A method to construct a main hole structural plane model based on advanced parallel adit geological body

The advanced parallel adit of tunnel refers to the adit parallel to the direction of the main hole. Generally it is spaced tens of meters from the axis of the positive hole. During the tunnel construction, the parallel adit is driven before the main hole. Main function of it is to provide geological...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:IOP conference series. Earth and environmental science Ročník 1337; číslo 1; s. 12033 - 12041
Hlavní autori: Zhang, Shuainan, Wu, Wei, Zhang, Min, Huang, Yong, Fu, Wei
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Bristol IOP Publishing 01.05.2024
Predmet:
ISSN:1755-1307, 1755-1315
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Buďte prvý, kto okomentuje tento záznam!
Najprv sa musíte prihlásiť.