APA (7th ed.) Citation

Wu, C., Bai, D., Azzouz, A., Chung, I., Cheng, S., Jhwueng, D., . . . Said, L. B. (2020). A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration. Engineering optimization, 52(6), 1009-1036. https://doi.org/10.1080/0305215X.2019.1632303

Chicago Style (17th ed.) Citation

Wu, Chin-Chia, Danyu Bai, Ameni Azzouz, I.-Hong Chung, Shuenn-Ren Cheng, Dwueng-Chwuan Jhwueng, Win-Chin Lin, and Lamjed Ben Said. "A Branch-and-bound Algorithm and Four Metaheuristics for Minimizing Total Completion Time for a Two-stage Assembly Flow-shop Scheduling Problem with Learning Consideration." Engineering Optimization 52, no. 6 (2020): 1009-1036. https://doi.org/10.1080/0305215X.2019.1632303.

MLA (9th ed.) Citation

Wu, Chin-Chia, et al. "A Branch-and-bound Algorithm and Four Metaheuristics for Minimizing Total Completion Time for a Two-stage Assembly Flow-shop Scheduling Problem with Learning Consideration." Engineering Optimization, vol. 52, no. 6, 2020, pp. 1009-1036, https://doi.org/10.1080/0305215X.2019.1632303.

Warning: These citations may not always be 100% accurate.