Liao, S., Liu, J., Liu, B., Cheng, C., Zhou, L., & Wu, H. (2020). Multicore Parallel Dynamic Programming Algorithm for Short-Term Hydro-Unit Load Dispatching of Huge Hydropower Stations Serving Multiple Power Grids. Water resources management, 34(1), 359-376. https://doi.org/10.1007/s11269-019-02455-w
Citácia podle Chicago (17th ed.)Liao, Shengli, Jie Liu, Benxi Liu, Chuntian Cheng, Lingan Zhou, a Huijun Wu. "Multicore Parallel Dynamic Programming Algorithm for Short-Term Hydro-Unit Load Dispatching of Huge Hydropower Stations Serving Multiple Power Grids." Water Resources Management 34, no. 1 (2020): 359-376. https://doi.org/10.1007/s11269-019-02455-w.
Citácia podľa MLA (8th ed.)Liao, Shengli, et al. "Multicore Parallel Dynamic Programming Algorithm for Short-Term Hydro-Unit Load Dispatching of Huge Hydropower Stations Serving Multiple Power Grids." Water Resources Management, vol. 34, no. 1, 2020, pp. 359-376, https://doi.org/10.1007/s11269-019-02455-w.