Bidding Strategy of Virtual Power Plant for Participating in Energy and Spinning Reserve Markets-Part I: Problem Formulation

This paper addresses the bidding problem faced by a virtual power plant (VPP) in a joint market of energy and spinning reserve service. The proposed bidding strategy is a non-equilibrium model based on the deterministic price-based unit commitment (PBUC) which takes the supply-demand balancing const...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:IEEE transactions on power systems Ročník 26; číslo 2; s. 949 - 956
Hlavní autoři: Mashhour, E, Moghaddas-Tafreshi, S M
Médium: Journal Article
Jazyk:angličtina
Vydáno: New York IEEE 01.05.2011
The Institute of Electrical and Electronics Engineers, Inc. (IEEE)
Témata:
ISSN:0885-8950, 1558-0679
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:This paper addresses the bidding problem faced by a virtual power plant (VPP) in a joint market of energy and spinning reserve service. The proposed bidding strategy is a non-equilibrium model based on the deterministic price-based unit commitment (PBUC) which takes the supply-demand balancing constraint and security constraints of VPP itself into account. The presented model creates a single operating profile from a composite of the parameters characterizing each distributed energy resources (DER), which is a component of VPP, and incorporates network constraints into its description of the capabilities of the portfolio. The presented model is a nonlinear mixed-integer programming with inter-temporal constraints and solved by genetic algorithm (GA).
Bibliografie:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0885-8950
1558-0679