Azadeh, A., Maleki Shoja, B., Ghanei, S., & Sheikhalishahi, M. (2015). A multi-objective optimization problem for multi-state series-parallel systems: A two-stage flow-shop manufacturing system. Reliability engineering & system safety, 136, 62-74. https://doi.org/10.1016/j.ress.2014.11.009
Citácia podle Chicago (17th ed.)Azadeh, A., B. Maleki Shoja, S. Ghanei, a M. Sheikhalishahi. "A Multi-objective Optimization Problem for Multi-state Series-parallel Systems: A Two-stage Flow-shop Manufacturing System." Reliability Engineering & System Safety 136 (2015): 62-74. https://doi.org/10.1016/j.ress.2014.11.009.
Citácia podľa MLA (8th ed.)Azadeh, A., et al. "A Multi-objective Optimization Problem for Multi-state Series-parallel Systems: A Two-stage Flow-shop Manufacturing System." Reliability Engineering & System Safety, vol. 136, 2015, pp. 62-74, https://doi.org/10.1016/j.ress.2014.11.009.