Zhang, Y., & Yuan, J. (2019). A note on a two-agent scheduling problem related to the total weighted late work. Journal of combinatorial optimization, 37(3), 989-999. https://doi.org/10.1007/s10878-018-0337-z
Citace podle Chicago (17th ed.)Zhang, Yuan, a Jinjiang Yuan. "A Note on a Two-agent Scheduling Problem Related to the Total Weighted Late Work." Journal of Combinatorial Optimization 37, no. 3 (2019): 989-999. https://doi.org/10.1007/s10878-018-0337-z.
Citace podle MLA (9th ed.)Zhang, Yuan, a Jinjiang Yuan. "A Note on a Two-agent Scheduling Problem Related to the Total Weighted Late Work." Journal of Combinatorial Optimization, vol. 37, no. 3, 2019, pp. 989-999, https://doi.org/10.1007/s10878-018-0337-z.
Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..