IGDT-based economic dispatch considering the uncertainty of wind and demand response

Integration of wind generation and demand response (DR) poses challenges for the power system operation due to their uncertain characteristics. In this study, an economic dispatching method considering the uncertainties of wind and DR is proposed. The method based on the information gap decision the...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:IET renewable power generation Ročník 13; číslo 6; s. 856 - 866
Hlavní autoři: Dai, Xuemei, Wang, Ying, Yang, Shengchun, Zhang, Kaifeng
Médium: Journal Article
Jazyk:angličtina
Vydáno: The Institution of Engineering and Technology 29.04.2019
Témata:
DR
ISSN:1752-1416, 1752-1424, 1752-1424
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:Integration of wind generation and demand response (DR) poses challenges for the power system operation due to their uncertain characteristics. In this study, an economic dispatching method considering the uncertainties of wind and DR is proposed. The method based on the information gap decision theory (IGDT) can be used to evaluate risks associated with uncertainties from risk averse (RA) and risk-seeking (RS) perspectives. The RA IGDT-based model can provide maximum tolerable robustness region for the required cost target. The RS IGDT-based model can help achieve the lowest operation costs with desired uncertainties. The proposed model is bi-level. The upper level subproblem aims to maximise (minimise) the allowable uncertainty level to satisfy the pre-determined cost target, while the lower level subproblem is to maximise (minimise) possible cost considering the uncertainties. The bi-level model is then transformed into a single level mixed integer linear programming problem that can be solved through commercial solves. Finally, the authors evaluate the performance of the IGDT-based approach by simulations on the modified 6-bus and IEEE 118-bus systems. The results show that the proposed approach can provide suggestions for system operators to make appropriate scheduling plan based on the expected cost targets and risk preferences.
ISSN:1752-1416
1752-1424
1752-1424
DOI:10.1049/iet-rpg.2018.5581