Yu, X., & Zuo, H. (2022). Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm. Mathematical problems in engineering, 2022, 1-11. https://doi.org/10.1155/2022/8111504
Chicago Style (17th ed.) CitationYu, Xiaobing, and Hengzhong Zuo. "Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm." Mathematical Problems in Engineering 2022 (2022): 1-11. https://doi.org/10.1155/2022/8111504.
MLA (9th ed.) CitationYu, Xiaobing, and Hengzhong Zuo. "Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm." Mathematical Problems in Engineering, vol. 2022, 2022, pp. 1-11, https://doi.org/10.1155/2022/8111504.