Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling

The problem of power plant preventive maintenance scheduling is studied in this paper. A reliability perspective is considered. This problem consists of ascertaining which generating units must halt production to be examined regularly for safety. It is very important because a failure in a power sta...

Full description

Saved in:
Bibliographic Details
Published in:Optimization and engineering Vol. 12; no. 3; pp. 333 - 347
Main Author: Perez Canto, Salvador
Format: Journal Article
Language:English
Published: Boston Springer US 01.09.2011
Springer Nature B.V
Subjects:
ISSN:1389-4420, 1573-2924
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first