Ahmadizar, F., & Zarei, A. (2013). Minimizing makespan in a group shop with fuzzy release dates and processing times. International journal of advanced manufacturing technology, 66(9-12), 2063-2074. https://doi.org/10.1007/s00170-012-4482-8
Citace podle Chicago (17th ed.)Ahmadizar, Fardin, a Alireza Zarei. "Minimizing Makespan in a Group Shop with Fuzzy Release Dates and Processing Times." International Journal of Advanced Manufacturing Technology 66, no. 9-12 (2013): 2063-2074. https://doi.org/10.1007/s00170-012-4482-8.
Citace podle MLA (9th ed.)Ahmadizar, Fardin, a Alireza Zarei. "Minimizing Makespan in a Group Shop with Fuzzy Release Dates and Processing Times." International Journal of Advanced Manufacturing Technology, vol. 66, no. 9-12, 2013, pp. 2063-2074, https://doi.org/10.1007/s00170-012-4482-8.