Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling
The problem of power plant preventive maintenance scheduling is studied in this paper. A reliability perspective is considered. This problem consists of ascertaining which generating units must halt production to be examined regularly for safety. It is very important because a failure in a power sta...