A polynomial time algorithm for production planning with bounded inventory

In petrochemical manufacturing, food processing, glass manufacturing, etc., there is a situation where the production planning is subject to the limit of inventory capacity (or bounded inventory) rather than production capacity. Only a few studies can be found in the literature for this situation. I...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:International journal of advanced manufacturing technology Ročník 39; číslo 7-8; s. 774 - 782
Hlavní autor: Liu, X.
Médium: Journal Article
Jazyk:angličtina
Vydáno: London Springer-Verlag 01.11.2008
Springer Nature B.V
Témata:
ISSN:0268-3768, 1433-3015
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract In petrochemical manufacturing, food processing, glass manufacturing, etc., there is a situation where the production planning is subject to the limit of inventory capacity (or bounded inventory) rather than production capacity. Only a few studies can be found in the literature for this situation. In this paper, the production planning problem with bounded inventory is discussed. Specifically, the problem considered had the following features: (i) backlogging is not allowed, (ii) lost sale is allowed, (iii) the lost sale cost function is time varying and non-increasing, and (iv) inventory capacity is non-decreasing. An algorithm for this problem with the polynomial O( T 3 ) time complexity is proposed. Though the complexity of the algorithm is the same as that of the other work, see Sandbothe and Thompson (Oper Res 38(3):474–486, 1990 ), the problem in the other’s work problem is less complex than ours; for instance only a fixed cost function is considered. A case study taken from a real-life production line is provided to further justify the application of the lost sale strategy, demonstrating the effectiveness of our model and algorithm.
AbstractList In petrochemical manufacturing, food processing, glass manufacturing, etc., there is a situation where the production planning is subject to the limit of inventory capacity (or bounded inventory) rather than production capacity. Only a few studies can be found in the literature for this situation. In this paper, the production planning problem with bounded inventory is discussed. Specifically, the problem considered had the following features: (i) backlogging is not allowed, (ii) lost sale is allowed, (iii) the lost sale cost function is time varying and non-increasing, and (iv) inventory capacity is non-decreasing. An algorithm for this problem with the polynomial O(T3) time complexity is proposed. Though the complexity of the algorithm is the same as that of the other work, see Sandbothe and Thompson (Oper Res 38(3):474–486, 1990), the problem in the other’s work problem is less complex than ours; for instance only a fixed cost function is considered. A case study taken from a real-life production line is provided to further justify the application of the lost sale strategy, demonstrating the effectiveness of our model and algorithm.
In petrochemical manufacturing, food processing, glass manufacturing, etc., there is a situation where the production planning is subject to the limit of inventory capacity (or bounded inventory) rather than production capacity. Only a few studies can be found in the literature for this situation. In this paper, the production planning problem with bounded inventory is discussed. Specifically, the problem considered had the following features: (i) backlogging is not allowed, (ii) lost sale is allowed, (iii) the lost sale cost function is time varying and non-increasing, and (iv) inventory capacity is non-decreasing. An algorithm for this problem with the polynomial O( T 3 ) time complexity is proposed. Though the complexity of the algorithm is the same as that of the other work, see Sandbothe and Thompson (Oper Res 38(3):474–486, 1990 ), the problem in the other’s work problem is less complex than ours; for instance only a fixed cost function is considered. A case study taken from a real-life production line is provided to further justify the application of the lost sale strategy, demonstrating the effectiveness of our model and algorithm.
Author Liu, X.
Author_xml – sequence: 1
  givenname: X.
  surname: Liu
  fullname: Liu, X.
  email: xialiu@ucalgary.ca
  organization: School of Business Administration, Northeastern University, Department of Mechanical and Manufacturing Engineering, University of Calgary
BookMark eNp9kE1LxDAQhoOs4O7qD_AW8BzNR5u0x2XxkwUveg7ZNF2ztElNU6X_3pQKgqCnGZj3mXnnXYGF884AcEnwNcFY3PQYE4FRahGhGUfjCViSjDHEMMkXYIkpLxATvDgDq74_JjUnvFiCpw3sfDM631rVwGhbA1Vz8MHGtxbWPsAu-GrQ0XoHu0Y5Z90BfqYp3PvBVaaC1n0YF30Yz8FprZreXHzXNXi9u33ZPqDd8_3jdrNDmhEekc5qQ0vKSZ7zzJSsFLzkmlO8z4lglGlhSqVEQTXVShBaVDmvtarrjFeVxnu2Blfz3mTtfTB9lEc_BJdOSko5zTHPSpJUZFbp4Ps-mFp2wbYqjJJgOUUm58jk1E6RyTEx4hejbVTT7zEo2_xL0pns0xV3MOHH09_QF0QFgxI
CitedBy_id crossref_primary_10_1080_0951192X_2017_1335436
crossref_primary_10_1016_j_omega_2021_102421
Cites_doi 10.1016/0377-2217(90)90152-2
10.1287/mnsc.21.9.1007
10.1016/S0020-0255(03)00065-3
10.1016/S0305-0548(01)00105-8
10.1016/0377-2217(94)90086-8
10.1016/j.ins.2005.11.004
10.1287/opre.38.3.474
10.1016/j.cor.2005.02.046
10.1016/j.cor.2005.05.029
10.1287/opre.1050.0223
10.1007/BF01098363
10.1016/0305-0548(93)90010-G
10.1016/S0377-2217(02)00331-4
10.1287/mnsc.44.6.831
10.1287/mnsc.28.10.1174
10.1287/mnsc.20.3.313
10.1287/opre.40.1.S145
10.1287/mnsc.15.9.506
10.1287/opre.41.3.549
10.1287/mnsc.24.16.1710
10.1287/mnsc.18.1.12
10.1287/mnsc.14.7.429
10.1287/mnsc.37.8.909
10.1287/mnsc.26.7.669
10.1287/mnsc.42.1.142
10.1287/mnsc.5.1.89
ContentType Journal Article
Copyright Springer-Verlag London Limited 2007
The International Journal of Advanced Manufacturing Technology is a copyright of Springer, (2007). All Rights Reserved.
Copyright_xml – notice: Springer-Verlag London Limited 2007
– notice: The International Journal of Advanced Manufacturing Technology is a copyright of Springer, (2007). All Rights Reserved.
DBID AAYXX
CITATION
8FE
8FG
ABJCF
AFKRA
BENPR
BGLVJ
CCPQU
DWQXO
HCIFZ
L6V
M7S
PHGZM
PHGZT
PKEHL
PQEST
PQGLB
PQQKQ
PQUKI
PRINS
PTHSS
DOI 10.1007/s00170-007-1246-y
DatabaseName CrossRef
ProQuest SciTech Collection
ProQuest Technology Collection
Materials Science & Engineering Collection
ProQuest Central UK/Ireland
ProQuest Central
Technology collection
ProQuest One Community College
ProQuest Central Korea
SciTech Premium Collection
ProQuest Engineering Collection
Engineering Database
ProQuest Central Premium
ProQuest One Academic
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic (retired)
ProQuest One Academic UKI Edition
ProQuest Central China
Engineering Collection
DatabaseTitle CrossRef
Engineering Database
Technology Collection
ProQuest One Academic Middle East (New)
ProQuest One Academic Eastern Edition
SciTech Premium Collection
ProQuest One Community College
ProQuest Technology Collection
ProQuest SciTech Collection
ProQuest Central China
ProQuest Central
ProQuest One Applied & Life Sciences
ProQuest Engineering Collection
ProQuest One Academic UKI Edition
ProQuest Central Korea
Materials Science & Engineering Collection
ProQuest One Academic
ProQuest Central (New)
Engineering Collection
ProQuest One Academic (New)
DatabaseTitleList Engineering Database

Database_xml – sequence: 1
  dbid: BENPR
  name: ProQuest Central
  url: https://www.proquest.com/central
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1433-3015
EndPage 782
ExternalDocumentID 10_1007_s00170_007_1246_y
GroupedDBID -5B
-5G
-BR
-EM
-XW
-XX
-Y2
-~C
.86
.VR
06D
0R~
0VY
123
1N0
1SB
203
28-
29J
29~
2J2
2JN
2JY
2KG
2KM
2LR
2P1
2VQ
2~H
30V
4.4
406
408
409
40D
40E
5GY
5QI
5VS
67Z
6NX
8FE
8FG
8TC
8UJ
95-
95.
95~
96X
9M8
AAAVM
AABHQ
AACDK
AAHNG
AAIAL
AAJBT
AAJKR
AANZL
AARHV
AARTL
AASML
AATNV
AATVU
AAUYE
AAWCG
AAYIU
AAYQN
AAYTO
AAYZH
ABAKF
ABBBX
ABBXA
ABDBF
ABDZT
ABECU
ABFTD
ABFTV
ABHQN
ABJCF
ABJNI
ABJOX
ABKCH
ABKTR
ABMNI
ABMQK
ABNWP
ABQBU
ABQSL
ABSXP
ABTAH
ABTEG
ABTHY
ABTKH
ABTMW
ABULA
ABWNU
ABXPI
ACAOD
ACBXY
ACDTI
ACGFS
ACHSB
ACHXU
ACIWK
ACKNC
ACMDZ
ACMLO
ACOKC
ACOMO
ACPIV
ACUHS
ACZOJ
ADHHG
ADHIR
ADINQ
ADKNI
ADKPE
ADMLS
ADQRH
ADRFC
ADTPH
ADURQ
ADYFF
ADZKW
AEBTG
AEFIE
AEFQL
AEGAL
AEGNC
AEJHL
AEJRE
AEKMD
AEMSY
AENEX
AEOHA
AEPYU
AESKC
AETLH
AEVLU
AEXYK
AFBBN
AFEXP
AFGCZ
AFKRA
AFLOW
AFQWF
AFWTZ
AFZKB
AGAYW
AGDGC
AGGDS
AGJBK
AGMZJ
AGQEE
AGQMX
AGRTI
AGWIL
AGWZB
AGYKE
AHAVH
AHBYD
AHSBF
AHYZX
AIAKS
AIGIU
AIIXL
AILAN
AITGF
AJBLW
AJRNO
AJZVZ
ALMA_UNASSIGNED_HOLDINGS
ALWAN
AMKLP
AMXSW
AMYLF
AMYQR
AOCGG
ARCEE
ARMRJ
ASPBG
AVWKF
AXYYD
AYJHY
AZFZN
B-.
B0M
BA0
BBWZM
BDATZ
BENPR
BGLVJ
BGNMA
BSONS
CAG
CCPQU
COF
CS3
CSCUP
DDRTE
DL5
DNIVK
DPUIP
DU5
EAD
EAP
EAS
EBLON
EBS
EIOEI
EJD
EMK
EPL
ESBYG
ESX
FEDTE
FERAY
FFXSO
FIGPU
FINBP
FNLPD
FRRFC
FSGXE
FWDCC
GGCAI
GGRSB
GJIRD
GNWQR
GQ6
GQ7
GQ8
GXS
H13
HCIFZ
HF~
HG5
HG6
HMJXF
HQYDN
HRMNR
HVGLF
HZ~
I-F
I09
IHE
IJ-
IKXTQ
ITM
IWAJR
IXC
IZIGR
IZQ
I~X
I~Z
J-C
J0Z
JBSCW
JCJTX
JZLTJ
KDC
KOV
KOW
L6V
LAS
LLZTM
M4Y
M7S
MA-
ML~
N2Q
N9A
NB0
NDZJH
NPVJJ
NQJWS
NU0
O9-
O93
O9G
O9I
O9J
OAM
P19
P9P
PF0
PT4
PT5
PTHSS
QOK
QOS
R4E
R89
R9I
RHV
RIG
RNI
RNS
ROL
RPX
RSV
RZK
S16
S1Z
S26
S27
S28
S3B
SAP
SCLPG
SCV
SDH
SDM
SEG
SHX
SISQX
SJYHP
SNE
SNPRN
SNX
SOHCF
SOJ
SPISZ
SRMVM
SSLCW
STPWE
SZN
T13
T16
TN5
TSG
TSK
TSV
TUC
TUS
U2A
UG4
UOJIU
UTJUX
UZXMN
VC2
VFIZW
W23
W48
WK8
YLTOR
Z45
Z5O
Z7R
Z7S
Z7V
Z7W
Z7X
Z7Y
Z7Z
Z81
Z83
Z85
Z86
Z88
Z8M
Z8N
Z8P
Z8Q
Z8R
Z8S
Z8T
Z8U
Z8V
Z8W
Z8Z
Z92
ZMTXR
ZY4
_50
~8M
~A9
~EX
AAPKM
AAYXX
ABBRH
ABDBE
ABFSG
ABRTQ
ACSTC
ADHKG
AEZWR
AFDZB
AFFHD
AFHIU
AFOHR
AGQPQ
AHPBZ
AHWEU
AIXLP
ATHPR
AYFIA
CITATION
PHGZM
PHGZT
PQGLB
DWQXO
PKEHL
PQEST
PQQKQ
PQUKI
PRINS
ID FETCH-LOGICAL-c316t-c4fe292615564e9397696c620b517323c7e9aa782c2ca7128d56fcaff46ddc0b3
IEDL.DBID M7S
ISICitedReferencesCount 3
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000259961500014&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0268-3768
IngestDate Tue Nov 04 23:14:50 EST 2025
Sat Nov 29 05:50:42 EST 2025
Tue Nov 18 21:34:51 EST 2025
Fri Feb 21 02:30:51 EST 2025
IsPeerReviewed true
IsScholarly true
Issue 7-8
Keywords Inventory capacity
Lost sale
Stockout
Dynamic programming
Production planning
Language English
License http://www.springer.com/tdm
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c316t-c4fe292615564e9397696c620b517323c7e9aa782c2ca7128d56fcaff46ddc0b3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
PQID 2262506491
PQPubID 2044010
PageCount 9
ParticipantIDs proquest_journals_2262506491
crossref_primary_10_1007_s00170_007_1246_y
crossref_citationtrail_10_1007_s00170_007_1246_y
springer_journals_10_1007_s00170_007_1246_y
PublicationCentury 2000
PublicationDate 20081100
2008-11-00
20081101
PublicationDateYYYYMMDD 2008-11-01
PublicationDate_xml – month: 11
  year: 2008
  text: 20081100
PublicationDecade 2000
PublicationPlace London
PublicationPlace_xml – name: London
– name: Heidelberg
PublicationTitle International journal of advanced manufacturing technology
PublicationTitleAbbrev Int J Adv Manuf Technol
PublicationYear 2008
Publisher Springer-Verlag
Springer Nature B.V
Publisher_xml – name: Springer-Verlag
– name: Springer Nature B.V
References Aggarwal, Park (CR5) 1993; 41
Shaw, Wagelmans (CR14) 1998; 44
Bitran, Yanasse (CR16) 1982; 28
Gutierrez, Sedeno-Noda, Colebrook, Sicilia (CR19) 2002; 30
Gutierrez, Sedeno-Noda, Colebrook, Sicilia (CR20) 2007; 34
Aksen, Altinkemer, Chand (CR24) 2003; 147
Zangwill (CR26) 1968; 14
Wagner, Whitin (CR4) 1958; 5
Florian, Lenstra, Rinnooy (CR8) 1980; 26
Baker, Dixon, Magazine, Silver (CR15) 1978; 24
Erensal, Oncan, Demircan (CR2) 2006; 176
Wagelmans, Hoesel, Kolen (CR7) 1992; 40
Swoveland (CR11) 1975; 21
Chen, Hean (CR13) 1994; 4
Zangwill (CR27) 1969; 15
Sandbothe, Thompson (CR1) 1990; 38
Sandbothe, Thompson (CR23) 1993; 20
Federgruen, Tzur (CR6) 1991; 37
CR25
Atamturk, Kucukyavuz (CR21) 2005; 53
Shang, Fromherz (CR3) 2003; 153
Hoesel, Wagelmans (CR10) 1996; 42
Heuvel, Wagelmans (CR22) 2006; 33
Chung, Lin (CR17) 1994; 75
Kirca (CR12) 1990; 45
Florian, Klein (CR9) 1971; 18
Love (CR18) 1973; 20
YC Erensal (1246_CR2) 2006; 176
HD Chen (1246_CR13) 1994; 4
CPMV Hoesel (1246_CR10) 1996; 42
1246_CR25
WI Zangwill (1246_CR26) 1968; 14
SF Love (1246_CR18) 1973; 20
RA Sandbothe (1246_CR23) 1993; 20
A Atamturk (1246_CR21) 2005; 53
Y Shang (1246_CR3) 2003; 153
CA Swoveland (1246_CR11) 1975; 21
O Kirca (1246_CR12) 1990; 45
RA Sandbothe (1246_CR1) 1990; 38
WI Zangwill (1246_CR27) 1969; 15
J Gutierrez (1246_CR19) 2002; 30
M Florian (1246_CR8) 1980; 26
DX Shaw (1246_CR14) 1998; 44
KB Baker (1246_CR15) 1978; 24
D Aksen (1246_CR24) 2003; 147
GR Bitran (1246_CR16) 1982; 28
WVD Heuvel (1246_CR22) 2006; 33
A Federgruen (1246_CR6) 1991; 37
J Gutierrez (1246_CR20) 2007; 34
M Florian (1246_CR9) 1971; 18
HM Wagner (1246_CR4) 1958; 5
A Aggarwal (1246_CR5) 1993; 41
CSF Chung (1246_CR17) 1994; 75
A Wagelmans (1246_CR7) 1992; 40
References_xml – volume: 37
  start-page: 909
  year: 1991
  end-page: 925
  ident: CR6
  article-title: A single forward algorithm to solve general dynamic lot sizing models with periods in ( log ) or ( ) time
  publication-title: Manag Sci
– volume: 44
  start-page: 831
  year: 1998
  end-page: 838
  ident: CR14
  article-title: An algorithm for single item capacitated economic lot-sizing with piecewise linear production costs and general holding costs
  publication-title: Manag Sci
– volume: 45
  start-page: 15
  year: 1990
  end-page: 24
  ident: CR12
  article-title: An efficient algorithm for the capacitated single item dynamic lot size problem
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(90)90152-2
– volume: 21
  start-page: 1007
  issue: 9
  year: 1975
  end-page: 1013
  ident: CR11
  article-title: Deterministic multi-period production planning model with piecewise concave production and holding-backorder costs
  publication-title: Manag Sci
  doi: 10.1287/mnsc.21.9.1007
– volume: 153
  start-page: 1
  year: 2003
  end-page: 36
  ident: CR3
  article-title: Experimental complexity analysis of continuous constraint satisfaction problems
  publication-title: Inform Sci
  doi: 10.1016/S0020-0255(03)00065-3
– volume: 30
  start-page: 383
  year: 2002
  end-page: 395
  ident: CR19
  article-title: A new characterization for the dynamic lot size problem with bounded inventory
  publication-title: Comput & Oper Res
  doi: 10.1016/S0305-0548(01)00105-8
– volume: 75
  start-page: 427
  year: 1994
  end-page: 440
  ident: CR17
  article-title: An effective algorithm for the capacitated single item lot size problem
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(94)90086-8
– volume: 176
  start-page: 2755
  year: 2006
  end-page: 2770
  ident: CR2
  article-title: Determining key capabilities in technology management using fuzzy analytic hierarchy process: A case study of Turkey
  publication-title: Inform Sci
  doi: 10.1016/j.ins.2005.11.004
– volume: 38
  start-page: 474
  issue: 3
  year: 1990
  end-page: 486
  ident: CR1
  article-title: A forward algorithm for the capacitated lot size model with stockouts
  publication-title: Oper Res
  doi: 10.1287/opre.38.3.474
– volume: 33
  start-page: 3583
  year: 2006
  end-page: 3599
  ident: CR22
  article-title: An efficient dynamic programming algorithm for a special case of the capacitated lot sizing problem
  publication-title: Comput & Oper Res
  doi: 10.1016/j.cor.2005.02.046
– volume: 28
  start-page: 1174
  issue: 10
  year: 1982
  end-page: 1186
  ident: CR16
  article-title: Computational complexity of the capacitated lot size problem
  publication-title: Manag Sci
– volume: 18
  start-page: 12
  issue: 1
  year: 1971
  end-page: 20
  ident: CR9
  article-title: Deterministic production planning with concave costs and capacity constraints
  publication-title: Manag Sci
– ident: CR25
– volume: 34
  start-page: 934
  issue: 4
  year: 2007
  end-page: 937
  ident: CR20
  article-title: A polynomial algorithm for the production/ordering planning problem with limited storage
  publication-title: Comput & Oper Res
  doi: 10.1016/j.cor.2005.05.029
– volume: 20
  start-page: 313
  issue: 3
  year: 1973
  end-page: 318
  ident: CR18
  article-title: Bounded production and inventory models with piecewise concave costs
  publication-title: Manag Sci
– volume: 40
  start-page: 145
  year: 1992
  end-page: 156
  ident: CR7
  article-title: Economic lot-sizing: An ( log ) algorithm that runs in linear time in the Wagner-Whitin case
  publication-title: Oper Res
– volume: 53
  start-page: 711
  issue: 4
  year: 2005
  end-page: 730
  ident: CR21
  article-title: Lot sizing with inventory bounds and fixed costs: Polyhedral study and computation
  publication-title: Oper Res
  doi: 10.1287/opre.1050.0223
– volume: 4
  start-page: 285
  year: 1994
  end-page: 330
  ident: CR13
  article-title: A new dynamic programming algorithm for the single item capacitated dynamic lot size model
  publication-title: J Global Optim
  doi: 10.1007/BF01098363
– volume: 41
  start-page: 549
  issue: 3
  year: 1993
  end-page: 571
  ident: CR5
  article-title: Improved algorithms for economic lot-size problems
  publication-title: Oper Res
– volume: 26
  start-page: 669
  issue: 7
  year: 1980
  end-page: 679
  ident: CR8
  article-title: Deterministic production planning: Algorithm and complexity
  publication-title: Manag Sci
– volume: 20
  start-page: 455
  issue: 5
  year: 1993
  end-page: 465
  ident: CR23
  article-title: Decision horizons for the capacitated lot size model with inventory bounds and stockouts
  publication-title: Comput Oper Res
  doi: 10.1016/0305-0548(93)90010-G
– volume: 14
  start-page: 429
  issue: 9
  year: 1968
  end-page: 450
  ident: CR26
  article-title: Minimum concave cost flows in certain networks
  publication-title: Manag Sci
– volume: 147
  start-page: 558
  year: 2003
  end-page: 566
  ident: CR24
  article-title: The single-item lot sizing production with immediate lost sales
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(02)00331-4
– volume: 5
  start-page: 89
  year: 1958
  end-page: 96
  ident: CR4
  article-title: Dynamic version of the economic lot size model
  publication-title: Manag Sci
– volume: 42
  start-page: 142
  year: 1996
  end-page: 150
  ident: CR10
  article-title: An ( ) algorithm for the economic lot-sizing problem with constant capacities
  publication-title: Manag Sci
– volume: 24
  start-page: 1710
  issue: 16
  year: 1978
  end-page: 1720
  ident: CR15
  article-title: An algorithm for the dynamic lot-size problem with time-varying production capacity constraints
  publication-title: Manag Sci
– volume: 15
  start-page: 506
  issue: 9
  year: 1969
  end-page: 527
  ident: CR27
  article-title: A backlogging model and a multi-echelon model of a dynamic economic lot size production system – a network approach
  publication-title: Manag Sci
– volume: 147
  start-page: 558
  year: 2003
  ident: 1246_CR24
  publication-title: Eur J Oper Res
  doi: 10.1016/S0377-2217(02)00331-4
– volume: 44
  start-page: 831
  year: 1998
  ident: 1246_CR14
  publication-title: Manag Sci
  doi: 10.1287/mnsc.44.6.831
– volume: 28
  start-page: 1174
  issue: 10
  year: 1982
  ident: 1246_CR16
  publication-title: Manag Sci
  doi: 10.1287/mnsc.28.10.1174
– volume: 45
  start-page: 15
  year: 1990
  ident: 1246_CR12
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(90)90152-2
– volume: 20
  start-page: 313
  issue: 3
  year: 1973
  ident: 1246_CR18
  publication-title: Manag Sci
  doi: 10.1287/mnsc.20.3.313
– volume: 40
  start-page: 145
  year: 1992
  ident: 1246_CR7
  publication-title: Oper Res
  doi: 10.1287/opre.40.1.S145
– ident: 1246_CR25
– volume: 15
  start-page: 506
  issue: 9
  year: 1969
  ident: 1246_CR27
  publication-title: Manag Sci
  doi: 10.1287/mnsc.15.9.506
– volume: 41
  start-page: 549
  issue: 3
  year: 1993
  ident: 1246_CR5
  publication-title: Oper Res
  doi: 10.1287/opre.41.3.549
– volume: 176
  start-page: 2755
  year: 2006
  ident: 1246_CR2
  publication-title: Inform Sci
  doi: 10.1016/j.ins.2005.11.004
– volume: 24
  start-page: 1710
  issue: 16
  year: 1978
  ident: 1246_CR15
  publication-title: Manag Sci
  doi: 10.1287/mnsc.24.16.1710
– volume: 153
  start-page: 1
  year: 2003
  ident: 1246_CR3
  publication-title: Inform Sci
  doi: 10.1016/S0020-0255(03)00065-3
– volume: 18
  start-page: 12
  issue: 1
  year: 1971
  ident: 1246_CR9
  publication-title: Manag Sci
  doi: 10.1287/mnsc.18.1.12
– volume: 33
  start-page: 3583
  year: 2006
  ident: 1246_CR22
  publication-title: Comput & Oper Res
  doi: 10.1016/j.cor.2005.02.046
– volume: 14
  start-page: 429
  issue: 9
  year: 1968
  ident: 1246_CR26
  publication-title: Manag Sci
  doi: 10.1287/mnsc.14.7.429
– volume: 21
  start-page: 1007
  issue: 9
  year: 1975
  ident: 1246_CR11
  publication-title: Manag Sci
  doi: 10.1287/mnsc.21.9.1007
– volume: 38
  start-page: 474
  issue: 3
  year: 1990
  ident: 1246_CR1
  publication-title: Oper Res
  doi: 10.1287/opre.38.3.474
– volume: 37
  start-page: 909
  year: 1991
  ident: 1246_CR6
  publication-title: Manag Sci
  doi: 10.1287/mnsc.37.8.909
– volume: 30
  start-page: 383
  year: 2002
  ident: 1246_CR19
  publication-title: Comput & Oper Res
  doi: 10.1016/S0305-0548(01)00105-8
– volume: 20
  start-page: 455
  issue: 5
  year: 1993
  ident: 1246_CR23
  publication-title: Comput Oper Res
  doi: 10.1016/0305-0548(93)90010-G
– volume: 75
  start-page: 427
  year: 1994
  ident: 1246_CR17
  publication-title: Eur J Oper Res
  doi: 10.1016/0377-2217(94)90086-8
– volume: 26
  start-page: 669
  issue: 7
  year: 1980
  ident: 1246_CR8
  publication-title: Manag Sci
  doi: 10.1287/mnsc.26.7.669
– volume: 42
  start-page: 142
  year: 1996
  ident: 1246_CR10
  publication-title: Manag Sci
  doi: 10.1287/mnsc.42.1.142
– volume: 53
  start-page: 711
  issue: 4
  year: 2005
  ident: 1246_CR21
  publication-title: Oper Res
  doi: 10.1287/opre.1050.0223
– volume: 5
  start-page: 89
  year: 1958
  ident: 1246_CR4
  publication-title: Manag Sci
  doi: 10.1287/mnsc.5.1.89
– volume: 4
  start-page: 285
  year: 1994
  ident: 1246_CR13
  publication-title: J Global Optim
  doi: 10.1007/BF01098363
– volume: 34
  start-page: 934
  issue: 4
  year: 2007
  ident: 1246_CR20
  publication-title: Comput & Oper Res
  doi: 10.1016/j.cor.2005.05.029
SSID ssj0016168
ssib034539549
ssib019759004
ssib029851711
Score 1.8639064
Snippet In petrochemical manufacturing, food processing, glass manufacturing, etc., there is a situation where the production planning is subject to the limit of...
SourceID proquest
crossref
springer
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 774
SubjectTerms Algorithms
CAE) and Design
Complexity
Computer-Aided Engineering (CAD
Cost function
Engineering
Food processing
Industrial and Production Engineering
Mechanical Engineering
Media Management
Original Article
Polynomials
Production capacity
Production planning
SummonAdditionalLinks – databaseName: Springer LINK
  dbid: RSV
  link: http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3dS8MwEA86fdAHv8XplDz4pATaJEubxyEO8WGIX-ytJGmqg7mWbQr7781lbaeigr4Vcmnp5a53zeV-P4RORRRwzWJNYmo14TwVRMeKkixKM54ZZtJAe7KJqNeL-315U_ZxT6rT7lVJ0n-p62Y3D_VCYGvNxSRBZstoxUW7GLzx9u6xMqJQRkCEWRsZlcA-vzBixttsXtoqSw0i9P1y7l8kBm-Lq9Lnd4_8HLwWGemXIqqPTd3Nf73VFtooU1HcmdvONlqyox20_gGgcBddd3CRD2fQuuwkgYceq-FTPh5Mn1-wS3dxMQeMdYuLi5L-CMPWLtZA12RTPPCH2vPxbA89dC_vL65Iyb5ADAvFlBieWSop1C0FtxLyFimMoIF2-mSUmchKpVyCYahRkQtzaVtkRmUZF2lqAs32UWOUj-wBwrHSNHJBgXM3qiTXlqVhkElACYXG2yYKKrUmpoQmB4aMYVKDKns1JXAJakpmTXRWTynmuBy_CbeqtUpKF50kLu-kgNYnwyY6r9ZmMfzjzQ7_JH2E1vwJE9-92EKN6fjVHqNV8zYdTMYn3nLfARkL4_4
  priority: 102
  providerName: Springer Nature
Title A polynomial time algorithm for production planning with bounded inventory
URI https://link.springer.com/article/10.1007/s00170-007-1246-y
https://www.proquest.com/docview/2262506491
Volume 39
WOSCitedRecordID wos000259961500014&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVPQU
  databaseName: Engineering Database
  customDbUrl:
  eissn: 1433-3015
  dateEnd: 20221231
  omitProxy: false
  ssIdentifier: ssj0016168
  issn: 0268-3768
  databaseCode: M7S
  dateStart: 19970201
  isFulltext: true
  titleUrlDefault: http://search.proquest.com
  providerName: ProQuest
– providerCode: PRVPQU
  databaseName: ProQuest Central
  customDbUrl:
  eissn: 1433-3015
  dateEnd: 20221231
  omitProxy: false
  ssIdentifier: ssj0016168
  issn: 0268-3768
  databaseCode: BENPR
  dateStart: 19970201
  isFulltext: true
  titleUrlDefault: https://www.proquest.com/central
  providerName: ProQuest
– providerCode: PRVAVX
  databaseName: Springer LINK
  customDbUrl:
  eissn: 1433-3015
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0016168
  issn: 0268-3768
  databaseCode: RSV
  dateStart: 19970101
  isFulltext: true
  titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22
  providerName: Springer Nature
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1LTxsxEB4V6AEO0BZQw0s-9FRksWsb7_qEKCKqeoiiAFVuq_VjIVJItkmolH9fj-NNChJcuKxW8kNaz9gz65n5PoBvMkuE5rmmOXOaCmEl1XnJaJXZSlSGG5voQDaRdTp5v6-68cJtGtMqmzMxHNR2bPCO_My7CQzB1VR6Uf-hyBqF0dVIobEGG4iSwELq3k2jT6nKkBNzqW9MIRH9Sp-5OOeLKFeMOsg0lM7535IcN17eREGTADoaKFoQUpEJSefP7djKOX0RTw1mqr3z3g_8BNvRQSWXC436DB_c6Ats_QdbuAu_Lkk9Hs6xoNn3RHZ6Ug7v_Vyzh0finWBSL2BkvchJHUmRCF74Eo0kTs6SQUh1H0_me3DXvr69-kkjJwM1PJUzakTlmGIYzZTCKfRmlDSSJdovLWfcZE6VpXc7DDNl5o2fPZeVKatKSGtNovk-rI_GI_cVSF5qlnlTIYRvLZXQjts0qRRih2I5bguSZoULEwHLkTdjWCyhloNQCnxFoRTzFnxfDqkXaB1vdT5qBFHEjTstVlJowWkjylXzq5MdvD3ZIWyGRJNQxHgE67PJkzuGj-bvbDCdnMDGj-tOt3cStNc_eze__wFGFvCX
linkProvider ProQuest
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMw1V3NT9RAFH9BNBEO-ElYRJ2DXjQT2pnZaedgCAEJCG5MxIRb7XxUNll2y26V9J_ib2TetN1VE7lx8NZk2knb9zUz773fD-CNTCKheappypymQlhJdZozWiS2EIXhxkY6kE0kg0F6dqa-LMF11wuDZZWdTwyO2k4MnpFv-2UCQ3A1Fe-UlxRZozC72lFoNGpx7Oorv2WbfTja9_J9y9jBx9O9Q9qyClDDY1lRIwrHFMN8nBROYTxW0kgW6X6ccMZN4lSe-8BpmMkT775tXxYmLwohrTWR5n7ee3BfoPcPpYJfO_2NVYIcnHP9ZgqJ7xf2w0WfN1m1Nssh49Cq57dBKRp62mVdowByGihhEMKRCUnrP-PmYjH8V_42hMWDR__bD30Ma-0CnOw2FvMEltz4Kaz-Bsv4DD7tknIyqrFh299ZDS8cyUc__LtX5xfEL_JJ2cDkepUmZUv6RPBAm2gkqXKWDEMp_2RaP4dvd_Ix67A8nozdBpA01yzxoVAIP5oroR23cVQoxEbFduMeRJ1EM9MCsiMvyCibQ0kHJcjwEpUgq3vwbv5I2aCR3HbzVif4rHVMs2wh9R6871RnMfzPyTZvn-w1PDw8_XySnRwNjl_ASiiqCQ2bW7BcTX-6l_DA_KqGs-mrYDEEvt-1Rt0AsqlKIQ
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV3fT9swED5tDE3sYRswRDfG_MATyCKxXSd-RNuqbUwV0gDxFsW_oFLXRm2Y1P9-PidpYWJI094i2U6Uu7Pu7Lv7PoADmSVC81zTnDlNhbCS6rxk1GfWC2-4sYmOZBPZcJhfXamzlud03lW7dynJpqcBUZom9XFl_fGy8S3CvlC8Zgv-SdLFU3gmkDMIj-s_LjuDSlWGpJhLg2MKmehXBs1FnzdprjbtINPYOxfOJTnuvLxLgz70yfuObBWd_pFQjX5q8Oq___A1vGxDVHLS2NQmPHGTLXhxB7hwG76dkGo6XmBLc5iJ_PSkHF9PZ6P65icJYTCpGiDZoHRStbRIBK98iUYaJ2fJKBa7T2eLN3Ax-Hz-8QttWRmo4amsqRHeMcUwnymFUxjPKGkkS3SQLWfcZE6VZQg8DDNlFtyf7UtvSu-FtNYkmu_A2mQ6cbtA8lKzLDgLIcJoqYR23KaJV4geig25PUg6ERemhSxH5oxxsQRbjmIq8BHFVCx6cLhcUjV4HY9N3uv0VrRbd16EeJQhip9Ke3DU6Wk1_NeXvf2n2R_g-dmnQfH96_D0HWzEIpTY4LgHa_Xs1r2HdfOrHs1n-9GgfwMFXu_G
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+polynomial+time+algorithm+for+production+planning+with+bounded+inventory&rft.jtitle=International+journal+of+advanced+manufacturing+technology&rft.au=Liu%2C+X&rft.date=2008-11-01&rft.pub=Springer+Nature+B.V&rft.issn=0268-3768&rft.eissn=1433-3015&rft.volume=39&rft.issue=7-8&rft.spage=774&rft.epage=782&rft_id=info:doi/10.1007%2Fs00170-007-1246-y
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0268-3768&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0268-3768&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0268-3768&client=summon