A probabilistic bi-level linear multi-objective programming problem to supply chain planning
Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible...
Saved in:
| Published in: | Applied mathematics and computation Vol. 188; no. 1; pp. 786 - 800 |
|---|---|
| Main Authors: | , , |
| Format: | Journal Article |
| Language: | English |
| Published: |
New York, NY
Elsevier Inc
01.05.2007
Elsevier |
| Subjects: | |
| ISSN: | 0096-3003, 1873-5649 |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Abstract | Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels.
In most of the real life problems in mathematical programming, the parameters are considered as random variables. The branch of mathematical programming which deals with the theory and methods for the solution of conditional extremum problems under incomplete information about the random parameters is called “stochastic programming”.
Supply chain planning problems are concerned with synchronizing and optimizing multiple activities involved in the enterprise, from the start of the process, such as procurement of the raw materials, through a series of process operations, to the end, such as distribution of the final product to customers.
Enterprise-wide supply chain planning problems naturally exhibit a multi-level decision network structure, where for example, one level may correspond to a local plant control/scheduling/planning problem and another level to a corresponding plant-wide planning/network problem. Such a multi-level decision network structure can be mathematically represented by using “multi-level programming” principles.
In this paper, we consider a “probabilistic bi-level linear multi-objective programming problem” and its application in enterprise-wide supply chain planning problem where (1) market demand, (2) production capacity of each plant and (3) resource available to all plants for each product are random variables and the constraints may consist of joint probability distributions or not. This probabilistic model is first converted into an equivalent deterministic model in each level, to which fuzzy programming technique is applied to solve the multi-objective nonlinear programming problem to obtain a compromise solution. |
|---|---|
| AbstractList | Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at the second level. Three level programming results when second level is itself a bi-level programming. By extending this idea it is possible to define multi-level programs with any number of levels.
In most of the real life problems in mathematical programming, the parameters are considered as random variables. The branch of mathematical programming which deals with the theory and methods for the solution of conditional extremum problems under incomplete information about the random parameters is called “stochastic programming”.
Supply chain planning problems are concerned with synchronizing and optimizing multiple activities involved in the enterprise, from the start of the process, such as procurement of the raw materials, through a series of process operations, to the end, such as distribution of the final product to customers.
Enterprise-wide supply chain planning problems naturally exhibit a multi-level decision network structure, where for example, one level may correspond to a local plant control/scheduling/planning problem and another level to a corresponding plant-wide planning/network problem. Such a multi-level decision network structure can be mathematically represented by using “multi-level programming” principles.
In this paper, we consider a “probabilistic bi-level linear multi-objective programming problem” and its application in enterprise-wide supply chain planning problem where (1) market demand, (2) production capacity of each plant and (3) resource available to all plants for each product are random variables and the constraints may consist of joint probability distributions or not. This probabilistic model is first converted into an equivalent deterministic model in each level, to which fuzzy programming technique is applied to solve the multi-objective nonlinear programming problem to obtain a compromise solution. |
| Author | Aryanezhad, M.B. Sadjadi, S.J. Roghanian, E. |
| Author_xml | – sequence: 1 givenname: E. surname: Roghanian fullname: Roghanian, E. email: E-roghanian@iustarak.ac.ir – sequence: 2 givenname: S.J. surname: Sadjadi fullname: Sadjadi, S.J. email: Sjsadjadi@iust.ac.ir – sequence: 3 givenname: M.B. surname: Aryanezhad fullname: Aryanezhad, M.B. email: Mirarya@iust.ac.ir |
| BackLink | http://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=18768607$$DView record in Pascal Francis |
| BookMark | eNp9kE1LxDAQQIMouH78AG-9eOw6abZpi6dF_IIFL3oTyjQ7XWdJ05LUhf33pq4gePA0ZHgvMO9MHLvekRBXEuYSpL7ZzrEz8wxAx_ccVHYkZrIsVJrrRXUsZgCVThWAOhVnIWwBoNByMRPvy2TwfYMNWw4jm6Th1NKObGLZEfqk-7Qjp32zJTPyjiZ647Hr2G2-TUtdMvZJ-BwGu0_MB7JLBovOReBCnLRoA13-zHPx9nD_eveUrl4en--Wq9SorBjTosll1VC1kG3Zmow0YK4klpnWpKktM8jbAiulYGHMuszXKjdtPAVRg8amUOfi-vDvgMGgbT06w6EePHfo93XsoEsNEycPnPF9CJ7aXwTqKWO9rWPGeso4rWLG6BR_HMMjjty70SPbf83bg0nx9B2Tr4NhcobW7GPMet3zP_YX3JCP4Q |
| CODEN | AMHCBQ |
| CitedBy_id | crossref_primary_10_1007_s10957_025_02647_y crossref_primary_10_1371_journal_pone_0185743 crossref_primary_10_3390_su10093150 crossref_primary_10_1016_j_ins_2013_03_024 crossref_primary_10_1016_j_scs_2022_104258 crossref_primary_10_1007_s10479_014_1544_3 crossref_primary_10_1155_2014_931456 crossref_primary_10_1016_j_agwat_2016_11_006 crossref_primary_10_1016_j_ijepes_2015_08_011 crossref_primary_10_1080_17509653_2014_975166 crossref_primary_10_1007_s12351_010_0085_z crossref_primary_10_1016_j_ejor_2012_11_023 crossref_primary_10_1007_s10845_012_0717_7 crossref_primary_10_1016_j_knosys_2013_03_002 crossref_primary_10_1080_23307706_2018_1487808 crossref_primary_10_1016_j_eswa_2012_03_001 crossref_primary_10_1016_j_asoc_2025_113747 crossref_primary_10_1016_j_ejor_2023_01_008 crossref_primary_10_1108_MD_10_2017_1017 crossref_primary_10_1155_2022_8970549 crossref_primary_10_1016_j_amc_2009_09_053 crossref_primary_10_1007_s13042_011_0055_7 crossref_primary_10_1016_j_sbspro_2012_03_087 crossref_primary_10_1007_s10100_010_0156_5 crossref_primary_10_1007_s10898_022_01227_y crossref_primary_10_1016_j_compchemeng_2021_107409 crossref_primary_10_1016_j_eswa_2012_10_052 crossref_primary_10_1007_s10489_018_1177_3 crossref_primary_10_4028_www_scientific_net_AMR_183_185_1263 crossref_primary_10_1016_j_ejor_2009_09_008 crossref_primary_10_4028_www_scientific_net_AMR_433_440_1506 crossref_primary_10_1016_j_ins_2014_01_024 crossref_primary_10_1016_j_asoc_2009_09_004 crossref_primary_10_1080_0305215X_2012_709512 crossref_primary_10_1155_2013_312527 crossref_primary_10_1016_j_compind_2021_103398 crossref_primary_10_1080_23302674_2023_2258778 crossref_primary_10_1080_00207543_2023_2169382 crossref_primary_10_1016_j_fss_2011_07_006 crossref_primary_10_1007_s10479_016_2324_z crossref_primary_10_1016_j_knosys_2018_05_022 crossref_primary_10_1088_1755_1315_973_1_012006 crossref_primary_10_1007_s12065_023_00890_8 crossref_primary_10_1016_j_tre_2018_04_014 crossref_primary_10_1061__ASCE_CP_1943_5487_0000585 crossref_primary_10_1007_s40815_015_0036_1 crossref_primary_10_1016_j_ins_2013_03_003 crossref_primary_10_1109_ACCESS_2018_2828706 crossref_primary_10_1016_j_compchemeng_2019_01_021 crossref_primary_10_1016_j_amc_2014_09_013 crossref_primary_10_1016_j_ifacol_2017_08_1766 crossref_primary_10_1007_s12652_022_04419_2 crossref_primary_10_1016_j_cherd_2008_12_025 crossref_primary_10_1080_00207540903176705 crossref_primary_10_1007_s00170_013_5316_z crossref_primary_10_1016_j_eswa_2012_08_048 crossref_primary_10_1080_09537287_2012_666857 crossref_primary_10_1142_S0217595923500380 crossref_primary_10_1016_j_ejor_2010_09_025 crossref_primary_10_1016_j_omega_2012_03_007 crossref_primary_10_1002_aic_14616 crossref_primary_10_1007_s12351_010_0090_2 crossref_primary_10_1016_j_tre_2009_05_002 crossref_primary_10_1016_j_mcm_2011_08_006 crossref_primary_10_3233_JIFS_169213 crossref_primary_10_1016_j_cie_2017_06_030 crossref_primary_10_1016_j_cie_2009_06_012 crossref_primary_10_1016_j_compchemeng_2016_03_003 crossref_primary_10_1016_j_cie_2022_108225 crossref_primary_10_1007_s40819_018_0511_0 crossref_primary_10_1016_j_jhazmat_2018_02_007 crossref_primary_10_1007_s13042_012_0126_4 crossref_primary_10_1007_s40092_015_0131_9 crossref_primary_10_1007_s00170_018_3204_2 crossref_primary_10_1007_s10668_023_04324_4 crossref_primary_10_1016_j_asoc_2022_109468 crossref_primary_10_1016_j_ijpe_2016_02_002 crossref_primary_10_1007_s13042_012_0145_1 crossref_primary_10_1016_j_eswa_2012_05_024 crossref_primary_10_1142_S021759591750021X |
| Cites_doi | 10.1016/0377-2217(86)90160-8 10.1016/S0098-1354(00)00496-8 10.1287/mnsc.6.1.73 10.1016/0038-0121(78)90023-X 10.1287/mnsc.17.4.B141 10.1111/j.1540-5915.1981.tb00102.x 10.1021/ie960901+ 10.1016/S0098-1354(00)00617-7 10.1021/ie0100030 10.1021/ie9909284 10.1016/j.compchemeng.2003.09.021 10.1016/0165-0114(81)90019-1 10.1016/S0096-3003(03)00628-3 10.1016/0165-0114(78)90031-3 10.1287/opre.16.3.576 10.1111/j.1540-5915.1980.tb01142.x 10.1016/S0098-1354(00)00469-5 10.1287/opre.24.6.1078 10.1021/ie000668m 10.1016/0377-2217(82)90129-1 10.1016/S0165-0114(98)00070-0 10.1016/S0098-1354(00)00495-6 |
| ContentType | Journal Article |
| Copyright | 2006 2007 INIST-CNRS |
| Copyright_xml | – notice: 2006 – notice: 2007 INIST-CNRS |
| DBID | AAYXX CITATION IQODW |
| DOI | 10.1016/j.amc.2006.10.032 |
| DatabaseName | CrossRef Pascal-Francis |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Mathematics |
| EISSN | 1873-5649 |
| EndPage | 800 |
| ExternalDocumentID | 18768607 10_1016_j_amc_2006_10_032 S0096300306014172 |
| GroupedDBID | --K --M -~X .DC .~1 0R~ 1B1 1RT 1~. 1~5 23M 4.4 457 4G. 5GY 5VS 6J9 7-5 71M 8P~ 9JN AABNK AACTN AAEDT AAEDW AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AAXUO ABAOU ABEFU ABFNM ABFRF ABJNI ABMAC ABXDB ABYKQ ACAZW ACDAQ ACGFO ACGFS ACRLP ADBBV ADEZE ADGUI ADIYS ADMUD AEBSH AEFWE AEKER AENEX AFFNX AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AI. AIEXJ AIGVJ AIKHN AITUG AJBFU AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ ARUGR ASPBG AVWKF AXJTR AZFZN BKOJK BLXMC CS3 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 F5P FDB FEDTE FGOYB FIRID FNPLU FYGXN G-2 G-Q GBLVA HLZ HMJ HVGLF HZ~ IHE J1W KOM LG9 M26 M41 MHUIS MO0 N9A O-L O9- OAUVE OZT P-8 P-9 P2P PC. Q38 R2- RIG RNS ROL RPZ RXW SBC SDF SDG SES SEW SME SPC SPCBC SSW SSZ T5K TAE TN5 VH1 VOH WH7 WUQ X6Y XPP ZMT ~02 ~G- 9DU AATTM AAXKI AAYWO AAYXX ABWVN ACLOT ACRPL ACVFH ADCNI ADNMO AEIPS AEUPX AFJKZ AFPUW AGQPQ AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP CITATION EFKBS ~HD AFXIZ AGCQF AGRNS BNPGV IQODW SSH |
| ID | FETCH-LOGICAL-c327t-7b519be941f8fc2e60a531a8266e6ef8205f7a93304ccd85d35cf003aa606ab73 |
| ISICitedReferencesCount | 128 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000247191700088&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 0096-3003 |
| IngestDate | Mon Jul 21 09:15:37 EDT 2025 Sat Nov 29 06:12:12 EST 2025 Tue Nov 18 21:26:45 EST 2025 Fri Feb 23 02:19:04 EST 2024 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 1 |
| Keywords | Supply chain management Multi-level multi-objective decision-making Bi-level programming Multi-objective decision-making Fuzzy decision-approach Stochastic programming Decision making Optimization method Linear programming Probability distribution Scheduling Nonlinear problems Non linear programming Extremum problem Numerical analysis Applied mathematics Distribution function Probabilistic model Fuzzy decision- approach Random variable Programming theory Mathematical programming |
| Language | English |
| License | https://www.elsevier.com/tdm/userlicense/1.0 CC BY 4.0 |
| LinkModel | OpenURL |
| MergedId | FETCHMERGED-LOGICAL-c327t-7b519be941f8fc2e60a531a8266e6ef8205f7a93304ccd85d35cf003aa606ab73 |
| PageCount | 15 |
| ParticipantIDs | pascalfrancis_primary_18768607 crossref_primary_10_1016_j_amc_2006_10_032 crossref_citationtrail_10_1016_j_amc_2006_10_032 elsevier_sciencedirect_doi_10_1016_j_amc_2006_10_032 |
| PublicationCentury | 2000 |
| PublicationDate | 2007-05-01 |
| PublicationDateYYYYMMDD | 2007-05-01 |
| PublicationDate_xml | – month: 05 year: 2007 text: 2007-05-01 day: 01 |
| PublicationDecade | 2000 |
| PublicationPlace | New York, NY |
| PublicationPlace_xml | – name: New York, NY |
| PublicationTitle | Applied mathematics and computation |
| PublicationYear | 2007 |
| Publisher | Elsevier Inc Elsevier |
| Publisher_xml | – name: Elsevier Inc – name: Elsevier |
| References | Contini (bib5) 1978; 16 Gjerdrum, Shah, Papageorgiou (bib24) 2001; 40 Zimmermann (bib16) 1978; 1 McDonald, Karimi (bib22) 1997; 36 Sullivan, Fitzsimmoms (bib14) 1978; 12 Gupta, Maranas (bib20) 2000; 39 Osman, Abo-Sinna, Amer (bib29) 2004; 153 Sinha, Hulsurkar, Biswal (bib30) 2000; 109 Sakawa (bib31) 1993 Colson, Marcotte, Savard (bib2) 2005 M.E. Flores, D.E. Rivera, V. Smith-Daniels, Supply chain management using model predictive control, in: AIChE Annual Meeting, Los Angeles, 2000. T. Backx, O. Bosgra, W. Marquardt, Towards intentional dynamics in supply chain conscious process operation, in: Proceedings of the Third International Conference on Foundations of Computer-aided Process Operations, 1998. Leberling (bib8) 1981; 6 Stancu-Minasian, Wets (bib13) 1976; 24 Bose, Pekny (bib27) 2000; 24 Charnes, Cooper (bib4) 1959; 6 Narasimhan (bib10) 1980; 11 Hanan (bib6) 1981; 12 Tsiakis, Shah, Pantelides (bib19) 2001; 40 Zhou, Cheng, Hua (bib25) 2000; 24 Emam (bib1) 2005 Kolbin (bib7) 1977 Abdelaziz, Aouni, El Fayedh (bib11) 2005 Gupta, Maranas, McDonald (bib21) 2000; 24 Leclercq (bib9) 1982; 10 Teghem, Dufrance, Thauvoye, Kunch (bib15) 1986; 26 Perea-Lopez, Grossmann, Ydstie, Tahmassebi (bib26) 2000; 24 Bellman, Zadeh (bib3) 1970; 17 Ryu, Dua, Pistikopoulos (bib17) 2004; 28 Lee, Padmanabhan, Whang (bib23) 1997; 38 Sengupta (bib12) 1972 Sakawa (10.1016/j.amc.2006.10.032_bib31) 1993 Stancu-Minasian (10.1016/j.amc.2006.10.032_bib13) 1976; 24 Tsiakis (10.1016/j.amc.2006.10.032_bib19) 2001; 40 Sinha (10.1016/j.amc.2006.10.032_bib30) 2000; 109 Emam (10.1016/j.amc.2006.10.032_bib1) 2005 Colson (10.1016/j.amc.2006.10.032_bib2) 2005 Leclercq (10.1016/j.amc.2006.10.032_bib9) 1982; 10 Kolbin (10.1016/j.amc.2006.10.032_bib7) 1977 Sullivan (10.1016/j.amc.2006.10.032_bib14) 1978; 12 Hanan (10.1016/j.amc.2006.10.032_bib6) 1981; 12 Zhou (10.1016/j.amc.2006.10.032_bib25) 2000; 24 Sengupta (10.1016/j.amc.2006.10.032_bib12) 1972 Lee (10.1016/j.amc.2006.10.032_bib23) 1997; 38 10.1016/j.amc.2006.10.032_bib28 Osman (10.1016/j.amc.2006.10.032_bib29) 2004; 153 Teghem (10.1016/j.amc.2006.10.032_bib15) 1986; 26 Perea-Lopez (10.1016/j.amc.2006.10.032_bib26) 2000; 24 Abdelaziz (10.1016/j.amc.2006.10.032_bib11) 2005 Leberling (10.1016/j.amc.2006.10.032_bib8) 1981; 6 Gupta (10.1016/j.amc.2006.10.032_bib21) 2000; 24 Bellman (10.1016/j.amc.2006.10.032_bib3) 1970; 17 Narasimhan (10.1016/j.amc.2006.10.032_bib10) 1980; 11 Ryu (10.1016/j.amc.2006.10.032_bib17) 2004; 28 Zimmermann (10.1016/j.amc.2006.10.032_bib16) 1978; 1 Charnes (10.1016/j.amc.2006.10.032_bib4) 1959; 6 Gjerdrum (10.1016/j.amc.2006.10.032_bib24) 2001; 40 Contini (10.1016/j.amc.2006.10.032_bib5) 1978; 16 Bose (10.1016/j.amc.2006.10.032_bib27) 2000; 24 McDonald (10.1016/j.amc.2006.10.032_bib22) 1997; 36 Gupta (10.1016/j.amc.2006.10.032_bib20) 2000; 39 10.1016/j.amc.2006.10.032_bib18 |
| References_xml | – volume: 153 start-page: 239 year: 2004 end-page: 252 ident: bib29 article-title: A multi-level non-linear multi-objective decision-making under fuzziness publication-title: Appl. Math. Comput. – volume: 10 start-page: 33 year: 1982 end-page: 41 ident: bib9 article-title: Stochastic programming: an interactive multi-criteria approach publication-title: Eur. J. Oper. Res. – year: 1993 ident: bib31 article-title: Fuzzy Sets and Interactive Multi-Objective Optimization – volume: 6 start-page: 105 year: 1981 end-page: 118 ident: bib8 article-title: On finding compromise solution in multi-criteria problems using the min-operator publication-title: Fuzzy Sets Syst. – volume: 12 start-page: 215 year: 1978 end-page: 220 ident: bib14 article-title: A goal programming model for readiness and optimal deployment of resources publication-title: Socio-Economic Planning Sci. – reference: T. Backx, O. Bosgra, W. Marquardt, Towards intentional dynamics in supply chain conscious process operation, in: Proceedings of the Third International Conference on Foundations of Computer-aided Process Operations, 1998. – volume: 28 start-page: 1121 year: 2004 end-page: 1129 ident: bib17 article-title: A bilevel programming framework for enterprise-wide process networks under uncertainty publication-title: Comput. Chem. Eng. – volume: 36 start-page: 2691 year: 1997 end-page: 2700 ident: bib22 article-title: Planning and scheduling of parallel semicontinuous processes. Part 1. Production planning publication-title: Ind. Eng. Chem. Res. – volume: 109 start-page: 91 year: 2000 end-page: 96 ident: bib30 article-title: Fuzzy programming approach to multi-objective stochastic programming problems when publication-title: Fuzzy Sets Syst. – reference: M.E. Flores, D.E. Rivera, V. Smith-Daniels, Supply chain management using model predictive control, in: AIChE Annual Meeting, Los Angeles, 2000. – year: 2005 ident: bib2 publication-title: Bilevel Programming: A Survey – volume: 6 start-page: 73 year: 1959 end-page: 79 ident: bib4 article-title: Chance constrained programming publication-title: Manage. Sci. – year: 1977 ident: bib7 article-title: Stochastic Programming – volume: 24 start-page: 2613 year: 2000 end-page: 2621 ident: bib21 article-title: Mid-term supply chain planning under demand uncertainty: customer demand satisfaction and inventory management publication-title: Comput. Chem. Eng. – volume: 38 start-page: 93 year: 1997 end-page: 102 ident: bib23 article-title: The bullwhip effect in supply-chains publication-title: Sloan Manage. Rev. – volume: 24 start-page: 1143 year: 2000 end-page: 1149 ident: bib26 article-title: Dynamic modeling and classical control theory for supply chain management publication-title: Comput. Chem. Eng. – volume: 40 start-page: 3585 year: 2001 end-page: 3604 ident: bib19 article-title: Design of multiechelon supply chain networks under demand uncertainty publication-title: Ind. Eng. Chem. Res. – volume: 12 start-page: 522 year: 1981 end-page: 531 ident: bib6 article-title: On fuzzy goal programming publication-title: Decision Sci. – year: 1972 ident: bib12 article-title: Stochastic Programming: Methods and Applications – volume: 39 start-page: 3799 year: 2000 end-page: 3813 ident: bib20 article-title: A two-stage modeling and solution framework for multisite midterm planning under uncertainty publication-title: Ind. Eng. Chem. Res. – start-page: 4 year: 2005 end-page: 6 ident: bib11 article-title: Multi-objective stochastic programming for portfolio selection publication-title: Eur. J. Oper. Res. – volume: 24 start-page: 329 year: 2000 end-page: 335 ident: bib27 article-title: A model predictive framework for planning and scheduling problem: a case study of consumer goods supply chain publication-title: Comput. Chem. Eng. – volume: 16 start-page: 576 year: 1978 end-page: 586 ident: bib5 article-title: A stochastic approach to goal programming publication-title: Oper. Res. – volume: 24 start-page: 1078 year: 1976 end-page: 1119 ident: bib13 article-title: A research bibliography in stochastic programming 1955–1975 publication-title: Oper. Res. – volume: 1 start-page: 45 year: 1978 end-page: 55 ident: bib16 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Sets Syst. – volume: 26 start-page: 5 year: 1986 end-page: 82 ident: bib15 article-title: Strange: an interactive method for multi-objective linear programming under uncertainty publication-title: Eur. J. Oper. Res. – volume: 24 start-page: 1151 year: 2000 end-page: 1158 ident: bib25 article-title: Supply chain optimization of continuous process industries with sustainability considerations publication-title: Comput. Chem. Eng. – volume: 17 start-page: 141 year: 1970 end-page: 164 ident: bib3 article-title: Decision making in a fuzzy environment publication-title: Manage. Sci. – volume: 40 start-page: 1650 year: 2001 end-page: 1660 ident: bib24 article-title: Transfer prices for multienterprise supply chain optimization publication-title: Ind. Eng. Chem. Res. – year: 2005 ident: bib1 article-title: A fuzzy approach for bi-level integer non-linear programming problem publication-title: Appl. Math. Comput. – volume: 11 start-page: 325 year: 1980 end-page: 336 ident: bib10 article-title: Goal programming in a fuzzy environment publication-title: Decision Sci. – volume: 26 start-page: 5 year: 1986 ident: 10.1016/j.amc.2006.10.032_bib15 article-title: Strange: an interactive method for multi-objective linear programming under uncertainty publication-title: Eur. J. Oper. Res. doi: 10.1016/0377-2217(86)90160-8 – volume: 24 start-page: 1151 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib25 article-title: Supply chain optimization of continuous process industries with sustainability considerations publication-title: Comput. Chem. Eng. doi: 10.1016/S0098-1354(00)00496-8 – volume: 6 start-page: 73 year: 1959 ident: 10.1016/j.amc.2006.10.032_bib4 article-title: Chance constrained programming publication-title: Manage. Sci. doi: 10.1287/mnsc.6.1.73 – volume: 12 start-page: 215 year: 1978 ident: 10.1016/j.amc.2006.10.032_bib14 article-title: A goal programming model for readiness and optimal deployment of resources publication-title: Socio-Economic Planning Sci. doi: 10.1016/0038-0121(78)90023-X – volume: 17 start-page: 141 year: 1970 ident: 10.1016/j.amc.2006.10.032_bib3 article-title: Decision making in a fuzzy environment publication-title: Manage. Sci. doi: 10.1287/mnsc.17.4.B141 – start-page: 4 year: 2005 ident: 10.1016/j.amc.2006.10.032_bib11 article-title: Multi-objective stochastic programming for portfolio selection publication-title: Eur. J. Oper. Res. – volume: 12 start-page: 522 year: 1981 ident: 10.1016/j.amc.2006.10.032_bib6 article-title: On fuzzy goal programming publication-title: Decision Sci. doi: 10.1111/j.1540-5915.1981.tb00102.x – ident: 10.1016/j.amc.2006.10.032_bib18 – volume: 36 start-page: 2691 year: 1997 ident: 10.1016/j.amc.2006.10.032_bib22 article-title: Planning and scheduling of parallel semicontinuous processes. Part 1. Production planning publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie960901+ – volume: 24 start-page: 2613 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib21 article-title: Mid-term supply chain planning under demand uncertainty: customer demand satisfaction and inventory management publication-title: Comput. Chem. Eng. doi: 10.1016/S0098-1354(00)00617-7 – year: 1972 ident: 10.1016/j.amc.2006.10.032_bib12 – year: 1977 ident: 10.1016/j.amc.2006.10.032_bib7 – volume: 40 start-page: 3585 year: 2001 ident: 10.1016/j.amc.2006.10.032_bib19 article-title: Design of multiechelon supply chain networks under demand uncertainty publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie0100030 – volume: 39 start-page: 3799 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib20 article-title: A two-stage modeling and solution framework for multisite midterm planning under uncertainty publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie9909284 – year: 2005 ident: 10.1016/j.amc.2006.10.032_bib1 article-title: A fuzzy approach for bi-level integer non-linear programming problem publication-title: Appl. Math. Comput. – volume: 28 start-page: 1121 year: 2004 ident: 10.1016/j.amc.2006.10.032_bib17 article-title: A bilevel programming framework for enterprise-wide process networks under uncertainty publication-title: Comput. Chem. Eng. doi: 10.1016/j.compchemeng.2003.09.021 – volume: 6 start-page: 105 year: 1981 ident: 10.1016/j.amc.2006.10.032_bib8 article-title: On finding compromise solution in multi-criteria problems using the min-operator publication-title: Fuzzy Sets Syst. doi: 10.1016/0165-0114(81)90019-1 – volume: 153 start-page: 239 year: 2004 ident: 10.1016/j.amc.2006.10.032_bib29 article-title: A multi-level non-linear multi-objective decision-making under fuzziness publication-title: Appl. Math. Comput. doi: 10.1016/S0096-3003(03)00628-3 – volume: 1 start-page: 45 year: 1978 ident: 10.1016/j.amc.2006.10.032_bib16 article-title: Fuzzy programming and linear programming with several objective functions publication-title: Fuzzy Sets Syst. doi: 10.1016/0165-0114(78)90031-3 – volume: 16 start-page: 576 year: 1978 ident: 10.1016/j.amc.2006.10.032_bib5 article-title: A stochastic approach to goal programming publication-title: Oper. Res. doi: 10.1287/opre.16.3.576 – volume: 11 start-page: 325 year: 1980 ident: 10.1016/j.amc.2006.10.032_bib10 article-title: Goal programming in a fuzzy environment publication-title: Decision Sci. doi: 10.1111/j.1540-5915.1980.tb01142.x – volume: 24 start-page: 329 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib27 article-title: A model predictive framework for planning and scheduling problem: a case study of consumer goods supply chain publication-title: Comput. Chem. Eng. doi: 10.1016/S0098-1354(00)00469-5 – volume: 24 start-page: 1078 year: 1976 ident: 10.1016/j.amc.2006.10.032_bib13 article-title: A research bibliography in stochastic programming 1955–1975 publication-title: Oper. Res. doi: 10.1287/opre.24.6.1078 – volume: 40 start-page: 1650 year: 2001 ident: 10.1016/j.amc.2006.10.032_bib24 article-title: Transfer prices for multienterprise supply chain optimization publication-title: Ind. Eng. Chem. Res. doi: 10.1021/ie000668m – year: 2005 ident: 10.1016/j.amc.2006.10.032_bib2 – year: 1993 ident: 10.1016/j.amc.2006.10.032_bib31 – volume: 10 start-page: 33 year: 1982 ident: 10.1016/j.amc.2006.10.032_bib9 article-title: Stochastic programming: an interactive multi-criteria approach publication-title: Eur. J. Oper. Res. doi: 10.1016/0377-2217(82)90129-1 – volume: 38 start-page: 93 year: 1997 ident: 10.1016/j.amc.2006.10.032_bib23 article-title: The bullwhip effect in supply-chains publication-title: Sloan Manage. Rev. – volume: 109 start-page: 91 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib30 article-title: Fuzzy programming approach to multi-objective stochastic programming problems when bi’s follow joint normal distribution publication-title: Fuzzy Sets Syst. doi: 10.1016/S0165-0114(98)00070-0 – ident: 10.1016/j.amc.2006.10.032_bib28 – volume: 24 start-page: 1143 year: 2000 ident: 10.1016/j.amc.2006.10.032_bib26 article-title: Dynamic modeling and classical control theory for supply chain management publication-title: Comput. Chem. Eng. doi: 10.1016/S0098-1354(00)00495-6 |
| SSID | ssj0007614 |
| Score | 2.269118 |
| Snippet | Bi-level programming, a tool for modeling decentralized decisions, consists of the objective(s) of the leader at its first level and that is of the follower at... |
| SourceID | pascalfrancis crossref elsevier |
| SourceType | Index Database Enrichment Source Publisher |
| StartPage | 786 |
| SubjectTerms | Bi-level programming Exact sciences and technology Fuzzy decision-approach Mathematical analysis Mathematics Multi-level multi-objective decision-making Multi-objective decision-making Numerical analysis Numerical analysis. Scientific computation Numerical methods in mathematical programming, optimization and calculus of variations Sciences and techniques of general use Stochastic programming Supply chain management |
| Title | A probabilistic bi-level linear multi-objective programming problem to supply chain planning |
| URI | https://dx.doi.org/10.1016/j.amc.2006.10.032 |
| Volume | 188 |
| WOSCitedRecordID | wos000247191700088&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVESC databaseName: Elsevier SD Freedom Collection Journals 2021 customDbUrl: eissn: 1873-5649 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0007614 issn: 0096-3003 databaseCode: AIEXJ dateStart: 19950101 isFulltext: true titleUrlDefault: https://www.sciencedirect.com providerName: Elsevier |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3Pa9swFBZZusNGKfvJunVFh51WbBzbsuxjVlK2QsvYOshhYJ5kuU1InJCkpe15f_ieLMuOU1rWwy4mMbHs-H16-vT06T1CPoUhy5Qu386FJ5xQQeAA0lZH-T0ZZ1wImZtiE_z0NB4Ok--dzh-7F-Zqwosivr5O5v_V1HgOja23zj7C3HWjeAI_o9HxiGbH4z8Zvq81V6JMnKtzMB-IkTPRyqADTShhYSSEzkyMjauzCq2p2ZZelpfRhHSpy33e6I3BWmdelTZap7KWv07rxK9Lu0luftle4P8xO7-AYmRirQO3jupANoaslBP8dI_dBns3UKjbCwO-E_eL2wpN8EYIaN1tooV1XtB2t_EdXBnnyW1SbDMOlxlM77p4E20YuzCVZi1Ji_OqGGkrnfbGMFeLD62ubZxiE7oMZ4TfU2ziCdnyOUviLtnqfxsMj-sRnUcmR7z9O3Z1vNQJbjzHffxmew5L7HW5KZeyxmHOXpCdavJB-wY0L0lHFa_I85PGgK_J7z5twYda-FADH7oBH7oGH1rBh65m1MCHlvChFj5vyK-jwdnhV6eqwOHIwOcr7MBI8IVKwl4e59JXkQfoswGnpJGKVI7skeUcypiYlFnMsoDJHF8QAM6LQfDgLekWs0K9IxR5IwCTgWR5HPpelkQSehlIFogeMB7uEs--t1RW6el1lZRJeq-9dsnn-pK5yc3y0I9Da4y0IpeGNKYIrIcu228ZrrkR0og48vj7xzzEB_Ks6Sd7pLtaXKqP5Km8Wo2Wi_0Kdn8BdhWnWw |
| linkProvider | Elsevier |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+probabilistic+bi-level+linear+multi-objective+programming+problem+to+supply+chain+planning&rft.jtitle=Applied+mathematics+and+computation&rft.au=Roghanian%2C+E.&rft.au=Sadjadi%2C+S.J.&rft.au=Aryanezhad%2C+M.B.&rft.date=2007-05-01&rft.issn=0096-3003&rft.volume=188&rft.issue=1&rft.spage=786&rft.epage=800&rft_id=info:doi/10.1016%2Fj.amc.2006.10.032&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_amc_2006_10_032 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0096-3003&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0096-3003&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0096-3003&client=summon |