Lee, J., Li, J., & Horst, J. A. (2018). Serial production lines with waiting time limits: Bernoulli reliability model. IEEE transactions on engineering management, 65(2), 316-329. https://doi.org/10.1109/TEM.2017.2769059
Chicago-Zitierstil (17. Ausg.)Lee, Jun-Ho, Jingshan Li, und John A. Horst. "Serial Production Lines with Waiting Time Limits: Bernoulli Reliability Model." IEEE Transactions on Engineering Management 65, no. 2 (2018): 316-329. https://doi.org/10.1109/TEM.2017.2769059.
MLA-Zitierstil (9. Ausg.)Lee, Jun-Ho, et al. "Serial Production Lines with Waiting Time Limits: Bernoulli Reliability Model." IEEE Transactions on Engineering Management, vol. 65, no. 2, 2018, pp. 316-329, https://doi.org/10.1109/TEM.2017.2769059.
Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.