Jia, W., Jiang, Z., & Li, Y. (2015). Scheduling to minimize the makespan in large-piece one-of-a-kind production with machine availability constraints. Expert systems with applications, 42(23), 9174-9182. https://doi.org/10.1016/j.eswa.2015.08.012
Chicago Style (17th ed.) CitationJia, Wenyou, Zhibin Jiang, and You Li. "Scheduling to Minimize the Makespan in Large-piece One-of-a-kind Production with Machine Availability Constraints." Expert Systems with Applications 42, no. 23 (2015): 9174-9182. https://doi.org/10.1016/j.eswa.2015.08.012.
MLA (9th ed.) CitationJia, Wenyou, et al. "Scheduling to Minimize the Makespan in Large-piece One-of-a-kind Production with Machine Availability Constraints." Expert Systems with Applications, vol. 42, no. 23, 2015, pp. 9174-9182, https://doi.org/10.1016/j.eswa.2015.08.012.