Improved Approximation Schemes for Early Work Scheduling on Identical Parallel Machines with a Common Due Date
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs that are executed before a common due date. By preprocessing and constructing an auxiliary instance which has several good properties, for any d...
Uložené v:
| Vydané v: | Journal of the Operations Research Society of China (Internet) Ročník 12; číslo 2; s. 341 - 350 |
|---|---|
| Hlavný autor: | |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Berlin/Heidelberg
Springer Berlin Heidelberg
01.06.2024
Springer Nature B.V |
| Predmet: | |
| ISSN: | 2194-668X, 2194-6698 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Abstract | We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs that are executed before a common due date. By preprocessing and constructing an auxiliary instance which has several good properties, for any desired accuracy
ε
, we propose an efficient polynomial time approximation scheme with running time
O
f
(
1
/
ε
n
)
, where
n
is the number of jobs and
f
(
1
/
ε
)
is exponential in
1
/
ε
, and a fully polynomial time approximation scheme with running time
O
1
ε
2
m
+
1
+
n
when the number of machines is fixed. |
|---|---|
| AbstractList | We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs that are executed before a common due date. By preprocessing and constructing an auxiliary instance which has several good properties, for any desired accuracy
ε
, we propose an efficient polynomial time approximation scheme with running time
O
f
(
1
/
ε
n
)
, where
n
is the number of jobs and
f
(
1
/
ε
)
is exponential in
1
/
ε
, and a fully polynomial time approximation scheme with running time
O
1
ε
2
m
+
1
+
n
when the number of machines is fixed. We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs that are executed before a common due date. By preprocessing and constructing an auxiliary instance which has several good properties, for any desired accuracy ε, we propose an efficient polynomial time approximation scheme with running time Of(1/εn), where n is the number of jobs and f(1/ε) is exponential in 1/ε, and a fully polynomial time approximation scheme with running time O1ε2m+1+n when the number of machines is fixed. |
| Author | Li, Wei-Dong |
| Author_xml | – sequence: 1 givenname: Wei-Dong orcidid: 0000-0003-3094-4347 surname: Li fullname: Li, Wei-Dong email: weidongmath@126.com organization: School of Mathematics and Statistics, Yunnan University |
| BookMark | eNp9kFFLwzAQx4NMcM59AZ8CPlcvadJ2j2ObOpgoqOhbSNN0i7bpTFp13964iYIPe8px_H-Xu98x6tnGaoROCZwTgPTCM4iBR0BpBMCARpsD1KdkxKIkGWW93zp7PkJD700OnGacJ0D6yM7rtWvedYHH61B8mlq2prH4Xq10rT0uG4dn0lUb_NS412276CpjlziE5oW2rVGywnfSyarSFb6RamVsAD9Mu8IST5q6Dslpp_FUtvoEHZay8nr48w7Q4-XsYXIdLW6v5pPxIlIxGbWRTMN6DMo0TjNecEYp00WuVC4hpaOc8TyjiSI5pyQ0ISeU5QCgyqyQCUtoPEBnu7nhprdO-1a8NJ2z4UsRVCWUE5bykMp2KeUa750uhTLt9v7WSVMJAuJbsNgJFkGw2AoWm4DSf-jaBXdusx-Kd5APYbvU7m-rPdQX8ySQWg |
| CitedBy_id | crossref_primary_10_1109_ACCESS_2022_3225448 crossref_primary_10_1016_j_cie_2022_108386 crossref_primary_10_1007_s40305_023_00511_2 crossref_primary_10_1016_j_cor_2025_107144 crossref_primary_10_3390_computation12040068 crossref_primary_10_1007_s10878_022_00981_9 |
| Cites_doi | 10.1016/j.ejor.2020.03.032 10.1016/j.ejor.2019.12.003 10.1016/j.dam.2020.05.023 10.1016/j.cie.2020.106449 10.1007/s10957-017-1147-7 10.1007/s10951-015-0464-7 10.1016/j.omega.2010.06.006 10.1287/moor.8.4.538 |
| ContentType | Journal Article |
| Copyright | Operations Research Society of China, Periodicals Agency of Shanghai University, Science Press, and Springer-Verlag GmbH Germany, part of Springer Nature 2022 Operations Research Society of China, Periodicals Agency of Shanghai University, Science Press, and Springer-Verlag GmbH Germany, part of Springer Nature 2022. |
| Copyright_xml | – notice: Operations Research Society of China, Periodicals Agency of Shanghai University, Science Press, and Springer-Verlag GmbH Germany, part of Springer Nature 2022 – notice: Operations Research Society of China, Periodicals Agency of Shanghai University, Science Press, and Springer-Verlag GmbH Germany, part of Springer Nature 2022. |
| DBID | AAYXX CITATION 3V. 7RO 7XB 8AI 8FE 8FG 8FK ABJCF ABUWG AFKRA AXJJW BENPR BEZIV BGLVJ CCPQU DWQXO FREBS FRNLG HCIFZ K60 K6~ L6V M7S PHGZM PHGZT PKEHL PQBIZ PQBZA PQEST PQGLB PQQKQ PQUKI PTHSS Q9U |
| DOI | 10.1007/s40305-022-00402-y |
| DatabaseName | CrossRef ProQuest Central (Corporate) Asian Business Database ProQuest Central (purchase pre-March 2016) Asian Business Database (Alumni Edition) ProQuest SciTech Collection ProQuest Technology Collection ProQuest Central (Alumni) (purchase pre-March 2016) Materials Science & Engineering Collection ProQuest Central (Alumni) ProQuest Central UK/Ireland Asian & European Business Collection ProQuest Central Business Premium Collection ProQuest Technology Collection ProQuest One Community College ProQuest Central Korea Asian & European Business Collection (Alumni) Business Premium Collection (Alumni) SciTech Premium Collection ProQuest Business Collection (Alumni Edition) ProQuest Business Collection ProQuest Engineering Collection Engineering Database ProQuest Central Premium ProQuest One Academic ProQuest One Academic Middle East (New) ProQuest One Business ProQuest One Business (Alumni) ProQuest One Academic Eastern Edition (DO NOT USE) ProQuest One Applied & Life Sciences ProQuest One Academic (retired) ProQuest One Academic UKI Edition Engineering Collection ProQuest Central Basic |
| DatabaseTitle | CrossRef ProQuest Business Collection (Alumni Edition) ProQuest One Business Technology Collection ProQuest One Academic Middle East (New) ProQuest Asian Business & Reference Asian & European Business Collection ProQuest Central (Alumni Edition) SciTech Premium Collection ProQuest One Community College Asian & European Business Collection (Alumni) ProQuest Central ProQuest One Applied & Life Sciences ProQuest Asian Business and Reference (Alumni Edition) ProQuest Engineering Collection ProQuest Central Korea ProQuest Central (New) Engineering Collection Business Premium Collection Engineering Database ProQuest Central Basic ProQuest One Academic Eastern Edition ProQuest Technology Collection ProQuest SciTech Collection ProQuest Business Collection ProQuest One Academic UKI Edition Materials Science & Engineering Collection ProQuest One Business (Alumni) ProQuest One Academic ProQuest Central (Alumni) Business Premium Collection (Alumni) ProQuest One Academic (New) |
| DatabaseTitleList | ProQuest Business Collection (Alumni Edition) |
| Database_xml | – sequence: 1 dbid: AXJJW name: Asian & European Business Collection (ProQuest) url: https://search.proquest.com/asianeuropeanbusiness sourceTypes: Aggregation Database |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering Mathematics |
| EISSN | 2194-6698 |
| EndPage | 350 |
| ExternalDocumentID | 10_1007_s40305_022_00402_y |
| GeographicLocations | China |
| GeographicLocations_xml | – name: China |
| GrantInformation_xml | – fundername: National Natural Science Foundation of China grantid: 12071417 funderid: http://dx.doi.org/10.13039/501100001809 |
| GroupedDBID | -EM 0R~ 30V 4.4 406 96X AAAVM AACDK AAHNG AAIAL AAJBT AAJKR AANZL AARHV AARTL AASML AATNV AATVU AAUYE AAWCG AAYIU AAYQN AAYTO AAZMS ABAKF ABBXA ABDZT ABECU ABFTV ABJCF ABJNI ABJOX ABKCH ABMQK ABQBU ABTEG ABTKH ABTMW ABUWG ABXPI ACAOD ACDTI ACGFS ACHSB ACIWK ACKNC ACMLO ACOKC ACPIV ACZOJ ADHHG ADHIR ADINQ ADKNI ADRFC ADURQ ADYFF ADZKW AEBTG AEFQL AEGNC AEJHL AEJRE AEMSY AEOHA AEPYU AESKC AETCA AEVLU AEXYK AFBBN AFKRA AFLOW AFQWF AFWTZ AFZKB AGAYW AGDGC AGJBK AGMZJ AGQEE AGQMX AGRTI AGWZB AGYKE AHAVH AHBYD AHKAY AHSBF AHYZX AIAKS AIGIU AILAN AITGF AJBLW AJRNO AJZVZ AKLTO ALFXC ALMA_UNASSIGNED_HOLDINGS AMKLP AMXSW AMYLF AMYQR ANMIH ASPBG AUKKA AVWKF AVXWI AXJJW AXYYD AZFZN BAPOH BENPR BEZIV BGLVJ BGNMA CCPQU DNIVK DPUIP DWQXO EBLON EBS EIOEI EJD ESBYG FEDTE FERAY FIGPU FINBP FNLPD FRNLG FRRFC FSGXE FYJPI GGCAI GGRSB GJIRD HCIFZ HG6 HMJXF HQYDN HRMNR HVGLF HZ~ I0C IKXTQ IWAJR J-C JBSCW JCJTX JZLTJ KOV LLZTM M4Y M7S NPVJJ NQJWS NU0 O9- O93 O9J PQBIZ PQBZA PQQKQ PT4 PTHSS RLLFE ROL RSV SCL SHX SJYHP SNE SNPRN SNX SOHCF SOJ SPISZ SRMVM SSLCW STPWE TSG UG4 UOJIU UTJUX UZXMN VFIZW W48 ZMTXR AAYXX ABBRH ABDBE ABFSG ABRTQ ACSTC AEZWR AFDZB AFFHD AFHIU AFOHR AHPBZ AHWEU AIXLP ATHPR AYFIA CITATION PHGZM PHGZT PQGLB 3V. 7RO 7XB 8AI 8FE 8FG 8FK K60 K6~ L6V PKEHL PQEST PQUKI Q9U |
| ID | FETCH-LOGICAL-c319t-a755640f73785d54224edbccba0729b45b826c1b521ccb0b124b000cf8da64623 |
| IEDL.DBID | RSV |
| ISICitedReferencesCount | 11 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000812057900001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 2194-668X |
| IngestDate | Wed Nov 05 04:18:48 EST 2025 Tue Nov 18 21:09:29 EST 2025 Sat Nov 29 05:55:49 EST 2025 Fri Feb 21 02:40:26 EST 2025 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 2 |
| Keywords | 90B35 Fully polynomial time approximation scheme Polynomial time approximation scheme Scheduling 68M20 Early work Efficient polynomial time approximation scheme |
| Language | English |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c319t-a755640f73785d54224edbccba0729b45b826c1b521ccb0b124b000cf8da64623 |
| Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ORCID | 0000-0003-3094-4347 |
| PQID | 3056251475 |
| PQPubID | 2043982 |
| PageCount | 10 |
| ParticipantIDs | proquest_journals_3056251475 crossref_citationtrail_10_1007_s40305_022_00402_y crossref_primary_10_1007_s40305_022_00402_y springer_journals_10_1007_s40305_022_00402_y |
| PublicationCentury | 2000 |
| PublicationDate | 20240600 2024-06-00 20240601 |
| PublicationDateYYYYMMDD | 2024-06-01 |
| PublicationDate_xml | – month: 6 year: 2024 text: 20240600 |
| PublicationDecade | 2020 |
| PublicationPlace | Berlin/Heidelberg |
| PublicationPlace_xml | – name: Berlin/Heidelberg – name: Heidelberg |
| PublicationTitle | Journal of the Operations Research Society of China (Internet) |
| PublicationTitleAbbrev | J. Oper. Res. Soc. China |
| PublicationYear | 2024 |
| Publisher | Springer Berlin Heidelberg Springer Nature B.V |
| Publisher_xml | – name: Springer Berlin Heidelberg – name: Springer Nature B.V |
| References | Chen, Liang, Sterna, Wang, Błażewicz (CR1) 2020; 284 Chen, Sterna, Han, Błażewicz (CR6) 2016; 19 Chen, Kovalev, Liu, Sterna, Chalamon, Błażewicz (CR7) 2020 Györgyi, Kis (CR5) 2020; 286 Sterna, Czerniachowska (CR2) 2017; 174 Chen, Wang, Xie, Zhang, Sterna, Błażewicz (CR4) 2020; 144 Sterna (CR3) 2011; 39 Lenstra (CR8) 1983; 8 P Györgyi (402_CR5) 2020; 286 X Chen (402_CR6) 2016; 19 X Chen (402_CR1) 2020; 284 HW Lenstra Jr (402_CR8) 1983; 8 M Sterna (402_CR2) 2017; 174 M Sterna (402_CR3) 2011; 39 X Chen (402_CR4) 2020; 144 X Chen (402_CR7) 2020 |
| References_xml | – volume: 286 start-page: 129 issue: 1 year: 2020 end-page: 137 ident: CR5 article-title: A common approximation framework for early work, late work, and resource leveling problems publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2020.03.032 – volume: 284 start-page: 67 issue: 1 year: 2020 end-page: 74 ident: CR1 article-title: Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2019.12.003 – year: 2020 ident: CR7 article-title: Semi-online scheduling on two identical machines with a common due date to maximize total early work publication-title: Discrete. Appl. Math. doi: 10.1016/j.dam.2020.05.023 – volume: 144 start-page: 106449 year: 2020 ident: CR4 article-title: Exact and heuristic algorithms for scheduling on two identical machines with early work maximization publication-title: Comput. Ind. Eng. doi: 10.1016/j.cie.2020.106449 – volume: 174 start-page: 927 year: 2017 end-page: 944 ident: CR2 article-title: Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work publication-title: J. Optimiz. Theory. App. doi: 10.1007/s10957-017-1147-7 – volume: 19 start-page: 729 year: 2016 end-page: 736 ident: CR6 article-title: Scheduling on parallel identical machines with late work criterion: offline and online cases publication-title: J. Sched. doi: 10.1007/s10951-015-0464-7 – volume: 39 start-page: 120 issue: 2 year: 2011 end-page: 129 ident: CR3 article-title: A survey of scheduling problems with late work criteria publication-title: Omega doi: 10.1016/j.omega.2010.06.006 – volume: 8 start-page: 538 issue: 4 year: 1983 end-page: 548 ident: CR8 article-title: Integer programming with a fixed number of variables publication-title: Math. Oper. Res. doi: 10.1287/moor.8.4.538 – volume: 8 start-page: 538 issue: 4 year: 1983 ident: 402_CR8 publication-title: Math. Oper. Res. doi: 10.1287/moor.8.4.538 – volume: 39 start-page: 120 issue: 2 year: 2011 ident: 402_CR3 publication-title: Omega doi: 10.1016/j.omega.2010.06.006 – year: 2020 ident: 402_CR7 publication-title: Discrete. Appl. Math. doi: 10.1016/j.dam.2020.05.023 – volume: 284 start-page: 67 issue: 1 year: 2020 ident: 402_CR1 publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2019.12.003 – volume: 19 start-page: 729 year: 2016 ident: 402_CR6 publication-title: J. Sched. doi: 10.1007/s10951-015-0464-7 – volume: 286 start-page: 129 issue: 1 year: 2020 ident: 402_CR5 publication-title: Eur. J. Oper. Res. doi: 10.1016/j.ejor.2020.03.032 – volume: 174 start-page: 927 year: 2017 ident: 402_CR2 publication-title: J. Optimiz. Theory. App. doi: 10.1007/s10957-017-1147-7 – volume: 144 start-page: 106449 year: 2020 ident: 402_CR4 publication-title: Comput. Ind. Eng. doi: 10.1016/j.cie.2020.106449 |
| SSID | ssib052855601 ssj0002962227 |
| Score | 2.3405488 |
| Snippet | We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs... |
| SourceID | proquest crossref springer |
| SourceType | Aggregation Database Enrichment Source Index Database Publisher |
| StartPage | 341 |
| SubjectTerms | Accuracy Algorithms Approximation Employment Management Science Mathematics Mathematics and Statistics Operations Research Polynomials Preempting Schedules Scheduling Workloads |
| SummonAdditionalLinks | – databaseName: ProQuest Central dbid: BENPR link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV07T8MwED5BywADb0R5yQMbWDSNnTgTKpSKhariIXWLYjtFSFCgLQj-PXeO0wISXVgT21LyXewv9_gO4FAJEwZWWW7rkeIi0ZYrmwgehrGN-lLLKOu7ZhNxp6N6vaTrHW4jn1ZZ7oluo7bPhnzkJ0R18SwWsTx9eeXUNYqiq76FxjxUSalMVKB6dtHpXpcWJRtKysgHVmlvbiQRFX9SxzkczqNI9XwljaunE2T-nBLcybgb_PPnaTWloL-ipu4waq_89zFWYdnTUNYs7GYN5vLBOix9EyfcgEHhb8gta5Lu-MdDUeTIbhDmp3zEkO0yJ4_MyOHuLltKa79nOKio_0X8WTcbUruWR3bl0jZxIrl-WcaoNAVHtt5y1kLCuwl37Yvb80vuuzNwRDcZ8yzGVyvq_TiMlbRSIBfIrTZGZyRGroXU-OdiAo38AC_WNRIJYhymr2wWCWRdW1AZPA_ybWBG6MQEOcKFZDRDypSpMKAAHinJWKVqEJQopMZLl1MHjcd0IrrskEsRudQhl37W4Ggy56UQ7pg5eq-EK_Uf8SidYlWD4xLw6e2_V9uZvdouLDaQGhUJZ3tQGQ_f8n1YMO_jh9HwwJvwFzeu880 priority: 102 providerName: ProQuest |
| Title | Improved Approximation Schemes for Early Work Scheduling on Identical Parallel Machines with a Common Due Date |
| URI | https://link.springer.com/article/10.1007/s40305-022-00402-y https://www.proquest.com/docview/3056251475 |
| Volume | 12 |
| WOSCitedRecordID | wos000812057900001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVPQU databaseName: Asian & European Business Collection (ProQuest) customDbUrl: eissn: 2194-6698 dateEnd: 20241207 omitProxy: false ssIdentifier: ssj0002962227 issn: 2194-668X databaseCode: AXJJW dateStart: 20130301 isFulltext: true titleUrlDefault: https://search.proquest.com/asianeuropeanbusiness providerName: ProQuest – providerCode: PRVPQU databaseName: Engineering Database (subscription) customDbUrl: eissn: 2194-6698 dateEnd: 20241207 omitProxy: false ssIdentifier: ssj0002962227 issn: 2194-668X databaseCode: M7S dateStart: 20130301 isFulltext: true titleUrlDefault: http://search.proquest.com providerName: ProQuest – providerCode: PRVPQU databaseName: ProQuest Central - New (Subscription) customDbUrl: eissn: 2194-6698 dateEnd: 20241207 omitProxy: false ssIdentifier: ssj0002962227 issn: 2194-668X databaseCode: BENPR dateStart: 20130301 isFulltext: true titleUrlDefault: https://www.proquest.com/central providerName: ProQuest – providerCode: PRVAVX databaseName: Springer LINK customDbUrl: eissn: 2194-6698 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0002962227 issn: 2194-668X databaseCode: RSV dateStart: 20130301 isFulltext: true titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22 providerName: Springer Nature |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LT8MwDLZ4HeDAGzEeUw7cINK6Jm16HLAJIW2aNh67VU3SISQYaB0I_j122o6HAAlOVdMkqmwn-ZLYnwEOlDC-Z5XlthYoLiJtubKR4L4f2mAotQySoUs2EXY6ajCIukVQWFZ6u5dXkm6mnga7CbJNTt7nZHl1_joL87jcKRqOvf5VaUWyrqQMistUmo_rUUABn5RlDnfsPAjUoIie-b7bzyvUO-z8clPqFqDWyv9-fRWWC8DJGrmFrMFMOlqHpQ80hPjWnnK3Zhswys8ZUssaxDf-cpsHN7I-qvc-zRiiXOZokRkdtLtiS-7sNwwr5XG_qHfWTcaUpuWOtZ27JjakI1-WMApJwZqnTyk7RaC7CZet5sXJGS-yMnDUajThSYjiFbVh6IdKWikQA6RWG6MTIiHXQmrcsRhPIy7AwppGAEFIwwyVTQKBaGsL5kYPo3QbmBE6Ml6KKkMQmiBUSpTv0cUdMchYpSrglZqITUFZTpkz7uIp2bKTbIySjZ1k49cKHE7bPOaEHb_W3isVHBeDN4tpV4WwT4SyAkelQt8__9zbzt-q78JiHSFS7ni2B3OT8VO6DwvmeXKbjasw3xicn1_j87jZ6faq5JXarzpTfwOQu_Hl |
| linkProvider | Springer Nature |
| linkToHtml | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V1NT9wwEB2hpRLtgRbaqktp60N7AotNYjvOAaFVt4jPFRKg7i3EH1shwQK7S9v9U_xGZpyEpUjlxoGr41iJ8-x58cy8AfiqhU0ipx13LaW5yIzj2mWCJ0nqVF8aqYp-KDaRdru618sOZuCmzoWhsMp6TwwbtbuwdEa-RlQXbbFI5cblFaeqUeRdrUtolLDY9ZM_-Ms2Wt_u4Pf9FsebP46-b_GqqgDHp8rGvEilVKLVT5NUSycF2jDvjLWmIBFtI6RBxm0jg3YNG1sGDSBZStvXrlBCkdABbvmzIsEfqQbMtns7Oz9rBMtYS6kqRy7ZgjhTlGxKFe4inAGldK_K3An5e4KWG6eAelpMMZ_8ax2nlPeBlzYYv83Xz23a3sB8RbNZu1wXCzDjB4vw6p744lsYlOcp3rE26ar_PS2TONkhwvjcjxiyeRbknxk5FEKzo7D9Xww7lfnNiG92UAypHM0Z2w9hqXgjHW2zglHqDfbsXHvWQUL_Do6f5IXfQ2NwMfAfgFlhMht5hAeS7QIpYaGTiByUpJTjtG5CVH_13FbS7FQh5Cy_E5UOSMkRKXlASj5pwsrdPZelMMmjvZdreOTVJjXKp9howmoNsOnl_4-29PhoX2Bu62h_L9_b7u5-hJcx0sAyuG4ZGuPhtf8EL-zv8elo-LlaPgxOnhp6t6oST5o |
| linkToPdf | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1LT8MwDLZ4CcGBN2I8c-AGEeuatOkRMSYQME3iod2qJmnRJChoGwj-PXbajocACXFs6kSq7bZfYvszwK4SxvesstzWA8VFpC1XNhLc90MbZFLLIMlcs4mw3VbdbtT5UMXvst2rkGRR00AsTfnw4NFmB6PCN0F-yikTnbywwV_HYVJQ0yDar1_eVB4lG0rKoAys0re5EQVU_Ekd53D3zoNAdctKmu-X_fy3eoegX6Km7mfUmv__YyzAXAlE2WHhOYswluZLMPuBnhCvLkacroNlyIvzh9SyQ-Ihf-kVRY_sEs1-nw4Yol_m6JIZHcC7YUtp7rcMhYp6YPQH1kn61L7ljl24NE6cSEfBLGFUqoKSzaeUNREAr8B16_jq6ISX3Ro4Wjsa8iREVYt6FvqhklYKxAap1cbohMjJtZAadzLG04gXcLCuEVgQAjGZskkgEIWtwkT-kKdrwIzQkfFSNB-C0wQhVKJ8jwJ6xCxjlaqBV1klNiWVOXXUuItHJMxOszFqNnaajV9rsDea81gQefwqvVkZOy5f6kFMuy2EgyKUNdivjPt---fV1v8mvgPTnWYrPj9tn23ATANRVJGbtgkTw_5TugVT5nnYG_S3na-_AXUW-XQ |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Improved+Approximation+Schemes+for+Early+Work+Scheduling+on+Identical+Parallel+Machines+with+a+Common+Due+Date&rft.jtitle=Journal+of+the+Operations+Research+Society+of+China+%28Internet%29&rft.au=Li%2C+Wei-Dong&rft.date=2024-06-01&rft.pub=Springer+Berlin+Heidelberg&rft.issn=2194-668X&rft.eissn=2194-6698&rft.volume=12&rft.issue=2&rft.spage=341&rft.epage=350&rft_id=info:doi/10.1007%2Fs40305-022-00402-y&rft.externalDocID=10_1007_s40305_022_00402_y |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2194-668X&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2194-668X&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2194-668X&client=summon |