Xuan, H., Li, B., & Zhang, H. (2019). An Improved Discrete Artificial Bee Colony Algorithm for Flexible Flowshop Scheduling with Step Deteriorating Jobs and Sequence-Dependent Setup Times. Mathematical problems in engineering, 2019(2019), 1-13. https://doi.org/10.1155/2019/8520503
Chicago Style (17th ed.) CitationXuan, Hua, Bing Li, and Huixian Zhang. "An Improved Discrete Artificial Bee Colony Algorithm for Flexible Flowshop Scheduling with Step Deteriorating Jobs and Sequence-Dependent Setup Times." Mathematical Problems in Engineering 2019, no. 2019 (2019): 1-13. https://doi.org/10.1155/2019/8520503.
MLA (9th ed.) CitationXuan, Hua, et al. "An Improved Discrete Artificial Bee Colony Algorithm for Flexible Flowshop Scheduling with Step Deteriorating Jobs and Sequence-Dependent Setup Times." Mathematical Problems in Engineering, vol. 2019, no. 2019, 2019, pp. 1-13, https://doi.org/10.1155/2019/8520503.