A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration

This article addresses a two-stage, three-machine assembly scheduling problem that considers the learning effect. All jobs are processed on two machines in the first stage and move on to be processed on an assembly machine in the second stage. The objective of the study is to minimize the total comp...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Engineering optimization Ročník 52; číslo 6; s. 1009 - 1036
Hlavní autori: Wu, Chin-Chia, Bai, Danyu, Azzouz, Ameni, Chung, I.-Hong, Cheng, Shuenn-Ren, Jhwueng, Dwueng-Chwuan, Lin, Win-Chin, Said, Lamjed Ben
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Abingdon Taylor & Francis 02.06.2020
Taylor & Francis Ltd
Predmet:
ISSN:0305-215X, 1029-0273
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Buďte prvý, kto okomentuje tento záznam!
Najprv sa musíte prihlásiť.