Using 0/1 mixed integer linear programming to solve a reliability-centered problem of power plant preventive maintenance scheduling

The problem of power plant preventive maintenance scheduling is studied in this paper. A reliability perspective is considered. This problem consists of ascertaining which generating units must halt production to be examined regularly for safety. It is very important because a failure in a power sta...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Optimization and engineering Jg. 12; H. 3; S. 333 - 347
1. Verfasser: Perez Canto, Salvador
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Boston Springer US 01.09.2011
Springer Nature B.V
Schlagworte:
ISSN:1389-4420, 1573-2924
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!