Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling
The problem of power plant preventive maintenance scheduling is studied in this paper. A reliability perspective is considered. This problem consists of ascertaining which generating units must halt production to be examined regularly for safety. It is very important because a failure in a power sta...
Saved in:
| Published in: | Optimization and engineering Vol. 12; no. 3; pp. 333 - 347 |
|---|---|
| Main Author: | |
| Format: | Journal Article |
| Language: | English |
| Published: |
Boston
Springer US
01.09.2011
Springer Nature B.V |
| Subjects: | |
| ISSN: | 1389-4420, 1573-2924 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!