Minimizing makespan in a group shop with fuzzy release dates and processing times
This paper deals with a fuzzy group shop scheduling problem. The group shop scheduling problem is a general formulation that includes the flow shop, the job shop, and the open shop scheduling problems. Job release dates and processing times are considered to be triangular fuzzy numbers. The objectiv...
Uložené v:
| Vydané v: | International journal of advanced manufacturing technology Ročník 66; číslo 9-12; s. 2063 - 2074 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
London
Springer-Verlag
01.06.2013
Springer Nature B.V |
| Predmet: | |
| ISSN: | 0268-3768, 1433-3015 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
Buďte prvý, kto okomentuje tento záznam!