Solving the unit commitment problem of hydropower plants via Lagrangian Relaxation and Sequential Quadratic Programming

We consider the optimal scheduling of hydropower plants in a hydrothermal interconnected system. This problem, of outmost importance for large-scale power systems with a high proportion of hydraulic generation, requires a detailed description of the so-called hydro unit production function. In our m...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Computational & applied mathematics Jg. 24; H. 3; S. 317 - 342
Hauptverfasser: Finardi, Erlon C., Silva, Edson L. da, Sagastizábal, Claudia
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Sociedade Brasileira de Matemática Aplicada e Computacional 01.12.2005
Schlagworte:
ISSN:1807-0302
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We consider the optimal scheduling of hydropower plants in a hydrothermal interconnected system. This problem, of outmost importance for large-scale power systems with a high proportion of hydraulic generation, requires a detailed description of the so-called hydro unit production function. In our model, we relate the amount of generated hydropower to nonlinear tailrace levels; we also take into account hydraulic losses, turbine-generator efficiencies, as well as multiple 0-1 states associated with forbidden operation zones. Forbidden zones are crucial to avoid nasty phenomena such as mechanical vibrations in the turbine, cavitation, and low efficiency levels. The minimization of operating costs subject to such detailed constraints results in a large-scale mixed-integer nonlinear programming problem. By means of Lagrangian Relaxation, the original problem is split into a sequence of smaller and easy-to-solve subproblems, coordinated by a dual master program. In order to deal better with the combinatorial aspect introduced by the forbidden zones, we derive three different decomposition strategies, applicable to various configurations of hydro plants (with few or many units, which can be identical or different). We use a Sequential Quadratic Programming algorithm to solve nonlinear subproblems. We assess our approach on a real-life hydroelectric configuration extracted from the south sub region of the Brazilian hydrothermal power system.
ISSN:1807-0302
DOI:10.1590/S0101-82052005000300001