Single machine batch scheduling with two non-disjoint agents and splitable jobs

We investigate the scheduling problem on a single bounded parallel-batch machine where jobs belong to two non-disjoint agents (called agent A and agent B) and are of equal length but different size. Each job’s size can be arbitrarily split into two parts and processed in the consecutive batches. It...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Journal of combinatorial optimization Ročník 40; číslo 3; s. 774 - 795
Hlavní autoři: Geng, Zhichao, Liu, Jiayu
Médium: Journal Article
Jazyk:angličtina
Vydáno: New York Springer US 01.10.2020
Springer Nature B.V
Témata:
ISSN:1382-6905, 1573-2886
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:We investigate the scheduling problem on a single bounded parallel-batch machine where jobs belong to two non-disjoint agents (called agent A and agent B) and are of equal length but different size. Each job’s size can be arbitrarily split into two parts and processed in the consecutive batches. It is permitted to process the jobs from different agents in a common batch. We show that it is unary NP-hard for the problem of minimizing the total weighted completion time of the jobs of agent A subject to the maximum cost of the jobs of agent B being upper bounded by a given threshold. For the case of the jobs of agent A having identical weights, we study the version of Pareto problem, and give a polynomial-time algorithm to generate all Pareto optimal points and a Pareto optimal schedule corresponding to each Pareto optimal point.