Kaizen event process quality: towards a phase-based understanding of high-quality group problem-solving

PurposeAs a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors aimed to grasp what is needed during high-quality KE meetings. Guided by the phased approach for structured problem-solving,...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:International journal of operations & production management Ročník 41; číslo 6; s. 962 - 990
Hlavní autori: Franken, José C.M, van Dun, Desirée H, Wilderom, Celeste P.M
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Bradford Emerald Publishing Limited 19.08.2021
Emerald Group Publishing Limited
Predmet:
ISSN:0144-3577, 1758-6593
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract PurposeAs a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors aimed to grasp what is needed during high-quality KE meetings. Guided by the phased approach for structured problem-solving, the authors built and explored a measure for enriching future KE research.Design/methodology/approachSix phases were used to code all verbal contributions (N = 5,442) in 21 diverse, videotaped KE meetings. Resembling state space grids, the authors visualised the course of each meeting with line graphs which were shown to ten individual kaizen experts as well as to the filmed kaizen groups.FindingsFrom their reactions to the graphs the authors extracted high-quality KE process characteristics. At the end of each phase, that should be enacted sequentially, explicit group consensus appeared to be crucial. Some of the groups spent too little time on a group-shared understanding of the problem and its root causes. Surprisingly, the mixed-methods data suggested that small and infrequent deviations (“jumps”) to another phase might be necessary for a high-quality process. According to the newly developed quantitative process measure, when groups often jump from one phase to a distant, previous or next phase, this relates to low KE process quality.Originality/valueA refined conceptual model and research agenda are offered for generating better solutions during KEs, and the authors urge examinations of the effects of well-crafted KE training.
AbstractList PurposeAs a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors aimed to grasp what is needed during high-quality KE meetings. Guided by the phased approach for structured problem-solving, the authors built and explored a measure for enriching future KE research.Design/methodology/approachSix phases were used to code all verbal contributions (N = 5,442) in 21 diverse, videotaped KE meetings. Resembling state space grids, the authors visualised the course of each meeting with line graphs which were shown to ten individual kaizen experts as well as to the filmed kaizen groups.FindingsFrom their reactions to the graphs the authors extracted high-quality KE process characteristics. At the end of each phase, that should be enacted sequentially, explicit group consensus appeared to be crucial. Some of the groups spent too little time on a group-shared understanding of the problem and its root causes. Surprisingly, the mixed-methods data suggested that small and infrequent deviations (“jumps”) to another phase might be necessary for a high-quality process. According to the newly developed quantitative process measure, when groups often jump from one phase to a distant, previous or next phase, this relates to low KE process quality.Originality/valueA refined conceptual model and research agenda are offered for generating better solutions during KEs, and the authors urge examinations of the effects of well-crafted KE training.
PurposeAs a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those events, the authors aimed to grasp what is needed during high-quality KE meetings. Guided by the phased approach for structured problem-solving, the authors built and explored a measure for enriching future KE research.Design/methodology/approachSix phases were used to code all verbal contributions (N = 5,442) in 21 diverse, videotaped KE meetings. Resembling state space grids, the authors visualised the course of each meeting with line graphs which were shown to ten individual kaizen experts as well as to the filmed kaizen groups.FindingsFrom their reactions to the graphs the authors extracted high-quality KE process characteristics. At the end of each phase, that should be enacted sequentially, explicit group consensus appeared to be crucial. Some of the groups spent too little time on a group-shared understanding of the problem and its root causes. Surprisingly, the mixed-methods data suggested that small and infrequent deviations (“jumps”) to another phase might be necessary for a high-quality process. According to the newly developed quantitative process measure, when groups often jump from one phase to a distant, previous or next phase, this relates to low KE process quality.Originality/valueA refined conceptual model and research agenda are offered for generating better solutions during KEs, and the authors urge examinations of the effects of well-crafted KE training.
Author van Dun, Desirée H
Wilderom, Celeste P.M
Franken, José C.M
Author_xml – sequence: 1
  givenname: José C.M
  orcidid: 0000-0001-5336-8333
  surname: Franken
  fullname: Franken, José C.M
  email: j.c.m.franken@utwente.nl
– sequence: 2
  givenname: Desirée H
  orcidid: 0000-0002-6279-5510
  surname: van Dun
  fullname: van Dun, Desirée H
  email: d.h.vandun@utwente.nl
– sequence: 3
  givenname: Celeste P.M
  orcidid: 0000-0002-8614-021X
  surname: Wilderom
  fullname: Wilderom, Celeste P.M
  email: c.p.m.wilderom@utwente.nl
BookMark eNp9kU1PGzEQhq2KSg2UP9CTpZ5Nx3Zsx71ViG8QPZSz5fXOJos2drC9IPj13RAurRCXmcv7vCM9s0_2YopIyDcOR5zD4sfF5e3vGwaWCRDAQGv9icy4UQumlZV7ZAZ8PmdSGfOF7JdyDwBCcjUjyyvfv2Ck-Iix0k1OAUuhD6Mf-vr8k9b05HNbqKeblS_Immm0dIwt5lJ9bPu4pKmjq365Ym8QXeY0brZVzYBrVtLwOKW-ks-dHwoevu0Dcnd68uf4nF3fnl0c_7pmQWpe2dzDQjXIjQcb0DbCcCONMhiUtcC14h2HoKENsml8p4xEb2UI80a0tuFBHpDvu97p_sOIpbr7NOY4nXRCaSEUaIAptdilQk6lZOxc6KuvfYo1-35wHNxWq3vV6sC6rVa31Tqh4j90k_u1z88fQ3wH4RqzH9r3mX_-J_8C32ONaw
CitedBy_id crossref_primary_10_1080_09537287_2024_2358402
crossref_primary_10_3390_healthcare13080941
crossref_primary_10_1108_BPMJ_01_2025_0056
crossref_primary_10_1007_s12597_025_00986_y
crossref_primary_10_1080_00207543_2023_2298486
crossref_primary_10_1080_14767333_2022_2146655
crossref_primary_10_1108_IJOPM_06_2022_0371
crossref_primary_10_1108_IJOPM_04_2022_0238
crossref_primary_10_1108_IJOPM_06_2022_0370
crossref_primary_10_1108_IJOPM_07_2021_0428
crossref_primary_10_1108_IJOPM_10_2021_0676
crossref_primary_10_1177_10464964241265295
crossref_primary_10_1108_IJOPM_11_2022_0752
crossref_primary_10_1093_ajhp_zxae373
crossref_primary_10_1108_IJLSS_07_2023_0126
Cites_doi 10.1016/j.ijpe.2008.08.051
10.1080/14783363.2016.1150170
10.1177/014662169401800402
10.2307/259182
10.1287/orsc.2018.1274
10.1177/1094428116663636
10.1108/IJOPM-02-2017-0085
10.1177/1534484320987363
10.1016/j.chb.2017.03.039
10.1146/annurev-orgpsych-012218-015106
10.1108/01443570510581862
10.1108/JKM-05-2018-0290
10.1177/1046496408328703
10.1177/2041386614533586
10.1080/19416520.2011.590297
10.1108/09534810210423008
10.1111/jpim.12525
10.1146/annurev.psych.56.091103.070250
10.1177/104649640103200602
10.1177/01466219922031257
10.1111/j.1745-6916.2007.00051.x
10.1108/IJOPM-11-2020-0809
10.1016/S0065-2601(08)60248-8
10.1080/00207543.2019.1633028
10.1177/1059601110369729
10.1080/00207543.2015.1096976
10.1108/TPM-03-2015-0012
10.1108/09544780610660004
10.1037/a0021549
10.3758/MC.36.3.554
10.11648/j.ajtas.20160501.11
10.1177/014920638601200409
10.1080/14783363.2018.1428087
10.1108/IJLSS-06-2015-0025
10.1016/j.jom.2010.06.002
10.3102/0034654307313795
10.1108/02683949710174838
10.1108/IJOPM-03-2013-0134
10.1016/j.ijpe.2012.05.035
10.1177/1046496406292938
10.1002/piq.20026
10.5465/amj.2017.0967
10.1108/MRR-06-2019-0284
10.1002/j.2168-9830.2000.tb00551.x
10.2307/1415351
10.1037/apl0000128
10.1108/00251740210430443
10.1177/1046496420985920
10.1108/Ijopm-06-2019-0486
10.3389/fpsyg.2017.01730
10.1016/j.omega.2011.02.002
10.1108/TQM-12-2017-0171
10.5465/amr.2018.0482
10.1111/caim.12416
10.1108/IJLSS-12-2012-0014
10.17485/ijst/2010/v3i10.7
10.1108/01443570410558049
10.1016/j.emj.2016.05.001
10.1177/1046496417720285
10.1108/IJPPM-07-2018-0282
10.1111/poms.12667
10.1177/1558689806298224
10.1108/09696470110391211
10.1080/10429247.2014.11432003
10.1016/S0166-4972(00)00023-7
10.1108/IJOPM-03-2011-0119
10.1287/orsc.2015.1024
10.1016/j.ins.2018.05.017
10.1111/poms.12219
10.1002/joom.1065
10.1108/09696471211220046
10.1108/09696470310486629
10.1007/s11251-013-9278-1
10.1016/j.obhdp.2007.08.005
10.1177/1534484310371449
10.1002/pf.36
10.1177/1046496421992433
ContentType Journal Article
Copyright José C.M. Franken, Desirée H. van Dun and Celeste P.M. Wilderom
José C.M. Franken, Desirée H. van Dun and Celeste P.M. Wilderom. This work is published under https://creativecommons.org/licenses/by-nc/3.0/legalcode (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
Copyright_xml – notice: José C.M. Franken, Desirée H. van Dun and Celeste P.M. Wilderom
– notice: José C.M. Franken, Desirée H. van Dun and Celeste P.M. Wilderom. This work is published under https://creativecommons.org/licenses/by-nc/3.0/legalcode (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.
DBID XDTOA
AAYXX
CITATION
7TB
7WY
7WZ
7XB
8AO
8FD
8FE
8FG
8FI
ABJCF
AFKRA
AZQEC
BENPR
BEZIV
BGLVJ
CCPQU
DWQXO
FR3
FYUFA
F~G
GNUQQ
GUQSH
HCIFZ
K6~
K8~
L.-
L.0
L6V
M0C
M0T
M2O
M7S
MBDVC
PHGZM
PHGZT
PJZUB
PKEHL
PPXIY
PQBIZ
PQEST
PQGLB
PQQKQ
PQUKI
PRINS
PTHSS
Q9U
DOI 10.1108/IJOPM-09-2020-0666
DatabaseName Emerald Open Access Journals
CrossRef
Mechanical & Transportation Engineering Abstracts
ABI/INFORM Collection
ABI/INFORM Global (PDF only)
ProQuest Central (purchase pre-March 2016)
ProQuest Pharma Collection
Technology Research Database
ProQuest SciTech Collection
ProQuest Technology Collection
Hospital Premium Collection
Materials Science & Engineering Collection
ProQuest Central UK/Ireland
ProQuest Central Essentials
ProQuest Central
Business Premium Collection
Technology collection
ProQuest One Community College
ProQuest Central
Engineering Research Database
Health Research Premium Collection
ABI/INFORM Global (Corporate)
ProQuest Central Student
Research Library Prep
SciTech Premium Collection
ProQuest Business Collection
DELNET Management Collection
ABI/INFORM Professional Advanced
ABI/INFORM Professional Standard
ProQuest Engineering Collection
ABI/INFORM Global (OCUL)
Health Management Database (Proquest)
Research Library (Proquest)
Engineering Database
Research Library (Corporate)
ProQuest Central Premium
ProQuest One Academic
ProQuest Health & Medical Research Collection
ProQuest One Academic Middle East (New)
One Health & Nursing
ProQuest One Business
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic (retired)
ProQuest One Academic UKI Edition
ProQuest Central China
Engineering Collection
ProQuest Central Basic
DatabaseTitle CrossRef
ABI/INFORM Global (Corporate)
ProQuest One Business
Research Library Prep
ProQuest Central Student
Technology Collection
Technology Research Database
ProQuest One Academic Middle East (New)
Mechanical & Transportation Engineering Abstracts
ProQuest Central Essentials
SciTech Premium Collection
ProQuest One Community College
ProQuest One Health & Nursing
ProQuest Pharma Collection
ProQuest Central China
ABI/INFORM Complete
ProQuest Central
ABI/INFORM Professional Advanced
ProQuest One Applied & Life Sciences
ProQuest Health & Medical Research Collection
ProQuest Engineering Collection
Health Research Premium Collection
ABI/INFORM Professional Standard
ProQuest Central Korea
Health & Medical Research Collection
ProQuest Research Library
ProQuest Central (New)
Engineering Collection
Business Premium Collection
ABI/INFORM Global
Engineering Database
ProQuest Central Basic
ProQuest One Academic Eastern Edition
ProQuest Health Management
ProQuest Hospital Collection
ProQuest Technology Collection
ProQuest SciTech Collection
ProQuest Business Collection
ProQuest One Academic UKI Edition
ProQuest DELNET Management Collection
Materials Science & Engineering Collection
Engineering Research Database
ProQuest One Academic
ProQuest One Academic (New)
DatabaseTitleList ABI/INFORM Global (Corporate)

Database_xml – sequence: 1
  dbid: M0T
  name: Health Management Database (Proquest)
  url: https://search.proquest.com/healthmanagement
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Business
EISSN 1758-6593
EndPage 990
ExternalDocumentID 10_1108_IJOPM_09_2020_0666
10.1108/IJOPM-09-2020-0666
GroupedDBID 0R
29J
3FY
4.4
5GY
5VS
70U
7WY
9E0
9F-
AADTA
AADXL
AAGBP
AAMCF
AAPBV
AAUDR
ABCTS
ABIJV
ABSDC
ACGFS
ACHQT
ACIWK
ACMTK
ADBBV
ADOMW
AEBZA
AEDOK
AEGYS
AEUCW
AFZLO
AJEBP
ALMA_UNASSIGNED_HOLDINGS
APPLU
ASMFL
ATGMP
AUCOK
AVELQ
BFOSL
BLEHN
BUONS
CAG
CS3
DU5
EBS
ECCUG
FNNZZ
GEA
GEB
GEC
GEI
GMM
GMN
GMX
GQ.
GROUPED_ABI_INFORM_COMPLETE
HCIFZ
HZ
IAO
IEA
IGG
IJT
IOF
IPNFZ
J1Y
JI-
JL0
K6
KBGRL
LXL
LXN
M2O
MS
N95
O9-
P2P
RIG
RXW
TEM
TET
TFE
TGG
TMD
TMF
TMK
TMT
UPT
V1G
WH7
WW
X
XDTOA
Z11
Z12
Z21
ZYZAG
-~X
.WW
0R~
8AO
8FE
8FG
8FI
8R4
8R5
AAKOT
AAPSD
AAXBI
AAYXX
ABEAN
ABJCF
ABJNI
ABXQL
ABYQI
ACBMB
ACGFO
ACTSA
ADFRT
ADMHG
ADQHX
ADWNT
AEFVF
AEMMR
AETHF
AFFHD
AFKRA
AFNZV
AGTVX
AGZLY
AHMHQ
AHRLE
AIAFM
AILOG
AJFKA
AODMV
AQUVI
ASJQZ
AZQEC
BENPR
BEZIV
BGLVJ
BPHCQ
BTXLY
BVXVI
CCPQU
CITATION
DWQXO
EOXHF
FYUFA
GNUQQ
GROUPED_ABI_INFORM_RESEARCH
GUQSH
H13
HZ~
K6~
K8~
L6V
M0C
M0T
M42
M7S
MS~
PHGZM
PHGZT
PJZUB
PPXIY
PQBIZ
PQGLB
PQQKQ
PRG
PROAC
PTHSS
Q2X
SCAQC
SDURG
UKHRP
7TB
7XB
8FD
AFNTC
FR3
L.-
L.0
MBDVC
PKEHL
PQEST
PQUKI
PRINS
PUEGO
Q9U
ID FETCH-LOGICAL-c361t-4a085be17a09ce9b27173757ec59901651f10c60dc3bbaf573ea93cc4b2d9b1c3
IEDL.DBID M7S
ISICitedReferencesCount 23
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000678707100001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0144-3577
IngestDate Sat Aug 23 12:34:41 EDT 2025
Sat Nov 29 07:41:52 EST 2025
Tue Nov 18 21:39:54 EST 2025
Tue Nov 30 13:58:58 EST 2021
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 6
Keywords Structured problem-solving
Group process quality
Kaizen event
Language English
License Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at
https://www.emerald.com/insight/site-policies
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c361t-4a085be17a09ce9b27173757ec59901651f10c60dc3bbaf573ea93cc4b2d9b1c3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0002-8614-021X
0000-0001-5336-8333
0000-0002-6279-5510
OpenAccessLink https://www.emerald.com/insight/content/doi/10.1108/IJOPM-09-2020-0666/full/html
PQID 2562250600
PQPubID 36644
PageCount 29
ParticipantIDs proquest_journals_2562250600
crossref_citationtrail_10_1108_IJOPM_09_2020_0666
emerald_primary_10_1108_IJOPM-09-2020-0666
crossref_primary_10_1108_IJOPM_09_2020_0666
PublicationCentury 2000
PublicationDate 2021-08-19
PublicationDateYYYYMMDD 2021-08-19
PublicationDate_xml – month: 08
  year: 2021
  text: 2021-08-19
  day: 19
PublicationDecade 2020
PublicationPlace Bradford
PublicationPlace_xml – name: Bradford
PublicationTitle International journal of operations & production management
PublicationYear 2021
Publisher Emerald Publishing Limited
Emerald Group Publishing Limited
Publisher_xml – name: Emerald Publishing Limited
– name: Emerald Group Publishing Limited
References (key2021081817191918000_ref070) 1932; 44
(key2021081817191918000_ref075) 2002; 15
(key2021081817191918000_ref055) 2002; 40
(key2021081817191918000_ref010) 2018; 38
(key2021081817191918000_ref058) 2020; 43
(key2021081817191918000_ref002) 2018; 30
(key2021081817191918000_ref019) 2016; 5
(key2021081817191918000_ref042) 2010; 9
(key2021081817191918000_ref059) 2003; 10
(key2021081817191918000_ref043) 2008; 21
(key2021081817191918000_ref004) 2019; 63
(key2021081817191918000_ref044) 2015; 5
(key2021081817191918000_ref014) 2011; 15
(key2021081817191918000_ref037) 2007; 1
(key2021081817191918000_ref025) 2014; 26
(key2021081817191918000_ref083) 2000; 89
(key2021081817191918000_ref040) 2017; 28
(key2021081817191918000_ref016) 2011; 39
(key2021081817191918000_ref063) 2018; 459
(key2021081817191918000_ref005) 2017; 26
(key2021081817191918000_ref001) 2016; 7
(key2021081817191918000_ref077) 2017; 35
(key2021081817191918000_ref067) 2010; 3
(key2021081817191918000_ref054) 2019; 6
(key2021081817191918000_ref026) 2020; 37
(key2021081817191918000_ref033) 2005; 56
(key2021081817191918000_ref076) 2006; 37
(key2021081817191918000_ref031) 1986; 12
(key2021081817191918000_ref018) 2016; 27
(key2021081817191918000_ref078) 2008; 105
(key2021081817191918000_ref013) 2018; 21
(key2021081817191918000_ref047) 1996
(key2021081817191918000_ref023) 2019; 23
(key2021081817191918000_ref022) 2019; 30
(key2021081817191918000_ref080) 2019; 68
(key2021081817191918000_ref008) 2007; 2
(key2021081817191918000_ref046) 2015; 35
(key2021081817191918000_ref007) 2005; 25
(key2021081817191918000_ref024) 2013; 33
(key2021081817191918000_ref072) 2008; 78
(key2021081817191918000_ref086) 2021
(key2021081817191918000_ref009) 2001; 21
(key2021081817191918000_ref079) 1994
key2021081817191918000_ref028
(key2021081817191918000_ref064) 2020; 40
(key2021081817191918000_ref052) 2001; 26
(key2021081817191918000_ref017) 2012; 139
(key2021081817191918000_ref048) 2004
(key2021081817191918000_ref071) 2007
(key2021081817191918000_ref012) 2014; 23
(key2021081817191918000_ref020) 2009; 117
(key2021081817191918000_ref089) 2019; 65
(key2021081817191918000_ref006) 2011; 29
(key2021081817191918000_ref029) 2017; 8
(key2021081817191918000_ref038) 2021; 52
(key2021081817191918000_ref050) 2015; 21
(key2021081817191918000_ref057) 1994; 18
(key2021081817191918000_ref060) 2016; 54
key2021081817191918000_ref056
(key2021081817191918000_ref053) 2017; 102
(key2021081817191918000_ref061) 2001; 8
(key2021081817191918000_ref062) 2021
(key2021081817191918000_ref011) 2014; 42
(key2021081817191918000_ref069) 2019
(key2021081817191918000_ref032) 2004; 24
(key2021081817191918000_ref045) 2001
(key2021081817191918000_ref065) 2008; 36
(key2021081817191918000_ref068) 2018; 7
(key2021081817191918000_ref051) 2020; 31
(key2021081817191918000_ref081) 2021; 30
(key2021081817191918000_ref030) 2017; 73
(key2021081817191918000_ref035) 2014; 5
(key2021081817191918000_ref036) 2018; 49
(key2021081817191918000_ref027) 2020
(key2021081817191918000_ref041) 1965
(key2021081817191918000_ref003) 2006; 18
(key2021081817191918000_ref049) 1999; 23
(key2021081817191918000_ref084) 2010; 35
(key2021081817191918000_ref073) 2001; 32
(key2021081817191918000_ref015) 2011; 5
(key2021081817191918000_ref082) 2009; 40
(key2021081817191918000_ref021) 1997; 12
(key2021081817191918000_ref074) 2020; 58
(key2021081817191918000_ref039) 2021
(key2021081817191918000_ref034) 1997
(key2021081817191918000_ref085) 2019
(key2021081817191918000_ref066) 2012; 19
References_xml – volume: 117
  start-page: 42
  issue: 1
  year: 2009
  ident: key2021081817191918000_ref020
  article-title: Critical success factors for human resource outcomes in kaizen events: an empirical study
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2008.08.051
– volume: 28
  start-page: 1469
  issue: 13-14
  year: 2017
  ident: key2021081817191918000_ref040
  article-title: What motivates employees to participate in continuous improvement activities?
  publication-title: Total Quality Management and Business Excellence
  doi: 10.1080/14783363.2016.1150170
– volume: 18
  start-page: 311
  issue: 4
  year: 1994
  ident: key2021081817191918000_ref057
  article-title: The number of Guttman errors as a simple and powerful person-fit statistic
  publication-title: Applied Psychological Measurement
  doi: 10.1177/014662169401800402
– volume-title: The Rational Manager
  year: 1965
  ident: key2021081817191918000_ref041
– volume: 26
  start-page: 356
  issue: 3
  year: 2001
  ident: key2021081817191918000_ref052
  article-title: A temporally based framework and taxonomy of team processes
  publication-title: Academy of Management Review
  doi: 10.2307/259182
– volume: 30
  start-page: 280
  issue: 2
  year: 2019
  ident: key2021081817191918000_ref022
  article-title: Organizational and perceived learning in the workplace: a multilevel perspective on employees' problem solving
  publication-title: Organization Science
  doi: 10.1287/orsc.2018.1274
– year: 2019
  ident: key2021081817191918000_ref085
  article-title: Developing problem-solving capabilities for sustainable solutions: a dynamic capability approach
– volume: 21
  start-page: 261
  issue: 2
  year: 2018
  ident: key2021081817191918000_ref013
  article-title: Mapping the terrain: the use of video-based research in top-tier organizational journals
  publication-title: Organizational Research Methods
  doi: 10.1177/1094428116663636
– volume-title: Toyota Kata: Managing People for Improvement, Adaptiveness and Superior Results
  year: 2019
  ident: key2021081817191918000_ref069
– volume-title: Four Days with Dr. Deming: A Strategy for Modern Methods of Management
  year: 1996
  ident: key2021081817191918000_ref047
– volume: 38
  start-page: 554
  issue: 2
  year: 2018
  ident: key2021081817191918000_ref010
  article-title: The social benefits of kaizen initiatives in healthcare: an empirical study
  publication-title: International Journal of Operations & Production Management
  doi: 10.1108/IJOPM-02-2017-0085
– volume: 7
  start-page: 68
  issue: 11
  year: 2018
  ident: key2021081817191918000_ref068
  article-title: Short review of QCC (Quality Control Circle) implementation toward productivity improvement: case study
  publication-title: International Journal of Engineering Research and Technology
– start-page: 1
  year: 2021
  ident: key2021081817191918000_ref039
  article-title: A meta-analytic review of the relationship between learning organization and organizational performance and employee attitudes: using the dimensions of learning organization questionnaire
  publication-title: Human Resource Development Review
  doi: 10.1177/1534484320987363
– volume: 73
  start-page: 200
  year: 2017
  ident: key2021081817191918000_ref030
  article-title: Some things are better left unseen: toward more effective communication and team performance in video-mediated interactions
  publication-title: Computers in Human Behavior
  doi: 10.1016/j.chb.2017.03.039
– volume: 6
  start-page: 17
  issue: 1
  year: 2019
  ident: key2021081817191918000_ref054
  article-title: Embracing complexity: reviewing the past decade of team effectiveness research
  publication-title: Annual Review of Organizational Psychology and Organizational Behavior
  doi: 10.1146/annurev-orgpsych-012218-015106
– volume: 25
  start-page: 261
  issue: 3
  year: 2005
  ident: key2021081817191918000_ref007
  article-title: Sustainability: the elusive element of process improvement
  publication-title: International Journal of Operations & Production Management
  doi: 10.1108/01443570510581862
– volume: 23
  start-page: 1017
  issue: 6
  year: 2019
  ident: key2021081817191918000_ref023
  article-title: Good problem solvers? Leveraging knowledge sharing mechanisms and management support
  publication-title: Journal of Knowledge Management
  doi: 10.1108/JKM-05-2018-0290
– volume: 40
  start-page: 247
  issue: 2
  year: 2009
  ident: key2021081817191918000_ref082
  article-title: Group size, group development, and group productivity
  publication-title: Small Group Research
  doi: 10.1177/1046496408328703
– volume: 5
  start-page: 270
  issue: 4
  year: 2015
  ident: key2021081817191918000_ref044
  article-title: Advancing research on team process dynamics: theoretical, methodological, and measurement considerations
  publication-title: Organizational Psychology Review
  doi: 10.1177/2041386614533586
– volume-title: The Think Aloud Method: A Practical Approach to Modelling Cognitive Processes
  year: 1994
  ident: key2021081817191918000_ref079
– volume: 5
  start-page: 571
  issue: 1
  year: 2011
  ident: key2021081817191918000_ref015
  article-title: Dynamics in groups: are we there yet?
  publication-title: Academy of Management Annals
  doi: 10.1080/19416520.2011.590297
– volume: 15
  start-page: 122
  issue: 2
  year: 2002
  ident: key2021081817191918000_ref075
  article-title: When problem solving prevents organizational learning
  publication-title: Journal of Organizational Change Management
  doi: 10.1108/09534810210423008
– volume: 37
  start-page: 324
  issue: 4
  year: 2020
  ident: key2021081817191918000_ref026
  article-title: From empowerment dynamics to team adaptability: exploring and conceptualizing the continuous agile team innovation process
  publication-title: Journal of Product Innovation Management
  doi: 10.1111/jpim.12525
– volume: 56
  start-page: 517
  issue: 1
  year: 2005
  ident: key2021081817191918000_ref033
  article-title: Teams in organizations: from input-process-output models to IMOI models
  publication-title: Annual Review of Psychology
  doi: 10.1146/annurev.psych.56.091103.070250
– volume: 32
  start-page: 698
  issue: 6
  year: 2001
  ident: key2021081817191918000_ref073
  article-title: Problem-solving team behaviors: development and validation of BOS and a hierarchical factor structure
  publication-title: Small Group Research
  doi: 10.1177/104649640103200602
– volume: 23
  start-page: 127
  issue: 2
  year: 1999
  ident: key2021081817191918000_ref049
  article-title: A revised index of interrater agreement for multi-item ratings of a single target
  publication-title: Applied Psychological Measurement
  doi: 10.1177/01466219922031257
– volume: 2
  start-page: 396
  issue: 4
  year: 2007
  ident: key2021081817191918000_ref008
  article-title: Psychology as the science of self-reports and finger movements: whatever happened to actual behavior?
  publication-title: Perspectives on Psychological Science
  doi: 10.1111/j.1745-6916.2007.00051.x
– year: 2021
  ident: key2021081817191918000_ref086
  article-title: Improving high lean team performance through aligned behaviour-value patterns and coactive vicarious learning-by-doing
  publication-title: International Journal of Operations and Production Management
  doi: 10.1108/IJOPM-11-2020-0809
– ident: key2021081817191918000_ref028
  doi: 10.1016/S0065-2601(08)60248-8
– volume: 58
  start-page: 3650
  issue: 12
  year: 2020
  ident: key2021081817191918000_ref074
  article-title: Learning organisation and lean production: an empirical research on their relationship
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2019.1633028
– volume: 35
  start-page: 243
  issue: 3
  year: 2010
  ident: key2021081817191918000_ref084
  article-title: Problems as building blocks for organizational learning: a roadmap for experiential inquiry
  publication-title: Group & Organization Management
  doi: 10.1177/1059601110369729
– volume: 54
  start-page: 2433
  issue: 8
  year: 2016
  ident: key2021081817191918000_ref060
  article-title: Critical success factors for implementing lean production: the effect of contingencies
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2015.1096976
– volume: 21
  start-page: 361
  issue: 7/8
  year: 2015
  ident: key2021081817191918000_ref050
  article-title: Understanding team mental models affecting kaizen event success
  publication-title: Team Performance Management: An International Journal
  doi: 10.1108/TPM-03-2015-0012
– volume: 18
  start-page: 282
  issue: 3
  year: 2006
  ident: key2021081817191918000_ref003
  article-title: Similarities and differences between TQM, six sigma and lean
  publication-title: The TQM Magazine
  doi: 10.1108/09544780610660004
– volume: 15
  start-page: 90
  issue: 1
  year: 2011
  ident: key2021081817191918000_ref014
  article-title: Meeting design characteristics and attendee perceptions of staff/team meeting quality
  publication-title: Group Dynamics: Theory, Research and Practice
  doi: 10.1037/a0021549
– volume: 36
  start-page: 554
  issue: 3
  year: 2008
  ident: key2021081817191918000_ref065
  article-title: Intuition versus analysis: strategy and experience in complex everyday problem solving
  publication-title: Memory and Cognition
  doi: 10.3758/MC.36.3.554
– volume: 5
  start-page: 1
  issue: 1
  year: 2016
  ident: key2021081817191918000_ref019
  article-title: Comparison of convenience sampling and purposive sampling
  publication-title: American Journal of Theoretical and Applied Statistics
  doi: 10.11648/j.ajtas.20160501.11
– volume: 12
  start-page: 545
  issue: 4
  year: 1986
  ident: key2021081817191918000_ref031
  article-title: Task effectiveness and interaction process of a modified nominal group technique in solving an evaluation problem
  publication-title: Journal of Management
  doi: 10.1177/014920638601200409
– volume: 31
  start-page: 407
  issue: 3-4
  year: 2020
  ident: key2021081817191918000_ref051
  article-title: Comparative analysis of Lean and Six Sigma improvement projects: performance, changes, investment, time and complexity
  publication-title: Total Quality Management and Business Excellence
  doi: 10.1080/14783363.2018.1428087
– volume: 7
  start-page: 214
  issue: 3
  year: 2016
  ident: key2021081817191918000_ref001
  article-title: Systematic literature review of critical success factors for continuous improvement projects
  publication-title: International Journal of Lean Six Sigma
  doi: 10.1108/IJLSS-06-2015-0025
– volume: 29
  start-page: 329
  issue: 4
  year: 2011
  ident: key2021081817191918000_ref006
  article-title: Qualitative case studies in operations management: trends, research outcomes, and future research implications
  publication-title: Journal of Operations Management
  doi: 10.1016/j.jom.2010.06.002
– volume: 78
  start-page: 153
  issue: 1
  year: 2008
  ident: key2021081817191918000_ref072
  article-title: Focus on formative feedback
  publication-title: Review of Educational Research
  doi: 10.3102/0034654307313795
– volume: 12
  start-page: 232
  issue: 4
  year: 1997
  ident: key2021081817191918000_ref021
  article-title: Team or group? Managers' perceptions of the differences
  publication-title: Journal of Managerial Psychology
  doi: 10.1108/02683949710174838
– volume: 35
  start-page: 201
  issue: 2
  year: 2015
  ident: key2021081817191918000_ref046
  article-title: Achieving employee commitment for continuous improvement initiatives
  publication-title: International Journal of Operations and Production Management
  doi: 10.1108/IJOPM-03-2013-0134
– volume-title: The Toyota Way
  year: 2004
  ident: key2021081817191918000_ref048
– volume: 139
  start-page: 604
  issue: 2
  year: 2012
  ident: key2021081817191918000_ref017
  article-title: An analysis of the Six Sigma DMAIC method from the perspective of problem solving
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2012.05.035
– volume: 37
  start-page: 490
  issue: 5
  year: 2006
  ident: key2021081817191918000_ref076
  article-title: Social and cognitive factors driving teamwork in collaborative learning environments
  publication-title: Small Group Research
  doi: 10.1177/1046496406292938
– volume: 21
  start-page: 119
  issue: 2
  year: 2008
  ident: key2021081817191918000_ref043
  article-title: A model of small group facilitator competencies
  publication-title: Performance Improvement Quarterly
  doi: 10.1002/piq.20026
– volume: 63
  start-page: 1266
  issue: 4
  year: 2019
  ident: key2021081817191918000_ref004
  article-title: The roles of material artifacts in managing the learning-performance paradox: the kaizen case
  publication-title: Academy of Management Journal
  doi: 10.5465/amj.2017.0967
– volume: 43
  start-page: 1033
  issue: 9
  year: 2020
  ident: key2021081817191918000_ref058
  article-title: Systematic problem-solving and its antecedents: a synthesis of the literature
  publication-title: Management Research Review
  doi: 10.1108/MRR-06-2019-0284
– volume: 89
  start-page: 443
  issue: 4
  year: 2000
  ident: key2021081817191918000_ref083
  article-title: An evidence‐based strategy for problem solving
  publication-title: Journal of Engineering Education
  doi: 10.1002/j.2168-9830.2000.tb00551.x
– volume: 44
  start-page: 491
  issue: 3
  year: 1932
  ident: key2021081817191918000_ref070
  article-title: A comparison of individuals and small groups in the rational solution of complex problems
  publication-title: The American Journal of Psychology
  doi: 10.2307/1415351
– volume: 102
  start-page: 452
  issue: 3
  year: 2017
  ident: key2021081817191918000_ref053
  article-title: A century of work teams in the Journal of Applied Psychology
  publication-title: Journal of Applied Psychology
  doi: 10.1037/apl0000128
– volume-title: Gemba Kaizen: A Commonsense, Low-Cost Approach to Management
  year: 1997
  ident: key2021081817191918000_ref034
– volume: 40
  start-page: 463
  issue: 5
  year: 2002
  ident: key2021081817191918000_ref055
  article-title: Developing and supporting creative problem-solving teams: Part 1 - a conceptual model
  publication-title: Management Decision
  doi: 10.1108/00251740210430443
– volume: 52
  start-page: 341
  issue: 3
  year: 2021
  ident: key2021081817191918000_ref038
  article-title: Observational research in face-to-face small groupwork: capturing affect as socio-dynamic interpersonal phenomena
  publication-title: Small Group Research
  doi: 10.1177/1046496420985920
– volume: 40
  start-page: 921
  issue: 7-8
  year: 2020
  ident: key2021081817191918000_ref064
  article-title: Rethinking lean supplier development as a learning system
  publication-title: International Journal of Operations and Production Management
  doi: 10.1108/Ijopm-06-2019-0486
– volume: 8
  year: 2017
  ident: key2021081817191918000_ref029
  article-title: Complex problem solving in teams: the impact of collective orientation on team process demands
  publication-title: Frontiers in PsychologySEP
  doi: 10.3389/fpsyg.2017.01730
– volume: 39
  start-page: 702
  issue: 6
  year: 2011
  ident: key2021081817191918000_ref016
  article-title: The tactical use of constraints and structure in diagnostic problem solving
  publication-title: Omega
  doi: 10.1016/j.omega.2011.02.002
– volume: 30
  start-page: 356
  issue: 4
  year: 2018
  ident: key2021081817191918000_ref002
  article-title: Systematic bibliometric analysis on kaizen in scientific journals
  publication-title: The TQM Journal
  doi: 10.1108/TQM-12-2017-0171
– volume-title: When Teams Work Best: 6,000 Team Members and Leaders Tell what it Takes to Succeed
  year: 2001
  ident: key2021081817191918000_ref045
– year: 2020
  ident: key2021081817191918000_ref027
  article-title: Achieving rigor in qualitative analysis: the role of active categorization in theory building
  publication-title: Academy of Management Review
  doi: 10.5465/amr.2018.0482
– volume: 30
  start-page: 116
  issue: 1
  year: 2021
  ident: key2021081817191918000_ref081
  article-title: The IKEA effect in collective problem‐solving: when individuals prioritize their own solutions
  publication-title: Creativity and Innovation Management
  doi: 10.1111/caim.12416
– volume: 5
  start-page: 122
  issue: 2
  year: 2014
  ident: key2021081817191918000_ref035
  article-title: Exploring barriers in lean implementation
  publication-title: International Journal of Lean Six Sigma
  doi: 10.1108/IJLSS-12-2012-0014
– volume: 3
  start-page: 1052
  issue: 10
  year: 2010
  ident: key2021081817191918000_ref067
  article-title: Six sigma based exponentially weighted moving average control chart
  publication-title: Indian Journal of Science and Technology
  doi: 10.17485/ijst/2010/v3i10.7
– volume: 24
  issue: 10
  year: 2004
  ident: key2021081817191918000_ref032
  article-title: Learning to evolve: a review of contemporary lean thinking
  publication-title: International Journal of Operations and Production Management
  doi: 10.1108/01443570410558049
– volume: 35
  start-page: 174
  issue: 2
  year: 2017
  ident: key2021081817191918000_ref077
  article-title: Values and behaviors of effective lean managers: mixed-methods exploratory research
  publication-title: European Management Journal
  doi: 10.1016/j.emj.2016.05.001
– volume: 49
  start-page: 177
  issue: 2
  year: 2018
  ident: key2021081817191918000_ref036
  article-title: After brainstorming, groups select an early generated idea as their best idea
  publication-title: Small Group Research
  doi: 10.1177/1046496417720285
– volume: 68
  start-page: 1343
  issue: 7
  year: 2019
  ident: key2021081817191918000_ref080
  article-title: Kaizen event approach: a case study in the packaging industry
  publication-title: International Journal of Productivity and Performance Management
  doi: 10.1108/IJPPM-07-2018-0282
– volume: 26
  start-page: 579
  issue: 4
  year: 2017
  ident: key2021081817191918000_ref005
  article-title: Organizational learning and management of technology
  publication-title: Production and Operations Management
  doi: 10.1111/poms.12667
– volume: 1
  start-page: 112
  issue: 2
  year: 2007
  ident: key2021081817191918000_ref037
  article-title: Toward a definition of mixed methods research
  publication-title: Journal of Mixed Methods Research
  doi: 10.1177/1558689806298224
– volume: 8
  start-page: 125
  issue: 3
  year: 2001
  ident: key2021081817191918000_ref061
  article-title: On differences between organizational learning and learning organization
  publication-title: The Learning Organization
  doi: 10.1108/09696470110391211
– volume: 26
  start-page: 39
  issue: 1
  year: 2014
  ident: key2021081817191918000_ref025
  article-title: Kaizen events: assessing the existing literature and convergence of practices
  publication-title: Engineering Management Journal
  doi: 10.1080/10429247.2014.11432003
– volume-title: Kaizen and the Art of Creative Thinking: The Scientific Thinking Mechanism
  year: 2007
  ident: key2021081817191918000_ref071
– volume: 21
  start-page: 67
  issue: 2
  year: 2001
  ident: key2021081817191918000_ref009
  article-title: An evolutionary model of continuous improvement behaviour
  publication-title: Technovation
  doi: 10.1016/S0166-4972(00)00023-7
– volume: 33
  start-page: 1166
  issue: 9
  year: 2013
  ident: key2021081817191918000_ref024
  article-title: Characteristics of established kaizen event programs: an empirical study
  publication-title: International Journal of Operations and Production Management
  doi: 10.1108/IJOPM-03-2011-0119
– volume: 27
  start-page: 678
  issue: 3
  year: 2016
  ident: key2021081817191918000_ref018
  article-title: Talking about routines: the role of reflective talk in routine change
  publication-title: Organization Science
  doi: 10.1287/orsc.2015.1024
– volume: 459
  start-page: 20
  year: 2018
  ident: key2021081817191918000_ref063
  article-title: On dynamic consensus processes in group decision making problems
  publication-title: Information Sciences
  doi: 10.1016/j.ins.2018.05.017
– volume: 23
  start-page: 1462
  issue: 8
  year: 2014
  ident: key2021081817191918000_ref012
  article-title: Defining problems fast and slow: the U-shaped effect of problem definition time on project duration
  publication-title: Production and Operations Management
  doi: 10.1111/poms.12219
– volume: 65
  start-page: 710
  issue: 7
  year: 2019
  ident: key2021081817191918000_ref089
  article-title: Intervention as a research strategy
  publication-title: Journal of Operations Management
  doi: 10.1002/joom.1065
– volume: 19
  start-page: 248
  issue: 3
  year: 2012
  ident: key2021081817191918000_ref066
  article-title: Lean vs agile from an organizational sustainability, complexity and learning perspective
  publication-title: The Learning Organization
  doi: 10.1108/09696471211220046
– volume: 10
  start-page: 272
  issue: 5
  year: 2003
  ident: key2021081817191918000_ref059
  article-title: From continuous improvement to organisational learning: developmental theory
  publication-title: The Learning Organization
  doi: 10.1108/09696470310486629
– volume: 42
  start-page: 229
  issue: 2
  year: 2014
  ident: key2021081817191918000_ref011
  article-title: Relative effects of three questioning strategies in ill-structured, small group problem solving
  publication-title: Instructional Science
  doi: 10.1007/s11251-013-9278-1
– volume: 105
  start-page: 82
  issue: 1
  year: 2008
  ident: key2021081817191918000_ref078
  article-title: Group information elaboration and group decision making: the role of shared task representations
  publication-title: Organizational Behavior and Human Decision Processes
  doi: 10.1016/j.obhdp.2007.08.005
– volume: 9
  start-page: 285
  issue: 3
  year: 2010
  ident: key2021081817191918000_ref042
  article-title: Collective (team) learning process models: a conceptual review
  publication-title: Human Resource Development Review
  doi: 10.1177/1534484310371449
– ident: key2021081817191918000_ref056
  doi: 10.1002/pf.36
– year: 2021
  ident: key2021081817191918000_ref062
  article-title: Looking to the middle of the qualitative-quantitative spectrum for integrated mixed methods
  publication-title: Small Group Research
  doi: 10.1177/1046496421992433
SSID ssj0002315
Score 2.4532733
Snippet PurposeAs a problem-solving tool, the kaizen event (KE) is underutilised in practice. Assuming this is due to a lack of group process quality during those...
SourceID proquest
crossref
emerald
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 962
SubjectTerms Circular economy
Graphs
Kaizen
Knowledge
Meetings
Problem solving
Quality circles
Six Sigma
Success factors
Total quality
SummonAdditionalLinks – databaseName: Emerald Management 120
  dbid: TMT
  link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwvV1JS8QwFH6IiOjBXRw3cvCkhGmatpl6ERHFXQ8jeCtJmuqA1tHpCPrrzUvTcUE8eis0KTTLW5Lv-x7AFmMFl7kDPCWc2vhWU9tS0kjb5NkkJopyJ-J6Li4vO7e36fUY6IYL42CV9XGMs9O9coBJahuB29YKjwQHsHrNyenV9QXe3YeYA2Eg3sYz6_Z99fiw13-mWFoKr2B9nQ1npwPcvN2L7shah77KgU0sKI-FaIg1v37_m_P6weD9tOLONR3N_stPzcGMj1zJfr3U5mHMlAsw2QDnF2D6i7ThItydyd67KYkTiCL9mo5Aagrn2y6pHFp3QCTp31s_StGZ5mT4lWlDngqCYsrUdyKOgEJ8BRxq9wyehSzBzdFh9-CY-qIOVPOEVTSSNshThgkZpNqkKkQYgIiF0TFe0SUxK1igkyDXXClZxIIbmXKtIxXmqWKaL8N4-VSaFSCKJUorYWOcSEWGF1LkKCibJ7EOmH1sAWtmK9Ne8RwLbzxkLvMJOpkb7CxIMxzsDAe7BTujPv1a7-PP1tt-Xn9v_G0eW7DerJPMG4pBZiNOa1EDG3au_v16DaZChNOgGm-6DuPVy9BswIR-rXqDl023pj8AkvQGcg
  priority: 102
  providerName: Emerald
Title Kaizen event process quality: towards a phase-based understanding of high-quality group problem-solving
URI https://www.emerald.com/insight/content/doi/10.1108/IJOPM-09-2020-0666/full/html
https://www.proquest.com/docview/2562250600
Volume 41
WOSCitedRecordID wos000678707100001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVMCB
  databaseName: Emerald Management 120
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: TMT
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://www.emerald.com/insight
  providerName: Emerald
– providerCode: PRVPQU
  databaseName: ABI/INFORM Global
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: M0C
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://search.proquest.com/abiglobal
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: ABI商业信息数据库
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: 7WY
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/abicomplete
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Engineering Database
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: M7S
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: http://search.proquest.com
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Health Management Database (Proquest)
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: M0T
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://search.proquest.com/healthmanagement
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: ProQuest Central
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: BENPR
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: Research Library (Proquest)
  customDbUrl:
  eissn: 1758-6593
  dateEnd: 20241212
  omitProxy: false
  ssIdentifier: ssj0002315
  issn: 0144-3577
  databaseCode: M2O
  dateStart: 19940101
  isFulltext: true
  titleUrlDefault: https://search.proquest.com/pqrl
  providerName: ProQuest
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV3dT9swED8NmBB7AMZAKyuVH3hisrDjJG54QQOBxkZLNYpgT5HtOFAJtR1tJ8Ffj891-BLihRcrURwp0u9yH7673wFscl4KVfiCp1RQ598a6nYqGhsXPNvUxnHhSVyPZbvdvLjIOuHAbRTKKiud6BV1MTB4Rr7tTLMTPebs8-7wH8WpUZhdDSM0ZmAOWRK4L907fdDEUZhg4IIGKhIpq6YZ1tw--nXSaWHeP8L4CZ34Z4bpRXfuo4b2Zudw6b0fvAyLweEkP6YS8hk-2P4KzFf17ivw6Qkj4Re4_K16d7ZPPK8TGU67CMi08_J2h4x9ke2IKDK8cuaPog0syORpgwwZlAQ5kGl4ifi-ERIG11An6niEsQpnhwfd_Z80zGKgRqR8TGPlfDNtuVQsMzbTEWbvZSKtSTCzlia85MykrDBCa1UmUliVCWNiHRWZ5kaswWx_0LdfgWieaqOlc01iHVtRKlkgD2yRJoZxd1kDXgGRm0BUjvMyrnMfsLBm7sHLWZYjeDmCV4PvD-8MpzQdb-7eCvi-vvmZXNSgXuGbh_97lD-Cu_7242-wEGEVDJLoZnWYHd9M7AZ8NP_HvdFNA2bk-d8GzO0dtDt_3F2L7fu1i2t00vDi7NZuq3sPuaH1_g
linkProvider ProQuest
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1LT9wwEB5RqPo40BZadQsUH9pLKws7duJNpQohHmK7y5YDlbgZ23EAqdrdsksR_Ch-Ix4n4VFV3DhwixTbUuJvXvbMNwCfOC-FKWLCUyZo8G8dDSMNlS4Ezz7zUhaRxLWn-v32_n6-OwWXTS0MplU2OjEq6mLo8Ix8JZjmAD0W7PPq6A_FrlF4u9q00Khg0fXnZyFkG3_vbIT9_ZwkW5t769u07ipAncj4hEoTvAzruTIsdz63Cd5Dq1R5l-IdUZbykjOXscIJa02ZKuFNLpyTNilyy50I6z6BGSmDeGCqIFu_1vxJ3TEhBClUpEo1RTqsvdL58XN3B_MMEozXMGi4Ywj_qQa-sQjRzG29emw_6DXM1g41Wask4A1M-cEcPGvy-efg5S3GxXk47JrjCz8gkbeKjKoqCVJVlp5_I5OYRDwmhoyOgnmnaOMLcnq7AIgMS4Icz7SeRGJdDKkb89AgynhE8xZ-PchHv4PpwXDg3wOxPLPOquB6SSu9KI0qkOe2yFLHeHhsAW82XruaiB37gfzWMSBjbR3BolmuESwawdKCr9dzRhUNyb2jv9R4-v_gOzhswWKDJ13rr7G-AdOH-18vw_PtvZ2e7nX63QV4kWDGDxIG54swPTk59Uvw1P2dHI9PPkZRIXDw0NC7AhfTTGI
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1Nb9QwEB2Vgio48FFALBTwAS4ga-04iTdICKGWFcuWZQ8g9WZsx4FKaHfpbkHlp_HrmHGcfiDUWw_cIsWOlOTZz2O_eQPwRMpG2ToKnkrFcX3rOba0PPcYPIcy5HkdTVx39WQy2Nurpmvwu8uFIVllNyfGibqee9oj7yM1I_QE8nO_SbKI6c7w1eI7pwpSdNLaldNoITIORz8xfFu-HO3gv36aZcM3H7ff8lRhgHtVyhXPLa44XJDaisqHymV0Jq0LHXxB50VlIRspfClqr5yzTaFVsJXyPndZXTnpFT73ElzWOdImyQbF9jELZKl6AgYsXBVadwk7YtAfvfswfU-ag4xiNwogzpDiX5nBJ-wQKW9443_-WDfhelpos9ftyLgFa2G2CRudzn8Trp1yYrwNX8Z2_1eYsehnxRZt9gRrM06PXrBVFBcvmWWLr0j7nLi_ZoenE4PYvGHk_cxTJxbzZVgq2MNxiNPWzR34dCEvfRfWZ_NZuAfMydJ5p3FJlrs8qMbqmvxv67LwQuJlD2QHAuOTQTvVCflmYqAmBiYCx4jKEHAMAacHz4_7LFp7knNbP0vY-nfjM5jswVaHLZPmtaU5Adb9828_hg1EnNkdTcYP4GpGQiDyEa62YH11cBgewhX_Y7W_PHgURw2DzxeNvD_itVUo
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Kaizen+event+process+quality%3A+towards+a+phase-based+understanding+of+high-quality+group+problem-solving&rft.jtitle=International+journal+of+operations+%26+production+management&rft.au=Franken%2C+Jos%C3%A9+CM&rft.au=van+Dun%2C+Desir%C3%A9e+H&rft.au=Celeste+PM+Wilderom&rft.date=2021-08-19&rft.pub=Emerald+Group+Publishing+Limited&rft.issn=0144-3577&rft.eissn=1758-6593&rft.volume=41&rft.issue=6&rft.spage=962&rft.epage=990&rft_id=info:doi/10.1108%2FIJOPM-09-2020-0666&rft.externalDBID=HAS_PDF_LINK
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0144-3577&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0144-3577&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0144-3577&client=summon