APA (7th ed.) Citation

Yu, X., & Zuo, H. (2022). Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm. Mathematical problems in engineering, 2022, 1-11. https://doi.org/10.1155/2022/8111504

Chicago Style (17th ed.) Citation

Yu, Xiaobing, and Hengzhong Zuo. "Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm." Mathematical Problems in Engineering 2022 (2022): 1-11. https://doi.org/10.1155/2022/8111504.

MLA (9th ed.) Citation

Yu, Xiaobing, and Hengzhong Zuo. "Intelligent Construction Optimization Control of Construction Project Schedule Based on the Fuzzy Logic Neural Network Algorithm." Mathematical Problems in Engineering, vol. 2022, 2022, pp. 1-11, https://doi.org/10.1155/2022/8111504.

Warning: These citations may not always be 100% accurate.