A PTAS for non-resumable open shop scheduling with an availability constraint
Shop scheduling problem is one of the most classical problems in combinatorial optimization. In this paper, we study two-machine open shop scheduling problem, provided that one machine is subject to maintenance period which has to be performed in a fixed time interval. The target is to minimize the...
Gespeichert in:
| Veröffentlicht in: | Journal of combinatorial optimization Jg. 43; H. 2; S. 350 - 362 |
|---|---|
| Hauptverfasser: | , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
New York
Springer US
01.03.2022
Springer Nature B.V |
| Schlagworte: | |
| ISSN: | 1382-6905, 1573-2886 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Abstract | Shop scheduling problem is one of the most classical problems in combinatorial optimization. In this paper, we study two-machine open shop scheduling problem, provided that one machine is subject to maintenance period which has to be performed in a fixed time interval. The target is to minimize the makespan. This paper considers non-resumable scenario, i.e., if a job which starts before the maintenance period cannot be completed before the maintenance period, then it must be restarted after the interval from scratch. We only discuss the case that the maintenance period is performed on the first machine, while the case of the maintenance period on the second machine is symmetric. We obtain a polynomial time approximation scheme, which is better than the best previous result
4
3
. |
|---|---|
| AbstractList | Shop scheduling problem is one of the most classical problems in combinatorial optimization. In this paper, we study two-machine open shop scheduling problem, provided that one machine is subject to maintenance period which has to be performed in a fixed time interval. The target is to minimize the makespan. This paper considers non-resumable scenario, i.e., if a job which starts before the maintenance period cannot be completed before the maintenance period, then it must be restarted after the interval from scratch. We only discuss the case that the maintenance period is performed on the first machine, while the case of the maintenance period on the second machine is symmetric. We obtain a polynomial time approximation scheme, which is better than the best previous result
4
3
. Shop scheduling problem is one of the most classical problems in combinatorial optimization. In this paper, we study two-machine open shop scheduling problem, provided that one machine is subject to maintenance period which has to be performed in a fixed time interval. The target is to minimize the makespan. This paper considers non-resumable scenario, i.e., if a job which starts before the maintenance period cannot be completed before the maintenance period, then it must be restarted after the interval from scratch. We only discuss the case that the maintenance period is performed on the first machine, while the case of the maintenance period on the second machine is symmetric. We obtain a polynomial time approximation scheme, which is better than the best previous result 43. |
| Author | Ding, Ning Yuan, Yuan Han, Xin Lan, Yan |
| Author_xml | – sequence: 1 givenname: Yuan orcidid: 0000-0001-5403-6576 surname: Yuan fullname: Yuan, Yuan email: yuanyuan12430@126.com organization: School of Software Technology, Dalian University of Technology – sequence: 2 givenname: Yan surname: Lan fullname: Lan, Yan organization: School of Information and Communication Engineering, Dalian Minzu University – sequence: 3 givenname: Ning surname: Ding fullname: Ding, Ning – sequence: 4 givenname: Xin surname: Han fullname: Han, Xin organization: School of Software Technology, Dalian University of Technology |
| BookMark | eNp9kEtLAzEUhYNUsK3-AVcB16N5zOSxLMUXVBTsPmTSTJsyTWoyo_TfmzqC4KJkkXPJ_c69ORMw8sFbAK4xusUI8buEkeCiQAQXueS04GdgjKssiBBslDUVpGASVRdgktIWIZR1OQYvM_i2nL3DJkSYPYtoU7_TdWth2FsP0ybsYTIbu-pb59fwy3UbqD3Un9q1unat6w7QBJ-6qJ3vLsF5o9tkr37vKVg-3C_nT8Xi9fF5PlsUhmLZFZrwfGptK0kE0oLVxDAhjaZS0lJXpLRYrvKjwbWsCGOVZtIIzrlFctXQKbgZbPcxfPQ2dWob-ujzREUYLStRCcRyFxm6TAwpRduofXQ7HQ8KI3VMTQ2pqZya-klN8QyJf5Bxne5c8McftqdROqApz_FrG_-2OkF9Aw8Pgk0 |
| CitedBy_id | crossref_primary_10_1016_j_engappai_2024_108572 crossref_primary_10_1142_S0217595923400195 crossref_primary_10_1007_s10878_025_01271_w crossref_primary_10_1016_j_jmsy_2025_06_001 crossref_primary_10_1109_TSMC_2024_3376292 |
| Cites_doi | 10.1007/s10288-009-0102-3 10.1007/BF00121681 10.1016/j.ejor.2018.04.019 10.1002/nav.3800010110 10.1016/S0167-6377(96)00041-7 10.1002/nav.20122 10.1016/S0167-6377(00)00033-X 10.1007/s11590-011-0281-7 10.1016/S0377-2217(97)00452-9 10.1016/S0377-2217(01)00083-2 10.1023/A:1018964131329 10.1016/j.cor.2007.10.013 10.1016/0377-2217(93)90250-Q 10.1145/321978.321985 10.1016/j.ipl.2004.03.004 10.1287/ijoc.5.3.321 10.1051/ro:2002008 10.1007/s10852-013-9245-5 10.1016/j.cor.2005.01.004 10.1057/palgrave.jors.2601421 10.1007/s001860200267 10.1016/S0167-6377(01)00079-7 10.1287/moor.18.1.12 10.1002/nav.10107 10.1007/978-94-009-7801-0_9 10.1016/B978-0-444-87358-3.50012-2 |
| ContentType | Journal Article |
| Copyright | The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2021 The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2021. |
| Copyright_xml | – notice: The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2021 – notice: The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2021. |
| DBID | AAYXX CITATION |
| DOI | 10.1007/s10878-021-00773-7 |
| DatabaseName | CrossRef |
| DatabaseTitle | CrossRef |
| DatabaseTitleList | |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Engineering Mathematics |
| EISSN | 1573-2886 |
| EndPage | 362 |
| ExternalDocumentID | 10_1007_s10878_021_00773_7 |
| GrantInformation_xml | – fundername: National Natural Science Foundation of China grantid: 11971091; 11701062 funderid: http://dx.doi.org/10.13039/501100001809 |
| GroupedDBID | -5D -5G -BR -EM -Y2 -~C .86 .DC .VR 06D 0R~ 0VY 1N0 1SB 203 29K 2J2 2JN 2JY 2KG 2KM 2LR 2P1 2VQ 2~H 30V 4.4 406 408 409 40D 40E 5GY 5VS 67Z 6NX 8TC 8UJ 95- 95. 95~ 96X AAAVM AABHQ AACDK AAHNG AAIAL AAJBT AAJKR AANZL AARHV AARTL AASML AATNV AATVU AAUYE AAWCG AAYIU AAYOK AAYQN AAYTO AAYZH ABAKF ABBBX ABBXA ABDZT ABECU ABFTD ABFTV ABHLI ABHQN ABJNI ABJOX ABKCH ABKTR ABMNI ABMQK ABNWP ABQBU ABQSL ABSXP ABTEG ABTHY ABTKH ABTMW ABULA ABWNU ABXPI ACAOD ACBXY ACDTI ACGFS ACHSB ACHXU ACIWK ACKNC ACMDZ ACMLO ACOKC ACOMO ACPIV ACZOJ ADHHG ADHIR ADINQ ADKNI ADKPE ADRFC ADTPH ADURQ ADYFF ADZKW AEBTG AEFQL AEGAL AEGNC AEJHL AEJRE AEKMD AEMSY AENEX AEOHA AEPYU AESKC AETLH AEVLU AEXYK AFBBN AFGCZ AFLOW AFQWF AFWTZ AFZKB AGAYW AGDGC AGGDS AGJBK AGMZJ AGQEE AGQMX AGRTI AGWIL AGWZB AGYKE AHAVH AHBYD AHKAY AHSBF AHYZX AIAKS AIGIU AIIXL AILAN AITGF AJBLW AJRNO AJZVZ ALMA_UNASSIGNED_HOLDINGS ALWAN AMKLP AMXSW AMYLF AMYQR AOCGG ARMRJ ASPBG AVWKF AXYYD AYJHY AZFZN B-. BA0 BAPOH BDATZ BGNMA BSONS CAG COF CS3 CSCUP D-I DDRTE DL5 DNIVK DPUIP DU5 EBLON EBS EIOEI EJD ESBYG F5P FEDTE FERAY FFXSO FIGPU FINBP FNLPD FRRFC FSGXE FWDCC GGCAI GGRSB GJIRD GNWQR GQ6 GQ7 GQ8 GXS H13 HF~ HG5 HG6 HMJXF HQYDN HRMNR HVGLF HZ~ I09 IHE IJ- IKXTQ IWAJR IXC IXD IXE IZIGR IZQ I~X I~Z J-C J0Z J9A JBSCW JCJTX JZLTJ KDC KOV LAK LLZTM M4Y MA- N2Q NB0 NPVJJ NQJWS NU0 O9- O93 O9J OAM OVD P2P P9R PF0 PT4 PT5 QOS R89 R9I RNI RNS ROL RPX RSV RZC RZE RZK S16 S1Z S27 S3B SAP SDH SHX SISQX SJYHP SMT SNE SNPRN SNX SOHCF SOJ SPISZ SRMVM SSLCW STPWE SZN T13 TEORI TSG TSK TSV TUC U2A UG4 UOJIU UTJUX UZXMN VC2 VFIZW W23 W48 WK8 YLTOR Z45 Z7X Z83 Z88 ZMTXR AAPKM AAYXX ABBRH ABDBE ABFSG ABJCF ABRTQ ACSTC ADHKG AEZWR AFDZB AFFHD AFHIU AFKRA AFOHR AGQPQ AHPBZ AHWEU AIXLP ARAPS ATHPR AYFIA AZQEC BENPR BGLVJ CCPQU CITATION DWQXO GNUQQ HCIFZ M2P M7S PHGZM PHGZT PQGLB PTHSS |
| ID | FETCH-LOGICAL-c319t-a27272bae59280a86b2c689ca39934a524e19d592c1b952665a69c8777e09df3 |
| IEDL.DBID | RSV |
| ISICitedReferencesCount | 8 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000669166100001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 1382-6905 |
| IngestDate | Thu Sep 18 00:02:03 EDT 2025 Sat Nov 29 04:54:38 EST 2025 Tue Nov 18 21:26:10 EST 2025 Fri Feb 21 02:47:33 EST 2025 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 2 |
| Keywords | Open shop scheduling Machine non-availability Polynomial time approximation scheme Approximation algorithm |
| Language | English |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c319t-a27272bae59280a86b2c689ca39934a524e19d592c1b952665a69c8777e09df3 |
| Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ORCID | 0000-0001-5403-6576 |
| PQID | 2634585806 |
| PQPubID | 2043856 |
| PageCount | 13 |
| ParticipantIDs | proquest_journals_2634585806 crossref_primary_10_1007_s10878_021_00773_7 crossref_citationtrail_10_1007_s10878_021_00773_7 springer_journals_10_1007_s10878_021_00773_7 |
| PublicationCentury | 2000 |
| PublicationDate | 2022-03-01 |
| PublicationDateYYYYMMDD | 2022-03-01 |
| PublicationDate_xml | – month: 03 year: 2022 text: 2022-03-01 day: 01 |
| PublicationDecade | 2020 |
| PublicationPlace | New York |
| PublicationPlace_xml | – name: New York – name: Dordrecht |
| PublicationTitle | Journal of combinatorial optimization |
| PublicationTitleAbbrev | J Comb Optim |
| PublicationYear | 2022 |
| Publisher | Springer US Springer Nature B.V |
| Publisher_xml | – name: Springer US – name: Springer Nature B.V |
| References | Strusevich (CR27) 1998; 83 Breit (CR2) 2004; 90 Hadda (CR11) 2014; 13 Breit, Schmidt, Strusevich (CR4) 2001; 29 Breit (CR3) 2006; 33 Cheng, Wang (CR7) 2000; 26 Lorigeon, Billaut, Bouquard (CR20) 2002; 53 Lee (CR19) 1999; 114 Hadda (CR10) 2012; 6 Lu, Posner (CR21) 1993; 18 Shakhlevich, Strusevich (CR26) 1993; 70 Kubzin, Potts, Strusevich (CR16) 2009; 36 Ng, Kovalyov (CR23) 2004; 51 Johnson (CR13) 1954; 1 Gonzalez, Sahni (CR9) 1976; 23 Lee (CR18) 1997; 20 Mosheiov, Sarig, Strusevich, Mosheiff (CR22) 2018; 271 Breit, Schmidt, Strusevich (CR5) 2003; 57 CR8 Chen, Strusevich (CR6) 1993; 5 Kubiak, Błazewicz, Formanowicz, Breit, Schmidt (CR14) 2002; 136 Lee (CR17) 1996; 9 CR24 Hadda, Dridi, Hajri-Gabouj (CR12) 2010; 8 Kubzin, Strusevich, Breit, Schmidt (CR15) 2006; 53 Błazewicz, Formanowicz (CR1) 2002; 36 Sevastianov, Woeginger (CR25) 1998; 82 J Błazewicz (773_CR1) 2002; 36 J Breit (773_CR2) 2004; 90 TE Cheng (773_CR7) 2000; 26 H Hadda (773_CR11) 2014; 13 CY Lee (773_CR18) 1997; 20 J Breit (773_CR5) 2003; 57 B Chen (773_CR6) 1993; 5 C Ng (773_CR23) 2004; 51 N Shakhlevich (773_CR26) 1993; 70 W Kubiak (773_CR14) 2002; 136 MA Kubzin (773_CR15) 2006; 53 SM Johnson (773_CR13) 1954; 1 CY Lee (773_CR19) 1999; 114 773_CR24 SV Sevastianov (773_CR25) 1998; 82 CY Lee (773_CR17) 1996; 9 T Lorigeon (773_CR20) 2002; 53 VA Strusevich (773_CR27) 1998; 83 L Lu (773_CR21) 1993; 18 G Mosheiov (773_CR22) 2018; 271 H Hadda (773_CR10) 2012; 6 773_CR8 H Hadda (773_CR12) 2010; 8 J Breit (773_CR3) 2006; 33 MA Kubzin (773_CR16) 2009; 36 J Breit (773_CR4) 2001; 29 T Gonzalez (773_CR9) 1976; 23 |
| References_xml | – volume: 8 start-page: 87 issue: 1 year: 2010 end-page: 99 ident: CR12 article-title: An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs publication-title: 4OR doi: 10.1007/s10288-009-0102-3 – volume: 9 start-page: 395 issue: 3–4 year: 1996 end-page: 416 ident: CR17 article-title: Machine scheduling with an availability constraint publication-title: J Global Optim doi: 10.1007/BF00121681 – volume: 271 start-page: 388 issue: 2 year: 2018 end-page: 400 ident: CR22 article-title: Two-machine flow shop and open shop scheduling problems with a single maintenance window publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2018.04.019 – volume: 1 start-page: 61 issue: 1 year: 1954 end-page: 68 ident: CR13 article-title: Optimal two-and three-stage production schedules with setup times included publication-title: Naval Res Logist Q doi: 10.1002/nav.3800010110 – volume: 20 start-page: 129 issue: 3 year: 1997 end-page: 139 ident: CR18 article-title: Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint publication-title: Oper Res Lett doi: 10.1016/S0167-6377(96)00041-7 – volume: 53 start-page: 16 issue: 1 year: 2006 end-page: 23 ident: CR15 article-title: Polynomial-time approximation schemes for two-machine open shop scheduling with nonavailability constraints publication-title: Naval Res Logist (NRL) doi: 10.1002/nav.20122 – volume: 26 start-page: 223 issue: 5 year: 2000 end-page: 229 ident: CR7 article-title: An improved heuristic for two-machine flowshop scheduling with an availability constraint publication-title: Oper Res Lett doi: 10.1016/S0167-6377(00)00033-X – volume: 6 start-page: 559 issue: 3 year: 2012 end-page: 569 ident: CR10 article-title: A polynomial-time approximation scheme for the two machine flow shop problem with several availability constraints publication-title: Optim Lett doi: 10.1007/s11590-011-0281-7 – volume: 114 start-page: 420 issue: 2 year: 1999 end-page: 429 ident: CR19 article-title: Two-machine flowshop scheduling with availability constraints publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(97)00452-9 – volume: 136 start-page: 528 issue: 3 year: 2002 end-page: 540 ident: CR14 article-title: Two-machine flow shops with limited machine availability publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(01)00083-2 – ident: CR8 – volume: 83 start-page: 253 year: 1998 end-page: 270 ident: CR27 article-title: A greedy open shop heuristic with job priorities publication-title: Annal Oper Res doi: 10.1023/A:1018964131329 – volume: 36 start-page: 379 issue: 2 year: 2009 end-page: 390 ident: CR16 article-title: Approximation results for flow shop scheduling problems with machine availability constraints publication-title: Computers Oper Res doi: 10.1016/j.cor.2007.10.013 – volume: 70 start-page: 391 issue: 3 year: 1993 end-page: 404 ident: CR26 article-title: Two machine open shop scheduling problem to minimize an arbitrary machine usage regular penalty function publication-title: Eur J Oper Res doi: 10.1016/0377-2217(93)90250-Q – volume: 23 start-page: 665 issue: 4 year: 1976 end-page: 679 ident: CR9 article-title: Open shop scheduling to minimize finish time publication-title: J ACM (JACM) doi: 10.1145/321978.321985 – volume: 90 start-page: 273 issue: 6 year: 2004 end-page: 278 ident: CR2 article-title: An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint publication-title: Information Process Lett doi: 10.1016/j.ipl.2004.03.004 – volume: 5 start-page: 321 issue: 3 year: 1993 end-page: 326 ident: CR6 article-title: Approximation algorithms for three-machine open shop scheduling publication-title: ORSA J Comput doi: 10.1287/ijoc.5.3.321 – volume: 36 start-page: 149 issue: 2 year: 2002 end-page: 156 ident: CR1 article-title: Scheduling jobs in open shops with limited machine availability publication-title: RAIRO-Oper Res-Recherche Opérationnelle doi: 10.1051/ro:2002008 – volume: 13 start-page: 511 issue: 4 year: 2014 end-page: 522 ident: CR11 article-title: A PTAS for a particular case of the two-machine flow shop with limited machine availability publication-title: J Math Model Algorithms Oper Res doi: 10.1007/s10852-013-9245-5 – volume: 33 start-page: 2143 issue: 8 year: 2006 end-page: 2153 ident: CR3 article-title: A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint publication-title: Computers Oper Res doi: 10.1016/j.cor.2005.01.004 – volume: 53 start-page: 1239 issue: 11 year: 2002 end-page: 1246 ident: CR20 article-title: A dynamic programming algorithm for scheduling jobs in a two-machine open shop with an availability constraint publication-title: J Oper Res Soc doi: 10.1057/palgrave.jors.2601421 – volume: 57 start-page: 217 issue: 2 year: 2003 end-page: 234 ident: CR5 article-title: Non-preemptive two-machine open shop scheduling with non-availability constraints publication-title: Math Methods Oper Res doi: 10.1007/s001860200267 – volume: 29 start-page: 65 issue: 2 year: 2001 end-page: 77 ident: CR4 article-title: Two-machine open shop scheduling with an availability constraint publication-title: Oper Res Lett doi: 10.1016/S0167-6377(01)00079-7 – volume: 18 start-page: 12 issue: 1 year: 1993 end-page: 38 ident: CR21 article-title: An NP-hard open shop scheduling problem with polynomial average time complexity publication-title: Math Oper Res doi: 10.1287/moor.18.1.12 – volume: 51 start-page: 307 issue: 3 year: 2004 end-page: 315 ident: CR23 article-title: An FPTAS for scheduling a two-machine flowshop with one unavailability interval publication-title: Naval Res Logist (NRL) doi: 10.1002/nav.10107 – ident: CR24 – volume: 82 start-page: 191 issue: 1–2 year: 1998 end-page: 198 ident: CR25 article-title: Makespan minimization in open shops: a polynomial time approximation scheme publication-title: Math Program – volume: 53 start-page: 16 issue: 1 year: 2006 ident: 773_CR15 publication-title: Naval Res Logist (NRL) doi: 10.1002/nav.20122 – volume: 29 start-page: 65 issue: 2 year: 2001 ident: 773_CR4 publication-title: Oper Res Lett doi: 10.1016/S0167-6377(01)00079-7 – ident: 773_CR24 doi: 10.1007/978-94-009-7801-0_9 – volume: 33 start-page: 2143 issue: 8 year: 2006 ident: 773_CR3 publication-title: Computers Oper Res doi: 10.1016/j.cor.2005.01.004 – volume: 1 start-page: 61 issue: 1 year: 1954 ident: 773_CR13 publication-title: Naval Res Logist Q doi: 10.1002/nav.3800010110 – volume: 57 start-page: 217 issue: 2 year: 2003 ident: 773_CR5 publication-title: Math Methods Oper Res doi: 10.1007/s001860200267 – volume: 136 start-page: 528 issue: 3 year: 2002 ident: 773_CR14 publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(01)00083-2 – volume: 36 start-page: 149 issue: 2 year: 2002 ident: 773_CR1 publication-title: RAIRO-Oper Res-Recherche Opérationnelle doi: 10.1051/ro:2002008 – volume: 26 start-page: 223 issue: 5 year: 2000 ident: 773_CR7 publication-title: Oper Res Lett doi: 10.1016/S0167-6377(00)00033-X – volume: 70 start-page: 391 issue: 3 year: 1993 ident: 773_CR26 publication-title: Eur J Oper Res doi: 10.1016/0377-2217(93)90250-Q – volume: 83 start-page: 253 year: 1998 ident: 773_CR27 publication-title: Annal Oper Res doi: 10.1023/A:1018964131329 – ident: 773_CR8 doi: 10.1016/B978-0-444-87358-3.50012-2 – volume: 5 start-page: 321 issue: 3 year: 1993 ident: 773_CR6 publication-title: ORSA J Comput doi: 10.1287/ijoc.5.3.321 – volume: 23 start-page: 665 issue: 4 year: 1976 ident: 773_CR9 publication-title: J ACM (JACM) doi: 10.1145/321978.321985 – volume: 9 start-page: 395 issue: 3–4 year: 1996 ident: 773_CR17 publication-title: J Global Optim doi: 10.1007/BF00121681 – volume: 8 start-page: 87 issue: 1 year: 2010 ident: 773_CR12 publication-title: 4OR doi: 10.1007/s10288-009-0102-3 – volume: 90 start-page: 273 issue: 6 year: 2004 ident: 773_CR2 publication-title: Information Process Lett doi: 10.1016/j.ipl.2004.03.004 – volume: 82 start-page: 191 issue: 1–2 year: 1998 ident: 773_CR25 publication-title: Math Program – volume: 36 start-page: 379 issue: 2 year: 2009 ident: 773_CR16 publication-title: Computers Oper Res doi: 10.1016/j.cor.2007.10.013 – volume: 6 start-page: 559 issue: 3 year: 2012 ident: 773_CR10 publication-title: Optim Lett doi: 10.1007/s11590-011-0281-7 – volume: 18 start-page: 12 issue: 1 year: 1993 ident: 773_CR21 publication-title: Math Oper Res doi: 10.1287/moor.18.1.12 – volume: 271 start-page: 388 issue: 2 year: 2018 ident: 773_CR22 publication-title: Eur J Oper Res doi: 10.1016/j.ejor.2018.04.019 – volume: 20 start-page: 129 issue: 3 year: 1997 ident: 773_CR18 publication-title: Oper Res Lett doi: 10.1016/S0167-6377(96)00041-7 – volume: 114 start-page: 420 issue: 2 year: 1999 ident: 773_CR19 publication-title: Eur J Oper Res doi: 10.1016/S0377-2217(97)00452-9 – volume: 53 start-page: 1239 issue: 11 year: 2002 ident: 773_CR20 publication-title: J Oper Res Soc doi: 10.1057/palgrave.jors.2601421 – volume: 13 start-page: 511 issue: 4 year: 2014 ident: 773_CR11 publication-title: J Math Model Algorithms Oper Res doi: 10.1007/s10852-013-9245-5 – volume: 51 start-page: 307 issue: 3 year: 2004 ident: 773_CR23 publication-title: Naval Res Logist (NRL) doi: 10.1002/nav.10107 |
| SSID | ssj0009054 |
| Score | 2.3098087 |
| Snippet | Shop scheduling problem is one of the most classical problems in combinatorial optimization. In this paper, we study two-machine open shop scheduling problem,... |
| SourceID | proquest crossref springer |
| SourceType | Aggregation Database Enrichment Source Index Database Publisher |
| StartPage | 350 |
| SubjectTerms | Combinatorial analysis Combinatorics Convex and Discrete Geometry Job shops Maintenance Mathematical Modeling and Industrial Mathematics Mathematics Mathematics and Statistics Operations Research/Decision Theory Optimization Polynomials Scheduling Theory of Computation |
| Title | A PTAS for non-resumable open shop scheduling with an availability constraint |
| URI | https://link.springer.com/article/10.1007/s10878-021-00773-7 https://www.proquest.com/docview/2634585806 |
| Volume | 43 |
| WOSCitedRecordID | wos000669166100001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVAVX databaseName: SpringerLINK Contemporary 1997-Present customDbUrl: eissn: 1573-2886 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0009054 issn: 1382-6905 databaseCode: RSV dateStart: 19970301 isFulltext: true titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22 providerName: Springer Nature |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1bS8MwFA46fdAH7-J0Sh5800CXtrk8DnH44MZwQ_ZW0jTFgXZj7Qb-e096WaeooI8lF8LJ5ftOk_MdhK4jbQDkeEwYkGHiGc8lAmgRCQErDNcKzuU8a8kj7_fFeCwHZVBYWr12r64k85N6LdhNWDVYCu6vw7lL-CbaArgTdjs-DZ9rqV3HL1LZAncE388vQ2W-7-MzHNUc88u1aI423f3_jfMA7ZXsEneK5XCINkxyhHbXNAfhq7cSak2PUa-DB6POEAN1xck0IeB8L95sNBW2abVw-jKdYfB_AY9s2Dq2f22xSrBaqslrofD9jrWlmDbTRHaCRt370d0DKTMsEA1bLyOK2nvYUBlfUuEowUKqmZBaWdriKZ96pi0jKNTtUPqA5b5iUlsJQePIKHZPUQPGZs4QjqVuG-YaE3LHixQTDvRKQ64oOMFUxk3Uruwc6FJ93A7tNah1k63dArBbkNst4E10s2ozK7Q3fq3dqqYvKPdhGlDmeuAQCYc10W01XXXxz72d_636BdqhNi4if5zWQo1svjCXaFsvs0k6v8rX5wdLXd0l |
| linkProvider | Springer Nature |
| linkToHtml | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEB60CurBt1itmoM3DexmH9kci1gU21LsIr0t2TTFQm1Lty34753so62igh6XPAiTx_fNJvMNwHVXaQQ53qM-kmHqatehAdIiGiNWaK4knstp1pI6bzaDTke08qCwpHjtXlxJpif1SrBbYNRgGbq_FucO5euw4SJimYd8z-2XpdSu5WWpbJE7ou_n5aEy3_fxGY6WHPPLtWiKNrW9_41zH3Zzdkmq2XI4gDU9PISdFc1B_GoshFqTI2hUSSustglSVzIcDSk637M3E01FTFotkryOxgT9X8QjE7ZOzF9bIodEzmV_kCl8vxNlKKbJNDE9hrB2H9490DzDAlW49aZUMnMPG0vtCRZYMvBjpvxAKGloiys95mpbdLFQ2bHwEMs96QtlJAS1Jbo95wRKODZ9CqQnlK19R-uYW25X-oGFvbKYS4ZOMBO9MtiFnSOVq4-boQ2ipW6ysVuEdotSu0W8DDeLNuNMe-PX2pVi-qJ8HyYR8x0XHaLA8stwW0zXsvjn3s7-Vv0Kth7CRj2qPzafzmGbmRiJ9KFaBUrTyUxfwKaaT_vJ5DJdqx-x7OAJ |
| linkToPdf | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1bS8MwFD7oFNEH7-K85sE3DXbpJc3jUIfiNgYO8a2kaYqCdmPrBv57T3pZp6ggPpakIZwkPd_Xk_MdgLNIaXRyPKYegmHqaMemPsIiGqKv0FxJ_C5nVUvavNv1n55Eby6LP7vtXoYk85wGo9KUpJfDKL6cS3zzjTIsQypscW5TvghLjikaZPj6w2Mlu2u5eVlbxJHIA90ibeb7MT67pgpvfgmRZp6ntfH_OW_CeoE6STPfJluwoJNtWJvTIsSnzkzAdbwDnSbp9ZsPBCEtSQYJRVI-eTNZVsSU2yLj58GQIC9GP2XS2Yn5m0tkQuRUvrzmyt_vRBnoaSpQpLvQb930r25pUXmBKjySKZXMxGdDqV3BfEv6XsiU5wslDZxxpMsc3RARNqpGKFz08a70hDLSgtoSUWzvQQ3npveBxEI1tGdrHXLLiaTnWzgqC7lkSI6ZiOvQKG0eqEKV3EztNaj0lI3dArRbkNkt4HU4n70zzDU5fu19VC5lUJzPccA820Gi5FteHS7Kpauafx7t4G_dT2Gld90K2nfd-0NYZSZ1Iru_dgS1dDTRx7CspunLeHSSbdsPUfPo7Q |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+PTAS+for+non-resumable+open+shop+scheduling+with+an+availability+constraint&rft.jtitle=Journal+of+combinatorial+optimization&rft.au=Yuan%2C+Yuan&rft.au=Yan%2C+Lan&rft.au=Ding%2C+Ning&rft.au=Han%2C+Xin&rft.date=2022-03-01&rft.pub=Springer+Nature+B.V&rft.issn=1382-6905&rft.eissn=1573-2886&rft.volume=43&rft.issue=2&rft.spage=350&rft.epage=362&rft_id=info:doi/10.1007%2Fs10878-021-00773-7&rft.externalDBID=NO_FULL_TEXT |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1382-6905&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1382-6905&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1382-6905&client=summon |