Rastgar, I., Rezaeian, J., Mahdavi, I., & Fattahi, P. (2024). Modeling and solving the multi-objective energy-efficient production planning and scheduling with imperfect maintenance activities. Journal of quality in maintenance engineering, 30(1), 26-50. https://doi.org/10.1108/JQME-10-2022-0068
Citácia podle Chicago (17th ed.)Rastgar, Iman, Javad Rezaeian, Iraj Mahdavi, a Parviz Fattahi. "Modeling and Solving the Multi-objective Energy-efficient Production Planning and Scheduling with Imperfect Maintenance Activities." Journal of Quality in Maintenance Engineering 30, no. 1 (2024): 26-50. https://doi.org/10.1108/JQME-10-2022-0068.
Citácia podľa MLA (8th ed.)Rastgar, Iman, et al. "Modeling and Solving the Multi-objective Energy-efficient Production Planning and Scheduling with Imperfect Maintenance Activities." Journal of Quality in Maintenance Engineering, vol. 30, no. 1, 2024, pp. 26-50, https://doi.org/10.1108/JQME-10-2022-0068.