhQCOvq4H2Va2uVgigMaGmjhFhURlr0cHQRQARlA2jhdIRg5UM26hYdPGK8ghAt6KitV6Vx4MpaR2lLY0AVuqr22IvNZ299wiGndhhnLcYjxKL2kkV77NmW9nxA3_gr1Zi4t6UgxOx-YLGct0kBW4uyaIRWRSjRRQwYZYJzSsYScMnS4rT2N4xtkxqv2kuuPv734yfspqBil76ce5-N1stv8JTd8N_Xp6vlQZLKgz7gx-v05wTHmjfT5vMvsEbxqw
linkProvider ProQuest
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1Lb9NAEB6VFAk48EYUCqwEHDhYtfdl-4BQA61atQ0RFNSb2cdsVBGckoTXn-I3Mms7aRGIWw_cLHu08nq_mdmZHX8D8MQYl6cuLRJvpU1k5kilUPhEBKVM7lxIddtsIh8MiqOjcrgCPxf_wsSyyoVNbAy1n7iYI9_ghLQi0kPxFyefk9g1Kp6uLlpotLDYwx_fKGSbPd99Rev7lPPtrcOXO0nXVSBxQmfzpKQ9ilGl89Zn3NjSO1ek2hilMPActTBBYMiKXBhy5jrzyL0yHjW3OqA3gsa9AKtSSCV7sNrfGgzfLLM6qRAU9ImWB1WIMt3AOhLYpE3N3hnP1zQI-MP-N05t-9r_9jmuw9Vu-8w2W7zfgBWsb8KVM6SKt8BtMrLcjGz9x-Rt5CCoRyx2fBuzPnlszyY1Ozj-ThcxGTrCKaNwnCbChm2l2qcoH7PT7L0h5bRj_H2o15Gr9Da8O5dZ3oFePanxLrACfTCogzZOydyilaUOwsg8R5XpoliDZ4tlrlzHsx7bfYwrirciJKpTSKzB46XsScsu8lepfkTLUiIygjc3JtNR1RmYypCu5VyrzEvaAnuKotFaJYJEmrIw9FrrCyBVnZmaVacouvfvx4_g0s7hwX61vzvYuw-XeSzsaUrX16E3n37BB3DRfZ0fz6YPO41g8OG8UfcLQ6tOag
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1Lb9QwEB6VFiE48EYUClgCDhyiTezYTg4IdWlXVIVlxUu9pX6MVxVLtuwur7_Gr2OcZLdFIG49cIuSkRXH38x4xpNvAB4Z43Tq0iLxNrdJnjlSKRQ-EUFKo50LqWqbTejhsDg4KEdr8HP5L0wsq1zaxMZQ-6mLOfIeJ6QVkR6K90JXFjHaGTw7_pzEDlLxpHXZTqOFyD7--Ebh2_zp3g6t9WPOB7vvnr9Iug4DiRMqWyQl7VeMLJ23PuPGlt65IlXGSImBa1TCBIEhK7Qw5NhV5pF7aTwqblVAbwSNew42tChT0q6N_u5w9GaV4UmFoABQtJyogkR6WEcym7Sp3zvlBZtmAX_4gsbBDa78z5_mKlzuttVsu9WDa7CG9XW4dIps8Qa4bUYWnZEP-Ji8jdwE9ZjFTnAT1idP7tm0Zq-OvtNFTJKOccYoTKeJsFFbwfYpysesNftgSGntBH8f6nXkML0J789klrdgvZ7WeBtYgT4YVEEZJ3Nt0ealCsLkWqPMVFFswpPlkleu41-PbUAmFcVhER7VCTw24eFK9rhlHfmrVD8iZyURmcKbG9PZuOoMT2VIBzVXMvM5bY09RddorRQhR5qyMPRaW0tQVZ35mlcniLrz78cP4AJBrXq5N9y_Cxd5rPdpKtq3YH0x-4L34Lz7ujiaz-53ysHg8KxB9wt57lct
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+New+Peak-Shaving+Model+Based+on+Mixed+Integer+Linear+Programming+with+Variable+Peak-Shaving+Order&rft.jtitle=Energies+%28Basel%29&rft.date=2021-02-01&rft.pub=MDPI+AG&rft.eissn=1996-1073&rft.volume=14&rft.issue=4&rft.spage=887&rft_id=info:doi/10.3390%2Fen14040887&rft.externalDBID=HAS_PDF_LINK
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1996-1073&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1996-1073&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1996-1073&client=summon