Oyama, T., & Miwa, M. (2006). Mathematical modeling analyses for obtaining an optimal railway track maintenance schedule. Japan journal of industrial and applied mathematics, 23(2), 207-224. https://doi.org/10.1007/BF03167551
Chicago-Zitierstil (17. Ausg.)Oyama, Tatsuo, und Masashi Miwa. "Mathematical Modeling Analyses for Obtaining an Optimal Railway Track Maintenance Schedule." Japan Journal of Industrial and Applied Mathematics 23, no. 2 (2006): 207-224. https://doi.org/10.1007/BF03167551.
MLA-Zitierstil (9. Ausg.)Oyama, Tatsuo, und Masashi Miwa. "Mathematical Modeling Analyses for Obtaining an Optimal Railway Track Maintenance Schedule." Japan Journal of Industrial and Applied Mathematics, vol. 23, no. 2, 2006, pp. 207-224, https://doi.org/10.1007/BF03167551.