Ho, J. C., López, F. J., Ruiz-Torres, A. J., & (Bill) Tseng, T. (2011). Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines. Journal of intelligent manufacturing, 22(2), 179-190. https://doi.org/10.1007/s10845-009-0270-1
Chicago Style (17th ed.) CitationHo, Johnny C., Francisco J. López, Alex J. Ruiz-Torres, and Tzu-Liang (Bill) Tseng. "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines." Journal of Intelligent Manufacturing 22, no. 2 (2011): 179-190. https://doi.org/10.1007/s10845-009-0270-1.
MLA (9th ed.) CitationHo, Johnny C., et al. "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines." Journal of Intelligent Manufacturing, vol. 22, no. 2, 2011, pp. 179-190, https://doi.org/10.1007/s10845-009-0270-1.