Developing algorithm and dispatching rules for scheduling a realistic flexible flow shop with setups to minimize total weighted tardiness
In this research, we are studying the scheduling problem of a professional ball manufacturing company in Taiwan. The problem is related to scheduling a flexible flow shop that includes setups with the aim of minimizing total weighted tardiness. We first present a mathematical model for the studied p...
Uloženo v:
| Vydáno v: | International journal of advanced manufacturing technology Ročník 138; číslo 1; s. 225 - 245 |
|---|---|
| Hlavní autoři: | , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
London
Springer London
01.05.2025
Springer Nature B.V |
| Témata: | |
| ISSN: | 0268-3768, 1433-3015 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
Buďte první, kdo okomentuje tento záznam!