Ho, J. C., López, F. J., Ruiz-Torres, A. J., & (Bill) Tseng, T. (2011). Minimizing total weighted flowtime subject to minimum makespan on two identical parallel machines. Journal of intelligent manufacturing, 22(2), 179-190. https://doi.org/10.1007/s10845-009-0270-1
Citace podle Chicago (17th ed.)Ho, Johnny C., Francisco J. López, Alex J. Ruiz-Torres, a Tzu-Liang (Bill) Tseng. "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines." Journal of Intelligent Manufacturing 22, no. 2 (2011): 179-190. https://doi.org/10.1007/s10845-009-0270-1.
Citace podle MLA (9th ed.)Ho, Johnny C., et al. "Minimizing Total Weighted Flowtime Subject to Minimum Makespan on Two Identical Parallel Machines." Journal of Intelligent Manufacturing, vol. 22, no. 2, 2011, pp. 179-190, https://doi.org/10.1007/s10845-009-0270-1.