A new hybrid method for buffer sizing and machine allocation in unreliable production and assembly lines with general distribution time-dependent parameters
This paper proposes a multi-objective mathematical formulation and a hybrid approach to solve buffer sizing and machine allocation problems simultaneously in unreliable production and assembly lines. This paper unlike prior researches assumes that time-dependent parameters of production systems are...
Uložené v:
| Vydané v: | International journal of advanced manufacturing technology Ročník 74; číslo 9-12; s. 1577 - 1593 |
|---|---|
| Hlavný autor: | |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
London
Springer London
01.10.2014
Springer Nature B.V |
| Predmet: | |
| ISSN: | 0268-3768, 1433-3015 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!