Outsourcing and rescheduling for a two-machine flow shop with the disruption of new arriving jobs: A hybrid variable neighborhood search algorithm

•The two-machine flow shop outsourcing and rescheduling problem against the disruption of new arriving jobs is addressed.•A hybrid variable neighborhood search (HVNS) algorithm is developed for solving this problem.•Two constructive heuristics are designed to generate the initial solutions for the H...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Computers & industrial engineering Ročník 130; s. 198 - 221
Hlavný autor: Liu, Le
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Elsevier Ltd 01.04.2019
Predmet:
ISSN:0360-8352, 1879-0550
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract •The two-machine flow shop outsourcing and rescheduling problem against the disruption of new arriving jobs is addressed.•A hybrid variable neighborhood search (HVNS) algorithm is developed for solving this problem.•Two constructive heuristics are designed to generate the initial solutions for the HVNS.•Extensive computational results and comparisons confirm the effectiveness of the calibrated HVNS. This paper addresses the two-machine flow shop outsourcing and rescheduling problem (TFSORP) in response to an unexpected arrival of new jobs, in which each job can be processed in the in-house shop or outsourced to a single subcontractor. An efficient schedule is constructed for the in-house jobs, and its performance is measured by the makespan. Each of the outsourced jobs requires paying an outsourcing cost. The objective is to minimize the sum of the in-house makespan and total outsourcing cost, subject to a limit on the number of original jobs processed by the subcontractor after disruption. To solve this NP-hard problem, a mixed integer programming formulation and helpful optimization properties are first established, and then a hybrid variable neighborhood search algorithm (HVNS) that incorporates one-dimensional array representation and three problem-specific neighborhood structures is developed. At the initialization stage, either of two well-designed constructive heuristics, i.e., job addition heuristic (JAH) and job removal heuristic (JRH) is employed. At the iterative search stage, an adaptive best-improvement procedure based on three neighborhood structures is devised to play the role of local search. An extensive experimental calibration for main factors in HVNS is carried out by a full-factorial design of experiments. To validate the calibrated HVNS, computational experiments are conducted upon the test suite of various instances. As demonstrated in the results, the calibrated HVNS gains the advantage over both the commercial optimizer and exhaustive approach in terms of computation time for small-sized instances, while it also outperforms an existing meta-heuristic algorithm and two canonical ones (based on the principles of genetic algorithm and simulated annealing) in the optimizing capability.
AbstractList •The two-machine flow shop outsourcing and rescheduling problem against the disruption of new arriving jobs is addressed.•A hybrid variable neighborhood search (HVNS) algorithm is developed for solving this problem.•Two constructive heuristics are designed to generate the initial solutions for the HVNS.•Extensive computational results and comparisons confirm the effectiveness of the calibrated HVNS. This paper addresses the two-machine flow shop outsourcing and rescheduling problem (TFSORP) in response to an unexpected arrival of new jobs, in which each job can be processed in the in-house shop or outsourced to a single subcontractor. An efficient schedule is constructed for the in-house jobs, and its performance is measured by the makespan. Each of the outsourced jobs requires paying an outsourcing cost. The objective is to minimize the sum of the in-house makespan and total outsourcing cost, subject to a limit on the number of original jobs processed by the subcontractor after disruption. To solve this NP-hard problem, a mixed integer programming formulation and helpful optimization properties are first established, and then a hybrid variable neighborhood search algorithm (HVNS) that incorporates one-dimensional array representation and three problem-specific neighborhood structures is developed. At the initialization stage, either of two well-designed constructive heuristics, i.e., job addition heuristic (JAH) and job removal heuristic (JRH) is employed. At the iterative search stage, an adaptive best-improvement procedure based on three neighborhood structures is devised to play the role of local search. An extensive experimental calibration for main factors in HVNS is carried out by a full-factorial design of experiments. To validate the calibrated HVNS, computational experiments are conducted upon the test suite of various instances. As demonstrated in the results, the calibrated HVNS gains the advantage over both the commercial optimizer and exhaustive approach in terms of computation time for small-sized instances, while it also outperforms an existing meta-heuristic algorithm and two canonical ones (based on the principles of genetic algorithm and simulated annealing) in the optimizing capability.
Author Liu, Le
Author_xml – sequence: 1
  givenname: Le
  surname: Liu
  fullname: Liu, Le
  email: sm_liul@ujn.edu.cn
  organization: Business School, University of Jinan, Jinan 250022, People’s Republic of China
BookMark eNp9kMFqGzEURUVJIU7aD8hOPzDTp5Fla9pVCG1TCGTTroVGerJkxiPzJNvkN_rFnSFdZZHVg8c9F-65YVdTnpCxOwGtALH5sm9dwrYD0bfQtSDUB7YSets3oBRcsRXIDTRaqu6a3ZSyB4C16sWK_X0-1ZJP5NK043bynLC4iP40Lo-QiVteL7k5WBfThDyM-cJLzEd-STXyGpH7VOh0rClPPAc-4YVbonRe-H0eyld-z-PLQMnzs6VkhxHnUNrFIVPM2fOCllzkdtxlmjsPn9jHYMeCn__fW_bnx_ffD4_N0_PPXw_3T42TCmpje_QSpFVaDE4ppdd9wDUMKL32ahBy0JugrQbX-xD81nZbkN5qb8Nay00nb5l47XWUSyEM5kjpYOnFCDCLVLM3s1SzSDXQmVnqzGzfMC5Vu2yvZNP4LvntlcR50jkhmTJHJoc-EbpqfE7v0P8A1iqXwg
CitedBy_id crossref_primary_10_1016_j_ijpe_2024_109163
crossref_primary_10_1080_0305215X_2024_2366486
crossref_primary_10_3233_JIFS_224624
crossref_primary_10_3389_fmech_2021_646507
crossref_primary_10_1016_j_cie_2022_108387
crossref_primary_10_1016_j_eswa_2024_123983
crossref_primary_10_1007_s11518_021_5490_8
crossref_primary_10_1016_j_cie_2023_109317
crossref_primary_10_1016_j_cirpj_2025_04_006
crossref_primary_10_1016_j_ijpe_2020_107669
crossref_primary_10_1007_s11424_024_3284_z
crossref_primary_10_1016_j_cor_2022_105815
crossref_primary_10_1016_j_eswa_2022_118711
crossref_primary_10_1016_j_cor_2024_106757
crossref_primary_10_1016_j_cie_2020_106527
crossref_primary_10_1080_00207543_2023_2245919
crossref_primary_10_1080_00207543_2020_1766721
crossref_primary_10_1080_01605682_2023_2197000
crossref_primary_10_1016_j_jclepro_2024_142916
crossref_primary_10_1007_s00170_021_08104_0
crossref_primary_10_1016_j_cie_2023_109420
crossref_primary_10_1109_TASE_2021_3115821
crossref_primary_10_1016_j_cie_2025_111517
crossref_primary_10_1016_j_eswa_2025_128167
Cites_doi 10.1016/j.ejor.2011.03.037
10.1007/s10845-013-0811-5
10.1016/j.jmsy.2011.02.004
10.1016/j.ins.2012.11.007
10.1080/00207543.2013.855338
10.1287/opre.1030.0101
10.1080/07408170801975057
10.1016/S0305-0548(97)00031-2
10.1080/00207543.2011.627687
10.1016/j.cie.2014.11.024
10.1016/j.endm.2012.10.015
10.1515/jisys-2016-0016
10.1287/ijoc.1060.0209
10.1080/00207549308956824
10.1016/j.ejor.2007.02.015
10.1080/0305215X.2017.1325483
10.1007/s13675-016-0075-x
10.1287/msom.1070.0152
10.1016/j.cor.2010.11.010
10.1002/nav.3800010110
10.1023/A:1022235519958
10.1007/s10951-008-0090-8
10.1007/s10845-010-0464-6
10.1016/S0167-5060(08)70356-X
10.1080/00207543.2013.848488
10.1109/TASE.2006.887159
10.1109/4235.585893
10.1142/S0217595914500286
10.1016/j.ijpe.2010.08.011
10.1016/j.jcde.2016.08.001
10.1007/s11518-009-5094-1
10.1016/j.cor.2011.08.022
10.1080/00207543.2014.899719
10.1007/s10878-011-9442-y
10.1016/j.ejor.2011.03.017
10.1016/j.ejor.2015.12.046
10.1016/j.cie.2010.07.001
10.1016/j.ejor.2012.10.048
10.1016/j.ijpe.2007.02.036
10.1080/00207543.2015.1088970
10.1016/j.asoc.2014.07.005
10.1016/j.cor.2012.12.003
ContentType Journal Article
Copyright 2019 Elsevier Ltd
Copyright_xml – notice: 2019 Elsevier Ltd
DBID AAYXX
CITATION
DOI 10.1016/j.cie.2019.02.015
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Applied Sciences
Engineering
EISSN 1879-0550
EndPage 221
ExternalDocumentID 10_1016_j_cie_2019_02_015
S0360835219300890
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
29F
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAFWJ
AAIAV
AAIKC
AAIKJ
AAKOC
AALRI
AAMNW
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
ABAOU
ABMAC
ABUCO
ABXDB
ABYKQ
ACAZW
ACDAQ
ACGFO
ACGFS
ACNCT
ACNNM
ACRLP
ADBBV
ADEZE
ADGUI
ADMUD
ADRHT
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIGVJ
AIKHN
AITUG
AJBFU
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ARUGR
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BKOMP
BLXMC
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
G8K
GBLVA
HAMUX
HLZ
HVGLF
HZ~
H~9
IHE
J1W
JJJVA
KOM
LX9
LY1
LY7
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
RNS
ROL
RPZ
RXW
SBC
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SST
SSW
SSZ
T5K
TAE
TN5
WUQ
XPP
ZMT
~G-
9DU
AATTM
AAXKI
AAYWO
AAYXX
ABDPE
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
ID FETCH-LOGICAL-c350t-a9ed303a581bc555849fe40be3d8d5b13b86f8a80c9dffd7a2703da8daf483623
ISICitedReferencesCount 28
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000466825100015&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0360-8352
IngestDate Sat Nov 29 07:20:35 EST 2025
Tue Nov 18 22:28:08 EST 2025
Fri Feb 23 02:29:10 EST 2024
IsPeerReviewed true
IsScholarly true
Keywords Rescheduling
Outsourcing
Variable neighborhood search
Two-machine flow shop
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c350t-a9ed303a581bc555849fe40be3d8d5b13b86f8a80c9dffd7a2703da8daf483623
PageCount 24
ParticipantIDs crossref_primary_10_1016_j_cie_2019_02_015
crossref_citationtrail_10_1016_j_cie_2019_02_015
elsevier_sciencedirect_doi_10_1016_j_cie_2019_02_015
PublicationCentury 2000
PublicationDate 2019-04-01
PublicationDateYYYYMMDD 2019-04-01
PublicationDate_xml – month: 04
  year: 2019
  text: 2019-04-01
  day: 01
PublicationDecade 2010
PublicationTitle Computers & industrial engineering
PublicationYear 2019
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Dolgui, Proth (b0060) 2013; 51
Bo, Zhang, Pan (b0020) 2015; 24
Rocha, Gomez, Mateus, Pardalos (b0210) 2007; 18
Mladenovic, Hansen (b0160) 1997; 24
Liu, Zhou (b0150) 2013; 226
Chen, Tang (b0035) 2014; 43
Chen, Li (b0030) 2008; 40
Choi, Chung (b0040) 2011; 213
M’Hallah (b0155) 2014; 52
Yazdani, Khalili, Babagolzadeh, Jolai (b0225) 2017; 4
Lee, Choi (b0105) 2011; 213
Hall, Liu, Potts (b0080) 2007; 19
Qi (b0200) 2009; 18
Qi (b0205) 2011; 129
Vieira, Herrmann, Lin (b0215) 2003; 6
Bukchin, Hanany (b0025) 2007; 9
Lei, Guo (b0125) 2016; 54
Kirlik, Oguz (b0100) 2012; 39
Mokhtari, Abadi, Amin-Naseri (b0175) 2012; 50
Johnson (b0095) 1954; 1
Mokhtari (b0165) 2016; 31
Qi (b0195) 2008; 5
Li, Pan, Wang (b0130) 2014; 24
Choi, Chung (b0045) 2016; 252
Hall, Potts (b0085) 2004; 52
Graham, Lawler, Lenstra, Kan (b0070) 1979; 5
Bagheri, Zandieh (b0010) 2011; 30
Wolpert, Macready (b0220) 1997; 1
Neto, Godinho Filho (b0180) 2011; 38
Lee, Sung (b0110) 2008; 111
Lee, Sung (b0115) 2008; 186
Lei (b0120) 2015; 80
Ouelhadj, Petrovic (b0190) 2009; 12
Hansen, Mladenovic, Todosijevic, Hanafi (b0090) 2017; 5
Zhong, Huo (b0235) 2013; 26
Bilyk, Monch (b0015) 2012; 23
Li, Shyu, Adiga (b0135) 1993; 31
Ahmadizar, Amiri (b0005) 2018; 50
Driessel, Monch (b0065) 2011; 61
Liu, Zhou (b0145) 2012; 39
Zar (b0230) 1999
Liu, Yi, Wen, Song (b0140) 2017; 26
Chung, Choi (b0055) 2013; 226
Guo, Lei (b0075) 2014; 52
Neto, Godinho Filho, Da Silva (b0185) 2015; 20
Choi, Park (b0050) 2014; 31
Mokhtari, Abadi (b0170) 2013; 40
Ahmadizar (10.1016/j.cie.2019.02.015_b0005) 2018; 50
Hall (10.1016/j.cie.2019.02.015_b0085) 2004; 52
Qi (10.1016/j.cie.2019.02.015_b0195) 2008; 5
Qi (10.1016/j.cie.2019.02.015_b0205) 2011; 129
Bukchin (10.1016/j.cie.2019.02.015_b0025) 2007; 9
Lei (10.1016/j.cie.2019.02.015_b0120) 2015; 80
Ouelhadj (10.1016/j.cie.2019.02.015_b0190) 2009; 12
Wolpert (10.1016/j.cie.2019.02.015_b0220) 1997; 1
Lee (10.1016/j.cie.2019.02.015_b0105) 2011; 213
Bilyk (10.1016/j.cie.2019.02.015_b0015) 2012; 23
Chen (10.1016/j.cie.2019.02.015_b0030) 2008; 40
Choi (10.1016/j.cie.2019.02.015_b0050) 2014; 31
Mokhtari (10.1016/j.cie.2019.02.015_b0175) 2012; 50
Hansen (10.1016/j.cie.2019.02.015_b0090) 2017; 5
Mokhtari (10.1016/j.cie.2019.02.015_b0165) 2016; 31
Choi (10.1016/j.cie.2019.02.015_b0040) 2011; 213
Neto (10.1016/j.cie.2019.02.015_b0180) 2011; 38
Yazdani (10.1016/j.cie.2019.02.015_b0225) 2017; 4
Dolgui (10.1016/j.cie.2019.02.015_b0060) 2013; 51
Guo (10.1016/j.cie.2019.02.015_b0075) 2014; 52
Zhong (10.1016/j.cie.2019.02.015_b0235) 2013; 26
Kirlik (10.1016/j.cie.2019.02.015_b0100) 2012; 39
Li (10.1016/j.cie.2019.02.015_b0135) 1993; 31
Lee (10.1016/j.cie.2019.02.015_b0110) 2008; 111
Mokhtari (10.1016/j.cie.2019.02.015_b0170) 2013; 40
Zar (10.1016/j.cie.2019.02.015_b0230) 1999
Chen (10.1016/j.cie.2019.02.015_b0035) 2014; 43
Lee (10.1016/j.cie.2019.02.015_b0115) 2008; 186
Li (10.1016/j.cie.2019.02.015_b0130) 2014; 24
Neto (10.1016/j.cie.2019.02.015_b0185) 2015; 20
Choi (10.1016/j.cie.2019.02.015_b0045) 2016; 252
Liu (10.1016/j.cie.2019.02.015_b0140) 2017; 26
Chung (10.1016/j.cie.2019.02.015_b0055) 2013; 226
Hall (10.1016/j.cie.2019.02.015_b0080) 2007; 19
Bagheri (10.1016/j.cie.2019.02.015_b0010) 2011; 30
Vieira (10.1016/j.cie.2019.02.015_b0215) 2003; 6
Liu (10.1016/j.cie.2019.02.015_b0150) 2013; 226
Qi (10.1016/j.cie.2019.02.015_b0200) 2009; 18
Johnson (10.1016/j.cie.2019.02.015_b0095) 1954; 1
Liu (10.1016/j.cie.2019.02.015_b0145) 2012; 39
Driessel (10.1016/j.cie.2019.02.015_b0065) 2011; 61
Bo (10.1016/j.cie.2019.02.015_b0020) 2015; 24
M’Hallah (10.1016/j.cie.2019.02.015_b0155) 2014; 52
Graham (10.1016/j.cie.2019.02.015_b0070) 1979; 5
Mladenovic (10.1016/j.cie.2019.02.015_b0160) 1997; 24
Rocha (10.1016/j.cie.2019.02.015_b0210) 2007; 18
Lei (10.1016/j.cie.2019.02.015_b0125) 2016; 54
References_xml – volume: 40
  start-page: 1234
  year: 2013
  end-page: 1242
  ident: b0170
  article-title: Scheduling with an outsourcing option on both manufacturer and subcontractors
  publication-title: Computers & Operations Research
– volume: 38
  start-page: 1286
  year: 2011
  end-page: 1293
  ident: b0180
  article-title: An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
  publication-title: Computers & Operations Research
– volume: 213
  start-page: 66
  year: 2011
  end-page: 72
  ident: b0040
  article-title: Two-machine flow shop scheduling problem with an outsourcing option
  publication-title: European Journal of Operational Research
– volume: 52
  start-page: 440
  year: 2004
  end-page: 453
  ident: b0085
  article-title: Rescheduling for new orders
  publication-title: Operations Research
– volume: 1
  start-page: 61
  year: 1954
  end-page: 68
  ident: b0095
  article-title: Optimal two- and three-stage production schedules with setup times included
  publication-title: Naval Research Logistics Quarterly
– volume: 111
  start-page: 623
  year: 2008
  end-page: 634
  ident: b0110
  article-title: Single machine scheduling with outsourcing allowed
  publication-title: International Journal of Production Economics
– volume: 26
  start-page: 683
  year: 2017
  end-page: 695
  ident: b0140
  article-title: Disruption management for predictable new job arrivals in cloud manufacturing
  publication-title: Journal of Intelligent Systems
– volume: 24
  start-page: 63
  year: 2014
  end-page: 77
  ident: b0130
  article-title: A hybrid variable neighborhood search for solving the hybrid flow shop scheduling problem
  publication-title: Applied Soft Computing
– volume: 213
  start-page: 489
  year: 2011
  end-page: 497
  ident: b0105
  article-title: Two-stage production scheduling with an outsourcing option
  publication-title: European Journal of Operational Research
– volume: 52
  start-page: 3832
  year: 2014
  end-page: 3841
  ident: b0075
  article-title: Bi-objective job shop scheduling with outsourcing options
  publication-title: International Journal of Production Research
– volume: 12
  start-page: 417
  year: 2009
  end-page: 431
  ident: b0190
  article-title: A survey of dynamic scheduling in manufacturing systems
  publication-title: Journal of Scheduling
– volume: 50
  start-page: 483
  year: 2018
  end-page: 498
  ident: b0005
  article-title: Outsourcing and scheduling for a two-machine flow shop with release times
  publication-title: Engineering Optimization
– volume: 5
  start-page: 188
  year: 2008
  end-page: 192
  ident: b0195
  article-title: Coordinated logistics scheduling for in-house production and outsourcing
  publication-title: IEEE Transactions on Automation Science and Engineering
– volume: 6
  start-page: 39
  year: 2003
  end-page: 62
  ident: b0215
  article-title: Rescheduling manufacturing systems: A framework of strategies, policies, and methods
  publication-title: Journal of Scheduling
– volume: 54
  start-page: 4793
  year: 2016
  end-page: 4804
  ident: b0125
  article-title: A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
  publication-title: International Journal of Production Research
– volume: 40
  start-page: 1171
  year: 2008
  end-page: 1184
  ident: b0030
  article-title: Scheduling with subcontracting options
  publication-title: IIE Transactions
– volume: 226
  start-page: 46
  year: 2013
  end-page: 52
  ident: b0055
  article-title: Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
  publication-title: European Journal of Operational Research
– volume: 9
  start-page: 263
  year: 2007
  end-page: 275
  ident: b0025
  article-title: Decentralization cost in scheduling: A game-theoretic approach
  publication-title: Manufacturing and Service Operations Management
– volume: 24
  start-page: 1097
  year: 1997
  end-page: 1100
  ident: b0160
  article-title: Variable neighborhood search
  publication-title: Computers & Operations Research
– volume: 31
  start-page: 1815
  year: 1993
  end-page: 1826
  ident: b0135
  article-title: A heuristic rescheduling algorithm for computer-based production scheduling systems
  publication-title: International Journal of Production Research
– volume: 5
  start-page: 423
  year: 2017
  end-page: 454
  ident: b0090
  article-title: Variable neighborhood search: Basics and variants
  publication-title: EURO Journal on Computational Optimization
– volume: 5
  start-page: 287
  year: 1979
  end-page: 326
  ident: b0070
  article-title: Optimization and approximation in deterministic machine scheduling: A survey
  publication-title: Annals of Discrete Mathematics
– volume: 80
  start-page: 125
  year: 2015
  end-page: 131
  ident: b0120
  article-title: Variable neighborhood search for two-agent flow shop scheduling problem
  publication-title: Computers & Industrial Engineering
– volume: 24
  start-page: 485
  year: 2015
  end-page: 495
  ident: b0020
  article-title: A disruption recovery model for no-wait flow shop with outsourcing option
  publication-title: Journal of Systems and Management
– volume: 31
  start-page: 487
  year: 2016
  end-page: 501
  ident: b0165
  article-title: Manufacturing operations outsourcing through an artificial team process algorithm
  publication-title: Journal of Intelligent and Fuzzy Systems
– volume: 26
  start-page: 489
  year: 2013
  end-page: 498
  ident: b0235
  article-title: Single machine scheduling problems with subcontracting options
  publication-title: Journal of Combinatorial Optimization
– volume: 43
  start-page: 887
  year: 2014
  end-page: 894
  ident: b0035
  article-title: Two-machine open-shop scheduling with outsourcing
  publication-title: Advances in Mathematics (China)
– volume: 31
  start-page: 1450028
  year: 2014
  ident: b0050
  article-title: Outsourcing decisions in
  publication-title: Asia-Pacific Journal of Operational Research
– volume: 18
  start-page: 1
  year: 2009
  end-page: 15
  ident: b0200
  article-title: Two-stage production scheduling with an option of outsourcing from a remote supplier
  publication-title: Journal of Systems Science and Systems Engineering
– volume: 61
  start-page: 336
  year: 2011
  end-page: 345
  ident: b0065
  article-title: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
  publication-title: Computers & Industrial Engineering
– volume: 1
  start-page: 67
  year: 1997
  end-page: 82
  ident: b0220
  article-title: No free lunch theorems for optimization
  publication-title: IEEE Transactions on Evolutionary Computation
– year: 1999
  ident: b0230
  article-title: Biostatistical analysis
– volume: 18
  start-page: 101
  year: 2007
  end-page: 105
  ident: b0210
  article-title: Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighborhood search
  publication-title: IMA Journal of Management Mathematics
– volume: 23
  start-page: 1621
  year: 2012
  end-page: 1635
  ident: b0015
  article-title: A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines
  publication-title: Journal of Intelligent Manufacturing
– volume: 39
  start-page: 1506
  year: 2012
  end-page: 1520
  ident: b0100
  article-title: A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine
  publication-title: Computers & Operations Research
– volume: 252
  start-page: 367
  year: 2016
  end-page: 375
  ident: b0045
  article-title: Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty
  publication-title: European Journal of Operational Research
– volume: 52
  start-page: 3802
  year: 2014
  end-page: 3819
  ident: b0155
  article-title: An iterated local search variable neighborhood descent hybrid heuristic for the total earliness tardiness permutation flow shop
  publication-title: International Journal of Production Research
– volume: 50
  start-page: 5372
  year: 2012
  end-page: 5395
  ident: b0175
  article-title: Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure
  publication-title: International Journal of Production Research
– volume: 129
  start-page: 43
  year: 2011
  end-page: 50
  ident: b0205
  article-title: Outsourcing and production scheduling for a two-stage flow shop
  publication-title: International Journal of Production Economics
– volume: 51
  start-page: 6769
  year: 2013
  end-page: 6777
  ident: b0060
  article-title: Outsourcing: Definitions and analysis
  publication-title: International Journal of Production Research
– volume: 186
  start-page: 931
  year: 2008
  end-page: 952
  ident: b0115
  article-title: Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
  publication-title: European Journal of Operational Research
– volume: 39
  start-page: 107
  year: 2012
  end-page: 114
  ident: b0145
  article-title: Applying variable neighborhood search to the single-machine maximum lateness rescheduling problem
  publication-title: Electronic Notes in Discrete Mathematics
– volume: 20
  start-page: 527
  year: 2015
  end-page: 538
  ident: b0185
  article-title: An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
  publication-title: Journal of Intelligent Manufacturing
– volume: 30
  start-page: 8
  year: 2011
  end-page: 15
  ident: b0010
  article-title: Bi-criteria flexible job-shop scheduling with sequence-dependent setup times−Variable neighborhood search approach
  publication-title: Journal of Manufacturing Systems
– volume: 19
  start-page: 633
  year: 2007
  end-page: 645
  ident: b0080
  article-title: Rescheduling for multiple new orders
  publication-title: INFORMS Journal on Computing
– volume: 4
  start-page: 46
  year: 2017
  end-page: 59
  ident: b0225
  article-title: A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach
  publication-title: Journal of Computational Design and Engineering
– volume: 226
  start-page: 68
  year: 2013
  end-page: 92
  ident: b0150
  article-title: Hybridization of harmony search with variable neighborhood search for restrictive single-machine earliness/tardiness problem
  publication-title: Information Sciences
– volume: 24
  start-page: 485
  issue: 4
  year: 2015
  ident: 10.1016/j.cie.2019.02.015_b0020
  article-title: A disruption recovery model for no-wait flow shop with outsourcing option
  publication-title: Journal of Systems and Management
– volume: 213
  start-page: 489
  issue: 3
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0105
  article-title: Two-stage production scheduling with an outsourcing option
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2011.03.037
– volume: 20
  start-page: 527
  issue: 3
  year: 2015
  ident: 10.1016/j.cie.2019.02.015_b0185
  article-title: An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed
  publication-title: Journal of Intelligent Manufacturing
  doi: 10.1007/s10845-013-0811-5
– volume: 30
  start-page: 8
  issue: 1
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0010
  article-title: Bi-criteria flexible job-shop scheduling with sequence-dependent setup times−Variable neighborhood search approach
  publication-title: Journal of Manufacturing Systems
  doi: 10.1016/j.jmsy.2011.02.004
– volume: 226
  start-page: 68
  year: 2013
  ident: 10.1016/j.cie.2019.02.015_b0150
  article-title: Hybridization of harmony search with variable neighborhood search for restrictive single-machine earliness/tardiness problem
  publication-title: Information Sciences
  doi: 10.1016/j.ins.2012.11.007
– volume: 51
  start-page: 6769
  issue: 23–24
  year: 2013
  ident: 10.1016/j.cie.2019.02.015_b0060
  article-title: Outsourcing: Definitions and analysis
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2013.855338
– volume: 52
  start-page: 440
  issue: 3
  year: 2004
  ident: 10.1016/j.cie.2019.02.015_b0085
  article-title: Rescheduling for new orders
  publication-title: Operations Research
  doi: 10.1287/opre.1030.0101
– volume: 40
  start-page: 1171
  issue: 12
  year: 2008
  ident: 10.1016/j.cie.2019.02.015_b0030
  article-title: Scheduling with subcontracting options
  publication-title: IIE Transactions
  doi: 10.1080/07408170801975057
– volume: 24
  start-page: 1097
  issue: 11
  year: 1997
  ident: 10.1016/j.cie.2019.02.015_b0160
  article-title: Variable neighborhood search
  publication-title: Computers & Operations Research
  doi: 10.1016/S0305-0548(97)00031-2
– volume: 50
  start-page: 5372
  issue: 19
  year: 2012
  ident: 10.1016/j.cie.2019.02.015_b0175
  article-title: Production scheduling with outsourcing scenarios: A mixed integer programming and efficient solution procedure
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2011.627687
– year: 1999
  ident: 10.1016/j.cie.2019.02.015_b0230
– volume: 80
  start-page: 125
  year: 2015
  ident: 10.1016/j.cie.2019.02.015_b0120
  article-title: Variable neighborhood search for two-agent flow shop scheduling problem
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2014.11.024
– volume: 39
  start-page: 107
  year: 2012
  ident: 10.1016/j.cie.2019.02.015_b0145
  article-title: Applying variable neighborhood search to the single-machine maximum lateness rescheduling problem
  publication-title: Electronic Notes in Discrete Mathematics
  doi: 10.1016/j.endm.2012.10.015
– volume: 26
  start-page: 683
  issue: 4
  year: 2017
  ident: 10.1016/j.cie.2019.02.015_b0140
  article-title: Disruption management for predictable new job arrivals in cloud manufacturing
  publication-title: Journal of Intelligent Systems
  doi: 10.1515/jisys-2016-0016
– volume: 19
  start-page: 633
  issue: 4
  year: 2007
  ident: 10.1016/j.cie.2019.02.015_b0080
  article-title: Rescheduling for multiple new orders
  publication-title: INFORMS Journal on Computing
  doi: 10.1287/ijoc.1060.0209
– volume: 43
  start-page: 887
  issue: 6
  year: 2014
  ident: 10.1016/j.cie.2019.02.015_b0035
  article-title: Two-machine open-shop scheduling with outsourcing
  publication-title: Advances in Mathematics (China)
– volume: 31
  start-page: 1815
  issue: 8
  year: 1993
  ident: 10.1016/j.cie.2019.02.015_b0135
  article-title: A heuristic rescheduling algorithm for computer-based production scheduling systems
  publication-title: International Journal of Production Research
  doi: 10.1080/00207549308956824
– volume: 18
  start-page: 101
  issue: 2
  year: 2007
  ident: 10.1016/j.cie.2019.02.015_b0210
  article-title: Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighborhood search
  publication-title: IMA Journal of Management Mathematics
– volume: 186
  start-page: 931
  issue: 3
  year: 2008
  ident: 10.1016/j.cie.2019.02.015_b0115
  article-title: Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2007.02.015
– volume: 50
  start-page: 483
  issue: 3
  year: 2018
  ident: 10.1016/j.cie.2019.02.015_b0005
  article-title: Outsourcing and scheduling for a two-machine flow shop with release times
  publication-title: Engineering Optimization
  doi: 10.1080/0305215X.2017.1325483
– volume: 5
  start-page: 423
  issue: 3
  year: 2017
  ident: 10.1016/j.cie.2019.02.015_b0090
  article-title: Variable neighborhood search: Basics and variants
  publication-title: EURO Journal on Computational Optimization
  doi: 10.1007/s13675-016-0075-x
– volume: 9
  start-page: 263
  issue: 3
  year: 2007
  ident: 10.1016/j.cie.2019.02.015_b0025
  article-title: Decentralization cost in scheduling: A game-theoretic approach
  publication-title: Manufacturing and Service Operations Management
  doi: 10.1287/msom.1070.0152
– volume: 38
  start-page: 1286
  issue: 9
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0180
  article-title: An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2010.11.010
– volume: 1
  start-page: 61
  issue: 1
  year: 1954
  ident: 10.1016/j.cie.2019.02.015_b0095
  article-title: Optimal two- and three-stage production schedules with setup times included
  publication-title: Naval Research Logistics Quarterly
  doi: 10.1002/nav.3800010110
– volume: 6
  start-page: 39
  issue: 1
  year: 2003
  ident: 10.1016/j.cie.2019.02.015_b0215
  article-title: Rescheduling manufacturing systems: A framework of strategies, policies, and methods
  publication-title: Journal of Scheduling
  doi: 10.1023/A:1022235519958
– volume: 12
  start-page: 417
  issue: 4
  year: 2009
  ident: 10.1016/j.cie.2019.02.015_b0190
  article-title: A survey of dynamic scheduling in manufacturing systems
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-008-0090-8
– volume: 23
  start-page: 1621
  issue: 5
  year: 2012
  ident: 10.1016/j.cie.2019.02.015_b0015
  article-title: A variable neighborhood search approach for planning and scheduling of jobs on unrelated parallel machines
  publication-title: Journal of Intelligent Manufacturing
  doi: 10.1007/s10845-010-0464-6
– volume: 5
  start-page: 287
  year: 1979
  ident: 10.1016/j.cie.2019.02.015_b0070
  article-title: Optimization and approximation in deterministic machine scheduling: A survey
  publication-title: Annals of Discrete Mathematics
  doi: 10.1016/S0167-5060(08)70356-X
– volume: 52
  start-page: 3832
  issue: 13
  year: 2014
  ident: 10.1016/j.cie.2019.02.015_b0075
  article-title: Bi-objective job shop scheduling with outsourcing options
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2013.848488
– volume: 5
  start-page: 188
  issue: 1
  year: 2008
  ident: 10.1016/j.cie.2019.02.015_b0195
  article-title: Coordinated logistics scheduling for in-house production and outsourcing
  publication-title: IEEE Transactions on Automation Science and Engineering
  doi: 10.1109/TASE.2006.887159
– volume: 1
  start-page: 67
  issue: 1
  year: 1997
  ident: 10.1016/j.cie.2019.02.015_b0220
  article-title: No free lunch theorems for optimization
  publication-title: IEEE Transactions on Evolutionary Computation
  doi: 10.1109/4235.585893
– volume: 31
  start-page: 1450028
  issue: 4
  year: 2014
  ident: 10.1016/j.cie.2019.02.015_b0050
  article-title: Outsourcing decisions in m-machine permutation flow shop scheduling problems with machine-dependent processing times
  publication-title: Asia-Pacific Journal of Operational Research
  doi: 10.1142/S0217595914500286
– volume: 129
  start-page: 43
  issue: 1
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0205
  article-title: Outsourcing and production scheduling for a two-stage flow shop
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2010.08.011
– volume: 4
  start-page: 46
  issue: 1
  year: 2017
  ident: 10.1016/j.cie.2019.02.015_b0225
  article-title: A single-machine scheduling problem with multiple unavailability constraints: A mathematical model and an enhanced variable neighborhood search approach
  publication-title: Journal of Computational Design and Engineering
  doi: 10.1016/j.jcde.2016.08.001
– volume: 18
  start-page: 1
  issue: 1
  year: 2009
  ident: 10.1016/j.cie.2019.02.015_b0200
  article-title: Two-stage production scheduling with an option of outsourcing from a remote supplier
  publication-title: Journal of Systems Science and Systems Engineering
  doi: 10.1007/s11518-009-5094-1
– volume: 39
  start-page: 1506
  issue: 7
  year: 2012
  ident: 10.1016/j.cie.2019.02.015_b0100
  article-title: A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2011.08.022
– volume: 52
  start-page: 3802
  issue: 13
  year: 2014
  ident: 10.1016/j.cie.2019.02.015_b0155
  article-title: An iterated local search variable neighborhood descent hybrid heuristic for the total earliness tardiness permutation flow shop
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2014.899719
– volume: 26
  start-page: 489
  issue: 3
  year: 2013
  ident: 10.1016/j.cie.2019.02.015_b0235
  article-title: Single machine scheduling problems with subcontracting options
  publication-title: Journal of Combinatorial Optimization
  doi: 10.1007/s10878-011-9442-y
– volume: 213
  start-page: 66
  issue: 1
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0040
  article-title: Two-machine flow shop scheduling problem with an outsourcing option
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2011.03.017
– volume: 31
  start-page: 487
  issue: 1
  year: 2016
  ident: 10.1016/j.cie.2019.02.015_b0165
  article-title: Manufacturing operations outsourcing through an artificial team process algorithm
  publication-title: Journal of Intelligent and Fuzzy Systems
– volume: 252
  start-page: 367
  issue: 2
  year: 2016
  ident: 10.1016/j.cie.2019.02.015_b0045
  article-title: Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2015.12.046
– volume: 61
  start-page: 336
  issue: 2
  year: 2011
  ident: 10.1016/j.cie.2019.02.015_b0065
  article-title: Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2010.07.001
– volume: 226
  start-page: 46
  issue: 1
  year: 2013
  ident: 10.1016/j.cie.2019.02.015_b0055
  article-title: Outsourcing and scheduling for two-machine ordered flow shop scheduling problems
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2012.10.048
– volume: 111
  start-page: 623
  issue: 2
  year: 2008
  ident: 10.1016/j.cie.2019.02.015_b0110
  article-title: Single machine scheduling with outsourcing allowed
  publication-title: International Journal of Production Economics
  doi: 10.1016/j.ijpe.2007.02.036
– volume: 54
  start-page: 4793
  issue: 16
  year: 2016
  ident: 10.1016/j.cie.2019.02.015_b0125
  article-title: A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options
  publication-title: International Journal of Production Research
  doi: 10.1080/00207543.2015.1088970
– volume: 24
  start-page: 63
  year: 2014
  ident: 10.1016/j.cie.2019.02.015_b0130
  article-title: A hybrid variable neighborhood search for solving the hybrid flow shop scheduling problem
  publication-title: Applied Soft Computing
  doi: 10.1016/j.asoc.2014.07.005
– volume: 40
  start-page: 1234
  issue: 5
  year: 2013
  ident: 10.1016/j.cie.2019.02.015_b0170
  article-title: Scheduling with an outsourcing option on both manufacturer and subcontractors
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2012.12.003
SSID ssj0004591
Score 2.392198
Snippet •The two-machine flow shop outsourcing and rescheduling problem against the disruption of new arriving jobs is addressed.•A hybrid variable neighborhood search...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 198
SubjectTerms Outsourcing
Rescheduling
Two-machine flow shop
Variable neighborhood search
Title Outsourcing and rescheduling for a two-machine flow shop with the disruption of new arriving jobs: A hybrid variable neighborhood search algorithm
URI https://dx.doi.org/10.1016/j.cie.2019.02.015
Volume 130
WOSCitedRecordID wos000466825100015&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: ScienceDirect Freedom Collection - Elsevier
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: AIEXJ
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtZ1Lb9NAEIBXUcoBDjwKiPLSHDhhGfntNbcIFQFChUNBuVlre5cmcu3Ij7TwM_jFzO56HbdQRA9crMiJN4_5MjszngchL_Io97JQCFvQsLCDWHh2FnNmszjDZ9CfCFX52NeP8dERXS6Tz7PZD1MLsy3jqqLn58nmv4oaz6GwZensNcQ9Loon8DEKHY8odjz-k-A_9Z2KyJvqQ_SnUTBFX445k1Z3VtunKouSW6Ksz6z2pN4MIVnEpli1Tb8xpiTa3RZrmpWKPKzrrNXF7CffZa2XtUVfW1VfVTLGikCpNslDLIWV3-oGVz2dmsBmjkSrqFvtRofwXWvEMU1o1avAAZ8GJ9xkktNiirIcWxp5FxTucCdGq0xXT6Eedl9P10v_pth1jGH9ChWezMdLVKNVXQh6sYn2pc1tTDk02WzrFJdI5RKp46WO7E-w58VhQudkb_H-cPlh0mtez1s0X8HcE1fZgZc-x5-tmomlcnyX3B5cDFhoNO6RGa_2yZ3B3YBBmbf75NakF-V98nPCDSA3MOUGkBtgMOEGJDcguQHJDSA3sOMGagHIDRhuQHLzGhagqQFDDUypAU0NjNQ8IF_eHh6_eWcPAzvs3A-dzmYJL9AkYiH6QrlsJBckggdOxv2CFmHm-hmNBGXUyZNCiCJmHu43BaMFEwFFS8p_SOZVXfFHBFzBoshz_ch3aBAEEcuSyBXom6ADwmjgHxDH_OAoUJ21IoeqlOmVgj4gL8dLNrqVy99eHBgppoMtqm3MFIm8-rLH13mPJ-Tm7j_zlMy7pufPyI1826G4ng84_gJgYq8G
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Outsourcing+and+rescheduling+for+a+two-machine+flow+shop+with+the+disruption+of+new+arriving+jobs%3A+A+hybrid+variable+neighborhood+search+algorithm&rft.jtitle=Computers+%26+industrial+engineering&rft.au=Liu%2C+Le&rft.date=2019-04-01&rft.issn=0360-8352&rft.volume=130&rft.spage=198&rft.epage=221&rft_id=info:doi/10.1016%2Fj.cie.2019.02.015&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_cie_2019_02_015
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0360-8352&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0360-8352&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0360-8352&client=summon