Citace podle APA (7th ed.)

Elalouf, A., Levner, E., & Tang, H. (2013). An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem. Journal of scheduling, 16(4), 429-435. https://doi.org/10.1007/s10951-013-0320-6

Citace podle Chicago (17th ed.)

Elalouf, Amir, Eugene Levner, a Huajun Tang. "An Improved FPTAS for Maximizing the Weighted Number of Just-in-time Jobs in a Two-machine Flow Shop Problem." Journal of Scheduling 16, no. 4 (2013): 429-435. https://doi.org/10.1007/s10951-013-0320-6.

Citace podle MLA (9th ed.)

Elalouf, Amir, et al. "An Improved FPTAS for Maximizing the Weighted Number of Just-in-time Jobs in a Two-machine Flow Shop Problem." Journal of Scheduling, vol. 16, no. 4, 2013, pp. 429-435, https://doi.org/10.1007/s10951-013-0320-6.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..