Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling
The problem of power plant preventive maintenance scheduling is studied in this paper. A reliability perspective is considered. This problem consists of ascertaining which generating units must halt production to be examined regularly for safety. It is very important because a failure in a power sta...
Gespeichert in:
| Veröffentlicht in: | Optimization and engineering Jg. 12; H. 3; S. 333 - 347 |
|---|---|
| 1. Verfasser: | |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Boston
Springer US
01.09.2011
Springer Nature B.V |
| Schlagworte: | |
| ISSN: | 1389-4420, 1573-2924 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!