Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm
At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuz...
Saved in:
| Published in: | Mathematical problems in engineering Vol. 2022; pp. 1 - 11 |
|---|---|
| Main Authors: | , |
| Format: | Journal Article |
| Language: | English |
| Published: |
New York
Hindawi
04.10.2022
John Wiley & Sons, Inc |
| Subjects: | |
| ISSN: | 1024-123X, 1563-5147 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Abstract | At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors. |
|---|---|
| AbstractList | At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors. Therefore, on the basis of the engineering network diagram, this paper proposes a construction project schedule management method based on the fuzzy logic neural network algorithm. By building a neural network, a large amount of historical data is input, and computers are allowed to calculate the key routes, thus predicting the construction period, and a construction project in a city is taken as an example for simulation experiments. The traditional construction period management scheme expects a construction period of 55 days. The planned construction period optimized by the project management technology integrating fuzzy logic neural network algorithm is 55 days, which is 2 days less than the traditional construction project schedule management technology and will not cause construction period delay. The simulation results show that this algorithm is more accurate and more efficient in calculating the key lines when dealing with large-scale projects, which can help the construction unit to quickly find the optimal strategy and effectively reduce the construction delay and capital loss caused by uncertainty factors. |
| Author | Yu, Xiaobing Zuo, Hengzhong |
| Author_xml | – sequence: 1 givenname: Xiaobing surname: Yu fullname: Yu, Xiaobing organization: Hunan Vocational College of EngineeringZhengzhouHunan 410151Chinazzu.edu.cn – sequence: 2 givenname: Hengzhong orcidid: 0000-0001-8983-6530 surname: Zuo fullname: Zuo, Hengzhong organization: Changsha University of Science and TechnologyChangshaHunan 410076Chinacsust.edu.cn |
| BookMark | eNp9kF9LwzAUxYNMcJu--QECPmpdbtI03eMcTgfDCSr4VtI03TK7ZqYpY3vyo9v9eVHQp3su53fuhdNBrdKWGqFLILcAnPcoobQXQ6NJeILawCMWcAhFq9GEhgFQ9n6GOlW1IIQCh7iNvsal10VhZrr0eGjLyrtaeWNLPF15szRbuV8axztbYJv_hJ6dXWjl8Yua66wuNL6Tlc5w4_i5xqN6u93giZ0ZhZ907WTRDL-27gMPipl1xs-X5-g0l0WlL46zi95G96_Dx2AyfRgPB5NAMSZ8kGYQaZFCCirKYw0CVD_thxwE53muaE5Slikm8jhKGUhBiVBxCkLQVLIQgHXR1eHuytnPWlc-Wdjalc3LhArKgZGQ7aibA6WcrSqn82TlzFK6TQIk2XWc7DpOjh03OP2FK-P3jXknTfFX6PoQmpsyk2vz_4tvvBaPIA |
| CitedBy_id | crossref_primary_10_1038_s41598_025_91253_z crossref_primary_10_1007_s13042_024_02130_6 crossref_primary_10_3846_jcem_2024_22250 crossref_primary_10_2478_amns_2024_2554 |
| Cites_doi | 10.1109/CIS.2016.0099 10.1016/j.eswa.2016.07.011 10.1016/j.eswa.2010.12.165 10.1016/j.ijproman.2011.09.002 10.1201/b18205 10.1088/1742-6596/2131/2/022114 10.1108/ci-07-2018-0059 10.1088/1742-6596/1726/1/012010 10.1016/j.autcon.2012.11.040 10.1109/21.199466 |
| ContentType | Journal Article |
| Copyright | Copyright © 2022 Xiaobing Yu and Hengzhong Zuo. Copyright © 2022 Xiaobing Yu and Hengzhong Zuo. This is an open access article distributed under the Creative Commons Attribution License (the “License”), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. https://creativecommons.org/licenses/by/4.0 |
| Copyright_xml | – notice: Copyright © 2022 Xiaobing Yu and Hengzhong Zuo. – notice: Copyright © 2022 Xiaobing Yu and Hengzhong Zuo. This is an open access article distributed under the Creative Commons Attribution License (the “License”), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License. https://creativecommons.org/licenses/by/4.0 |
| DBID | RHU RHW RHX AAYXX CITATION 7TB 8FD 8FE 8FG ABJCF ABUWG AFKRA ARAPS AZQEC BENPR BGLVJ CCPQU CWDGH DWQXO FR3 GNUQQ HCIFZ JQ2 K7- KR7 L6V M7S P5Z P62 PHGZM PHGZT PIMPY PKEHL PQEST PQGLB PQQKQ PQUKI PRINS PTHSS |
| DOI | 10.1155/2022/8111504 |
| DatabaseName | Hindawi Publishing Complete Hindawi Publishing Subscription Journals Hindawi Publishing Open Access CrossRef Mechanical & Transportation Engineering Abstracts Technology Research Database ProQuest SciTech Collection ProQuest Technology Collection Materials Science & Engineering Collection ProQuest Central (Alumni) ProQuest Central UK/Ireland Advanced Technologies & Computer Science Collection ProQuest Central Essentials - QC ProQuest Central ProQuest Technology Collection ProQuest One Community College Middle East & Africa Database ProQuest Central Korea Engineering Research Database ProQuest Central Student SciTech Collection (ProQuest) ProQuest Computer Science Collection Computer Science Database (ProQuest) Civil Engineering Abstracts ProQuest Engineering Collection Engineering Database Advanced Technologies & Aerospace Database ProQuest Advanced Technologies & Aerospace Collection ProQuest Central Premium ProQuest One Academic (New) ProQuest Publicly Available Content Database ProQuest One Academic Middle East (New) ProQuest One Academic Eastern Edition (DO NOT USE) ProQuest One Applied & Life Sciences ProQuest One Academic (retired) ProQuest One Academic UKI Edition ProQuest Central China Engineering Collection |
| DatabaseTitle | CrossRef Publicly Available Content Database Computer Science Database ProQuest Central Student Technology Collection Technology Research Database ProQuest One Academic Middle East (New) Mechanical & Transportation Engineering Abstracts ProQuest Advanced Technologies & Aerospace Collection ProQuest Central Essentials ProQuest Computer Science Collection ProQuest Central (Alumni Edition) SciTech Premium Collection ProQuest One Community College ProQuest Central China ProQuest Central ProQuest One Applied & Life Sciences ProQuest Engineering Collection Middle East & Africa Database ProQuest Central Korea ProQuest Central (New) Engineering Collection Advanced Technologies & Aerospace Collection Civil Engineering Abstracts Engineering Database ProQuest One Academic Eastern Edition ProQuest Technology Collection ProQuest SciTech Collection Advanced Technologies & Aerospace Database ProQuest One Academic UKI Edition Materials Science & Engineering Collection Engineering Research Database ProQuest One Academic ProQuest One Academic (New) |
| DatabaseTitleList | CrossRef Publicly Available Content Database |
| Database_xml | – sequence: 1 dbid: RHX name: Hindawi Publishing Open Access url: http://www.hindawi.com/journals/ sourceTypes: Publisher – sequence: 2 dbid: PIMPY name: Publicly Available Content Database url: http://search.proquest.com/publiccontent sourceTypes: Aggregation Database |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Applied Sciences |
| EISSN | 1563-5147 |
| Editor | Ding, Baiyuan |
| Editor_xml | – sequence: 1 givenname: Baiyuan surname: Ding fullname: Ding, Baiyuan |
| EndPage | 11 |
| ExternalDocumentID | 10_1155_2022_8111504 |
| GrantInformation_xml | – fundername: Innovation and practice of talent training model for engineering construction specialty cluster under the background of natural resources grantid: GCZD01 – fundername: the top-level design of talent training in the context of natural resources for engineering construction professional clusters to serve the Hunan “three highlands and four new mission” strategy grantid: 2022G03 |
| GroupedDBID | 29M 2WC 3V. 4.4 5GY 5VS 8FE 8FG 8R4 8R5 AAFWJ AAJEY ABDBF ABJCF ABUWG ACIPV ACIWK ADBBV AENEX AFKRA AINHJ ALMA_UNASSIGNED_HOLDINGS ARAPS BCNDV BENPR BGLVJ BPHCQ CCPQU CS3 CWDGH E3Z EBS ESX GROUPED_DOAJ HCIFZ I-F IAO IEA IOF ISR ITC K6V K7- KQ8 L6V M7S MK~ M~E OK1 P2P P62 PIMPY PQQKQ PROAC PTHSS Q2X REM RHU RHW RHX RNS TR2 TUS XSB YQT ~8M 0R~ 24P AAMMB AAYXX ACCMX AEFGJ AFFHD AGXDD AIDQK AIDYY ALUQN CITATION H13 OVT PHGZM PHGZT PQGLB 7TB 8FD AZQEC DWQXO FR3 GNUQQ JQ2 KR7 PKEHL PQEST PQUKI PRINS |
| ID | FETCH-LOGICAL-c337t-bd16e7b1b1c6f8e171c9b9451755ffc2f0b3dc37f86b31a7207c8b1772ba34113 |
| IEDL.DBID | M7S |
| ISICitedReferencesCount | 3 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000870009700004&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 1024-123X |
| IngestDate | Fri Jul 25 10:10:56 EDT 2025 Sat Nov 29 06:37:40 EST 2025 Tue Nov 18 22:26:29 EST 2025 Sun Jun 02 18:51:04 EDT 2024 |
| IsDoiOpenAccess | true |
| IsOpenAccess | true |
| IsPeerReviewed | true |
| IsScholarly | true |
| Language | English |
| License | This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. https://creativecommons.org/licenses/by/4.0 |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c337t-bd16e7b1b1c6f8e171c9b9451755ffc2f0b3dc37f86b31a7207c8b1772ba34113 |
| Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ORCID | 0000-0001-8983-6530 |
| OpenAccessLink | https://www.proquest.com/docview/2725130431?pq-origsite=%requestingapplication% |
| PQID | 2725130431 |
| PQPubID | 237775 |
| PageCount | 11 |
| ParticipantIDs | proquest_journals_2725130431 crossref_primary_10_1155_2022_8111504 crossref_citationtrail_10_1155_2022_8111504 hindawi_primary_10_1155_2022_8111504 |
| PublicationCentury | 2000 |
| PublicationDate | 2022-10-04 |
| PublicationDateYYYYMMDD | 2022-10-04 |
| PublicationDate_xml | – month: 10 year: 2022 text: 2022-10-04 day: 04 |
| PublicationDecade | 2020 |
| PublicationPlace | New York |
| PublicationPlace_xml | – name: New York |
| PublicationTitle | Mathematical problems in engineering |
| PublicationYear | 2022 |
| Publisher | Hindawi John Wiley & Sons, Inc |
| Publisher_xml | – name: Hindawi – name: John Wiley & Sons, Inc |
| References | 22 F. Chen (5) 2017 25 G. M. Sun (26) R. C. Newbold (9) 1998 H. Kim (14) L. M. Naeni (28) 2011; 38 P. Bhaskaran (4) 1988; 16 T. Cheng (11) Z. M. Xiong (24) 2018; 39 P. Kulkarni (10) 2017; 1 S. Yang (2) 2006; 8 J. K. Basu (13) 2010; 4 15 Z. J. Wang (8) 2007 B. Liu (19) 2014; 119 J. I. Fanrong (1) 2014; 35 17 R. Jin (23) 2018; 25 L. Xu (20) 2010; 3 L. X. Wang (27) 2002; 22 S. Sood (7) 2002; 1230 M.-R. Marin (12) 2016; 63 3 H. Kerzner (18) 1989 S. H. Jan (6) Y. Y. Hong (16) 2012; 5 21 |
| References_xml | – ident: 11 article-title: Research Status of artificial neural network and its application Assumption in Aviation[C] doi: 10.1109/CIS.2016.0099 – volume: 8 start-page: 55 issue: 8 year: 2006 ident: 2 article-title: Study on construction schedule management and control method for Hydraulic & Hydropower engineering based on visual simulation[J] publication-title: Systems Engineering-Theory & Practice – volume: 16 issue: 4 year: 1988 ident: 4 article-title: Progress monitoring for a highway project with cpm network plan[J] publication-title: Indian Highways – volume: 4 issue: 2 year: 2010 ident: 13 article-title: Use of artificial neural network in pattern recognition[J] publication-title: International journal of software engineering and its applications – volume: 5 issue: 12 year: 2012 ident: 16 article-title: Nonintrusive energy monitoring for Microgrids using Hybrid self-organizing feature-mapping networks[J] publication-title: Energies – volume: 35 start-page: 40 issue: 10 year: 2014 ident: 1 article-title: Study on visualization of construction schedule management under BIM Scenarios[J] publication-title: Construction Economy – start-page: 21 ident: 26 article-title: Application of neural networks in Civil design engineering[J] – year: 2017 ident: 5 article-title: Project progress tracking template -using a repeatable gss process to facilitate project process management[J] – volume: 63 start-page: 284 year: 2016 ident: 12 article-title: An intelligent system for the acquisition and management of information from bill of quantities in building projects[J] publication-title: Expert Systems with Applications doi: 10.1016/j.eswa.2016.07.011 – volume: 38 start-page: 8193 issue: 7 year: 2011 ident: 28 article-title: Evaluating fuzzy earned value indices and estimates by applying alpha cuts[J] publication-title: Expert Systems with Applications doi: 10.1016/j.eswa.2010.12.165 – ident: 21 doi: 10.1016/j.ijproman.2011.09.002 – volume: 25 issue: 10 year: 2018 ident: 23 article-title: Project-based pedagogy in interdisciplinary building design adopting BIM[J] publication-title: Engineering Construction and Architectural Management – volume: 3 start-page: 875 issue: 5 year: 2010 ident: 20 article-title: Factors affecting the construction progress and construction management[J] publication-title: Friend of Science Amateurs – volume-title: Project management in the Fast Lane: Applying the Theory of constraints[M] year: 1998 ident: 9 doi: 10.1201/b18205 – ident: 22 doi: 10.1088/1742-6596/2131/2/022114 – year: 2007 ident: 8 article-title: Understanding the key risks in construction projects in China[J] publication-title: International Journal of Project Management – volume: 1 start-page: 70 issue: 2 year: 2017 ident: 10 article-title: Artificial neural networks for construction management: a review[J] publication-title: Journal of Soft Computing in Civil Engineering – ident: 25 doi: 10.1108/ci-07-2018-0059 – ident: 17 doi: 10.1016/j.eswa.2016.07.011 – ident: 14 article-title: Renal parenchyma segmentation in abdominal MR images based on cascaded deep convolutional neural network with signal intensity correction[C] – start-page: 759 volume-title: A Systems Approach to Planning, Scheduling and Controlling year: 1989 ident: 18 – volume: 1230 start-page: 40 year: 2002 ident: 7 article-title: Theory of constraints can change the way you manage your projects[J] publication-title: Electronic Engineering Times – volume: 39 start-page: 3703 issue: 10 year: 2018 ident: 24 article-title: Research progress on safety risk management for large scale geotechnical engineering construction in China[J] publication-title: Geotechnical Engineering – ident: 6 article-title: Enhance construction visual as-Built schedule management using BIM technology – ident: 15 doi: 10.1088/1742-6596/1726/1/012010 – ident: 3 doi: 10.1016/j.autcon.2012.11.040 – volume: 22 start-page: 1414 issue: 6 year: 2002 ident: 27 article-title: Generating fuzzy rules by learning from examples[J] publication-title: IEEE Transactions on Systems Man & Cybernetics doi: 10.1109/21.199466 – volume: 119 start-page: 601 year: 2014 ident: 19 article-title: Explore the importance of schedule management in the construction project management publication-title: Urbanism and Architecture |
| SSID | ssj0021518 |
| Score | 2.330051 |
| Snippet | At present, the field of construction engineering is limited by various situations, such as complex construction environments and many uncertain factors.... |
| SourceID | proquest crossref hindawi |
| SourceType | Aggregation Database Enrichment Source Index Database Publisher |
| StartPage | 1 |
| SubjectTerms | Algorithms Artificial neural networks Computer simulation Construction Construction engineering Cooperation Critical path Fuzzy logic Integer programming Linear programming Mathematical analysis Mathematical programming Methods Neural networks Optimization Project management Psychologists Schedules Software Success |
| SummonAdditionalLinks | – databaseName: Hindawi Publishing Open Access dbid: RHX link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwjV3PS8MwFA5uKHjxtzidksM8SXFp0jY7TnFMkDlEpbfSpIkb7IesVXEn_3Rf2nQwh-ix5DWUvibf95r3vodQg3AdK181ndjzhcN8ph3BpHK0TmKWaAiJ8grv57ug1-Nh2OpbkaR09Qgf0M6E5-4lJ4a6sAqqcM9kbj10w0VcBaBVVLy5RoKPhmV--497l5BnY2BC3o_hyhac40pnB21ZQojbhQd30Zqa7KFtSw6xXXrpPvq6XYhnZti02SyFX_E9rPqxLac0Iyb1HE_1slG_-OMCEw4AXEYKXwF8JRhGgAHiztt8_olN32WJjVwHPFCvyA_H7dHLdDbMBuMD9NS5ebzuOrZ9giMpDTJHJMRXgSCCSF9zRQIiW6LFPCAMntbS1U1BE0kDzX1BSRy4zUByo0blihiwjdBDVJ1MJ-oIYa04hS1VUwinmNR-nFCXa-7FCvifbPIauihfbSSttrhpcTGK8hjD8yLjiMg6oobOF9avhabGL3YN66U_zOqlCyO7ANPIDYC4UaMcdPy_WU7QprnM8_RYHVXBP-oUrcv3bJjOzvIP7hu9SM-g priority: 102 providerName: Hindawi Publishing |
| Title | Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm |
| URI | https://dx.doi.org/10.1155/2022/8111504 https://www.proquest.com/docview/2725130431 |
| Volume | 2022 |
| WOSCitedRecordID | wos000870009700004&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVPQU databaseName: Advanced Technologies & Aerospace Database customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: P5Z dateStart: 20080101 isFulltext: true titleUrlDefault: https://search.proquest.com/hightechjournals providerName: ProQuest – providerCode: PRVPQU databaseName: Computer Science Database (ProQuest) customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: K7- dateStart: 20080101 isFulltext: true titleUrlDefault: http://search.proquest.com/compscijour providerName: ProQuest – providerCode: PRVPQU databaseName: Engineering Database customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: M7S dateStart: 20080101 isFulltext: true titleUrlDefault: http://search.proquest.com providerName: ProQuest – providerCode: PRVPQU databaseName: Middle East & Africa Database (ProQuest) customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: CWDGH dateStart: 20080101 isFulltext: true titleUrlDefault: https://search.proquest.com/middleeastafrica providerName: ProQuest – providerCode: PRVPQU databaseName: ProQuest Central customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: BENPR dateStart: 20080101 isFulltext: true titleUrlDefault: https://www.proquest.com/central providerName: ProQuest – providerCode: PRVPQU databaseName: Publicly Available Content Database customDbUrl: eissn: 1563-5147 dateEnd: 20250131 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: PIMPY dateStart: 20080101 isFulltext: true titleUrlDefault: http://search.proquest.com/publiccontent providerName: ProQuest – providerCode: PRVWIB databaseName: Wiley Online Library Open Access customDbUrl: eissn: 1563-5147 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0021518 issn: 1024-123X databaseCode: 24P dateStart: 19950101 isFulltext: true titleUrlDefault: https://authorservices.wiley.com/open-science/open-access/browse-journals.html providerName: Wiley-Blackwell |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1Lb9QwEB71ARIXSnmIQln5UE7I6jqOY-8JtairVoVtVChaeolix2YrbXfb7gKiJ346M4mzqKqgBy6RkhlZlj57Hs74G4AtYULpM9_lpcosT7M0cJs6z0OoyrQKmBLVN7w_v9eDgRkOe3k8cJvFssrWJtaGupo6OiPfTjR6YklUMG8vLjl1jaK_q7GFxjKsEkuCqEv3Pi4SLvzSXIVLiJtPDtvCd6Uo50-2jaB4KL3hku6PKBf-cXbLNtcOp7_2v1N9BA9jqMl2mrWxDkt-8hjWYtjJ4qaePYFfBwtazjmjBp4tpSw7QntyHi9qkoSK2tk03FTKm7McHHCEbmvs2S46xoqhBGNL1v92ff2TUUdnx4gIBCc0aCrP2c74K856Pjp_Cif9vU_v9nlszMCdlHrObSUyr62wwmXBeKGF69leqjAUUSG4JHStrJzUwWRWilInXe0M8VwltkSvKeQzWJlMJ_45sOCNRGMdJCZqqQtZWcnEBKNKj5Gl65oNeNNiU7jIWk7NM8ZFnb0oVRCSRURyA14vtC8ato6_6G1FmO9Q22wBLuLWnhV_0H3xb_FLeECD1ZV_6SasIC7-Fdxz3-dns6sOrO7uDfLjDiwfat6p1y0-c3WKkvzgQ_4F3473h78Bl0L2lQ |
| linkProvider | ProQuest |
| linkToHtml | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1LbxMxEB6VFgQXyqOI0hZ8aE_IavzYtXOoqvKIGiWEHgrKbVl7bVIpTQoJVO2pv4jfyMw-gioEnHrgbMta2Z_nm_HOfAOwLWzMQxpaPE9Sx3WqI3faBx5jkesiYkhUVnh_7JvBwA6H7aMl-NHUwlBaZWMTS0NdTD29ke9Kg0ysSApm_-wLp65R9He1aaFRwaIXLs4xZJvtdd_g-e5I2Xl7_PqQ110FuFfKzLkrRBqME074NNogjPBt19YJ8mgSo5ex5VThlYk2dUrkRraMtyTSJF2OJl8oXPcWrGhlDd2rnuGLAA_Zsyq9k6QFqIZNon2S0BuD3LWC_C99jQLvjCj2Pj_5jQtKguus_m9b8wDu1640O6iw_xCWwuQRrNZuNauN1uwxXHUXsqNzRg1KG8lc9h7t5WldiEojlLTPpvH6pKPqrQoXHCEtjwN7hcRfMBxB35l1vl1eXjDqWO0ZCZ3gBw2qzHp2MP6MuzQfna7BhxvZhyewPJlOwlNgMViFZBQVBqLaxzQvlLTRJnlAz9m37Dq8bLCQ-VqVnZqDjLMyOkuSjJCT1chZh53F7LNKjeQP87ZrWP1j2mYDqKw2XbPsF5qe_X34Bdw9PH7Xz_rdQW8D7tHCZZaj3oRlPKOwBbf99_nJ7Ovz8pYw-HTT2PsJ5RJMqQ |
| linkToPdf | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1NbxMxEB2VFioubYFW9At8aE9oldhe7zqHChVKRNQq5AAo4rKsvXYTKU0KSVu1J34Xv46ZXW9QhYBTDz3bsna9z_NmvDNvAPa49rlLXDPKVWKiOIl9ZGLrIu-LPC48hkRlhffnk7Tb1f1-q7cAP-taGEqrrG1iaaiLiaU78oZIkYklScE0fEiL6B21X59_i6iDFP1prdtpVBA5dtdXGL5NDzpH-K33hWi_-_j2fRQ6DERWynQWmYInLjXccJt47XjKbcu0YoWcqry3wjeNLKxMvU6M5HkqmqnVJNgkTI7mn0tc9wEs4fu0KJ2wp77Mgz1k0qoMT5AuoOzXSfdK0X2DaGhOvlh8iw4fDSgOvxr-wQsl2bVX7_M2rcFKcLHZYXUmnsCCGz-F1eBus2DMps_gR2cuRzpj1Li0ltJlH9COnoUCVRqhZH428bcn9ao7LFxwgHQ9cuwNOgQFwxH0qVn74ubmmlEna8tIAAUfqFtl3LPD0Snu0mxwtg6f7mQfNmBxPBm758C80xJJyksMUGPrk7yQQnutcocetW3qTXhV4yKzQa2dmoaMsjJqUyojFGUBRZuwP599XqmU_GXeXoDYf6bt1ODKgkmbZr-RtfXv4ZewjJDLTjrd4214TOuWyY_xDiziJ3K78NBezobT7y_KA8Pg611D7xdVyFXN |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Intelligent+Construction+Optimization+Control+of+Construction+Project+Schedule+Based+on+the+Fuzzy+Logic+Neural+Network+Algorithm&rft.jtitle=Mathematical+problems+in+engineering&rft.au=Yu%2C+Xiaobing&rft.au=Zuo%2C+Hengzhong&rft.date=2022-10-04&rft.pub=John+Wiley+%26+Sons%2C+Inc&rft.issn=1024-123X&rft.eissn=1563-5147&rft.volume=2022&rft_id=info:doi/10.1155%2F2022%2F8111504&rft.externalDBID=HAS_PDF_LINK |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1024-123X&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1024-123X&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1024-123X&client=summon |