Citace podle APA (7th ed.)

Li, S., Chen, R., & Li, W. (2018). Proportionate Flow Shop Scheduling with Multi-agents to Maximize Total Gains of JIT Jobs. Arabian journal for science and engineering (2011), 43(2), 969-978. https://doi.org/10.1007/s13369-017-2900-9

Citace podle Chicago (17th ed.)

Li, Shi-Sheng, Ren-Xia Chen, a Wen-Jie Li. "Proportionate Flow Shop Scheduling with Multi-agents to Maximize Total Gains of JIT Jobs." Arabian Journal for Science and Engineering (2011) 43, no. 2 (2018): 969-978. https://doi.org/10.1007/s13369-017-2900-9.

Citace podle MLA (9th ed.)

Li, Shi-Sheng, et al. "Proportionate Flow Shop Scheduling with Multi-agents to Maximize Total Gains of JIT Jobs." Arabian Journal for Science and Engineering (2011), vol. 43, no. 2, 2018, pp. 969-978, https://doi.org/10.1007/s13369-017-2900-9.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..