Mohtashami, A. (2014). A new hybrid method for buffer sizing and machine allocation in unreliable production and assembly lines with general distribution time-dependent parameters. International journal of advanced manufacturing technology, 74(9-12), 1577-1593. https://doi.org/10.1007/s00170-014-6098-7
Citácia podle Chicago (17th ed.)Mohtashami, Ali. "A New Hybrid Method for Buffer Sizing and Machine Allocation in Unreliable Production and Assembly Lines with General Distribution Time-dependent Parameters." International Journal of Advanced Manufacturing Technology 74, no. 9-12 (2014): 1577-1593. https://doi.org/10.1007/s00170-014-6098-7.
Citácia podľa MLA (8th ed.)Mohtashami, Ali. "A New Hybrid Method for Buffer Sizing and Machine Allocation in Unreliable Production and Assembly Lines with General Distribution Time-dependent Parameters." International Journal of Advanced Manufacturing Technology, vol. 74, no. 9-12, 2014, pp. 1577-1593, https://doi.org/10.1007/s00170-014-6098-7.