A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold
Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given...
Gespeichert in:
| Veröffentlicht in: | IEEE transactions on cybernetics Jg. 49; H. 3; S. 1097 - 1109 |
|---|---|
| Hauptverfasser: | , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
United States
IEEE
01.03.2019
The Institute of Electrical and Electronics Engineers, Inc. (IEEE) |
| Schlagworte: | |
| ISSN: | 2168-2267, 2168-2275, 2168-2275 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!