APA (7th ed.) Citation

Elalouf, A., Levner, E., & Tang, H. (2013). An improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problem. Journal of scheduling, 16(4), 429-435. https://doi.org/10.1007/s10951-013-0320-6

Chicago Style (17th ed.) Citation

Elalouf, Amir, Eugene Levner, and Huajun Tang. "An Improved FPTAS for Maximizing the Weighted Number of Just-in-time Jobs in a Two-machine Flow Shop Problem." Journal of Scheduling 16, no. 4 (2013): 429-435. https://doi.org/10.1007/s10951-013-0320-6.

MLA (9th ed.) Citation

Elalouf, Amir, et al. "An Improved FPTAS for Maximizing the Weighted Number of Just-in-time Jobs in a Two-machine Flow Shop Problem." Journal of Scheduling, vol. 16, no. 4, 2013, pp. 429-435, https://doi.org/10.1007/s10951-013-0320-6.

Warning: These citations may not always be 100% accurate.