Lee, J., Li, J., & Horst, J. A. (2018). Serial production lines with waiting time limits: Bernoulli reliability model. IEEE transactions on engineering management, 65(2), 316-329. https://doi.org/10.1109/TEM.2017.2769059
Citace podle Chicago (17th ed.)Lee, Jun-Ho, Jingshan Li, a John A. Horst. "Serial Production Lines with Waiting Time Limits: Bernoulli Reliability Model." IEEE Transactions on Engineering Management 65, no. 2 (2018): 316-329. https://doi.org/10.1109/TEM.2017.2769059.
Citace podle MLA (9th ed.)Lee, Jun-Ho, et al. "Serial Production Lines with Waiting Time Limits: Bernoulli Reliability Model." IEEE Transactions on Engineering Management, vol. 65, no. 2, 2018, pp. 316-329, https://doi.org/10.1109/TEM.2017.2769059.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..