Öztürk, C., Tunalı, S., Hnich, B., & Örnek, M. A. (2013). Balancing and scheduling of flexible mixed model assembly lines. Constraints : an international journal, 18(3), 434-469. https://doi.org/10.1007/s10601-013-9142-6
Chicago Style (17th ed.) CitationÖztürk, Cemalettin, Semra Tunalı, Brahim Hnich, and M. Arslan Örnek. "Balancing and Scheduling of Flexible Mixed Model Assembly Lines." Constraints : An International Journal 18, no. 3 (2013): 434-469. https://doi.org/10.1007/s10601-013-9142-6.
MLA (9th ed.) CitationÖztürk, Cemalettin, et al. "Balancing and Scheduling of Flexible Mixed Model Assembly Lines." Constraints : An International Journal, vol. 18, no. 3, 2013, pp. 434-469, https://doi.org/10.1007/s10601-013-9142-6.
Warning: These citations may not always be 100% accurate.