Li, S., Cheng, T., Ng, C., & Yuan, J. (2017). Two‐agent scheduling on a single sequential and compatible batching machine. Naval research logistics, 64(8), 628-641. https://doi.org/10.1002/nav.21779
Chicago Style (17th ed.) CitationLi, Shisheng, T.C.E Cheng, C.T Ng, and Jinjiang Yuan. "Two‐agent Scheduling on a Single Sequential and Compatible Batching Machine." Naval Research Logistics 64, no. 8 (2017): 628-641. https://doi.org/10.1002/nav.21779.
MLA (9th ed.) CitationLi, Shisheng, et al. "Two‐agent Scheduling on a Single Sequential and Compatible Batching Machine." Naval Research Logistics, vol. 64, no. 8, 2017, pp. 628-641, https://doi.org/10.1002/nav.21779.
Warning: These citations may not always be 100% accurate.