Minimizing the number of late jobs for the two-machine unit-time job-shop scheduling problem
This paper considers the problem of minimizing the weighted number of late jobs in the two-machine job-shop with unit time operations. We show its NP-hardness and propose an O( n 5∑ w i ) time algorithm, which is based on solving optimally a related problem where a maximal set of early jobs is to be...
Gespeichert in:
| Veröffentlicht in: | Discrete Applied Mathematics Jg. 98; H. 3; S. 209 - 217 |
|---|---|
| 1. Verfasser: | |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Lausanne
Elsevier B.V
15.01.2000
Amsterdam Elsevier New York, NY |
| Schlagworte: | |
| ISSN: | 0166-218X, 1872-6771 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | This paper considers the problem of minimizing the weighted number of late jobs in the two-machine job-shop with unit time operations. We show its NP-hardness and propose an O(
n
5∑
w
i
) time algorithm, which is based on solving optimally a related problem where a maximal set of early jobs is to be determined. |
|---|---|
| ISSN: | 0166-218X 1872-6771 |
| DOI: | 10.1016/S0166-218X(99)00165-1 |